Decree 1241-632 '0n creation or the Command Measurement Complex' was issued. The decree marked the beginning of development of the KIK satellite tracking system. This network was put together using a combination of PVO (Air Defence) and ICBM tracking systems. Trajectory information was fed into the KIK Centre for orbital calculations. The Centre was staffed by 680 officers and 151 civilian scientists of the Soviet Army in four sections.
Meeting of Kamanin with S G Donevskiy. The L3 trainer will not be finished until May 1970 - and the current schedule for the first manned L3 launch is December 1970! But in any case Kamanin assesses the latter date as unrealistic -- there is no rocket or spacecraft in being yet. Later in the day Efimov, Moroz, and Kamanin meet with the female cosmonauts - Ponomaryova, Solovyova, Yerkina, and Kuznetsova. They advise them that despite the letter to the Central Committee asking for an all-female Soyuz flight, it has been rejected. Ustinov, Smirnov, and Pashkov are all opposed to the idea, as are MOM, MAP, AN, and VVS. Kamanin believes the whole female cosmonaut concept was a mistake. Flying Tereshkova in the first place started the whole thing, but now there is no follow-up.
TDV-2, the second of three technology development vehicle flights in CY 1977, was successfully launched from Vandenberg AFB to the Kwajalein missile range on a Minuteman I booster. It successfully conducted complex experiments dealing with nosetip materials, aerodynamics, and electronics. A P 06-L star traffic decoy was successfully tested on the same flight.
High resolution photo surveillance; film capsule; maneuverable; also performed earth resources tasks. Investigation of the natural resources of the earth in the interests of various branches of the national economy of the USSR and international cooperation.
Engineering test satellite. Engineering Test Satellite III (ETS-III) launched 0500 GMT 3 Sep 1982 from Osaki launch site, Tanegashima. Launching organization: National Space Development Agency of Japan (NASDA). Verification of three axis attitude control function; verification of so lar array paddle deployment function; verification of active thermal control function; functional test of mission equipment in the space. N launch vehicle flight no 9.
Stationed at 99 deg E. Transmission of Central Television programmes to a network of receivers for collective use. Positioned in geosynchronous orbit at 99 deg E in 1987-1989 As of 31 August 2001 located at 146.34 deg W drifting at 13.641 deg W per day. As of 2007 Mar 10 located at 69.25E drifting at 13.645W degrees per day.
US Navy communications. Spacecraft engaged in practical applications and uses of space technology such as weather or communication (US Cat C). Launch vehicle put payload into subsynchronous earth orbit with MRS trajectory option. Positioned in geosynchronous orbit at 72 deg E in 1993-1999.
Mir Expedition EO-20. Crew commander was Yuriy Pavlovich Gidzenko of the Russian Air Force. Flight engineer was Sergey Vasilyevich Avdeev of RKK Energiya, and cosmonaut-researcher was Thomas Reiter of the European Space Agency. Soyuz TM-22 docked with Mir's front (-X) port at 10:29:54 GMT on September 5 and the hatch was opened at 11:01:23.
Today Progress-M32 concluded her autonomous flight. This flight began on 18.08.1996 , so 1 day before the docking of Soyuz-TM24. Approach and docking took place 1 orbit later than originally planned and was executed in the automatic mode with the system Kurs. The docking at the aft docking port (Kvant, +X-axis) was accomplished on 3.09 at 09.35.21 UTC. For those monitoring operations like this the delay of this operation until orbit 60212 from 0927-0932 UTC was a piece of good luck because of the fact that they could monitor the final phase of the operation. Commander Korzun observed the approach via the displays of the systems LIV and TORU and reported distances, approach speeds and manoeuvres around the X-axis. When both objects disappeared behind the horizon the distance was 95 meters and the appr. speed 0.8 M/sec. During the pass in orb. 60213 from 1102-1108 UTC it was obvious that Progress-M32 was a part of the Mir-complex again. Meanwhile Korzun had corrected the attitude of the complex. He got orders not to carry out the airseal checks and the opening of the hatch today.
(So in a relative short period the Russians successfully accomplished crucial operations. As far as Russian spaceflight is concerned Aleksandr Lebedj has nothing to worry about!!)
Chris v.d. Berg, NL-9165/A-UK3202.
Vinogradov worked hard on the deployment of cables from the Spektr hatch to other modules and gradually he succeeded in restoring a part of the power supply for the modules Kvant-2 and Kristall. The 3 undamaged solar panels of Spektr delivered power, but rotation to achieve maximum solar illumination is not yet possible. Solovyov struggled along to keep Elektron in Kvant-1 operational and he also used power for the restoration of the Elektron in Kvant-2. On 25.08 Elektron in Kvant-1 shut itself off and the TGK (the solid fuel oxygen generator) did not work due to a defective firing pin. Before the outbreak of the usual press panic the cosmonauts had already repaired the TGK and Elektron in Kvant-1. The power supply is partly restored in Kvant-2 and Kristall: the lights are burning, the heating functions again and the drying process is going on.
EVA preparations:
Solovyov and Foale were convinced that they would get green light for the EVA on 6.09 and they started the preparations. Several times they donned their Orlan-M suits, checked all systems and took a stock of all the equipment needed for the EVA. Foale saw a film of his EVA training with Budarin in TsPK. He and S. also reviewed the so called 'cyclogram' of the EVA. The training of Foale during which Solovyov was instructor served also as a test to determine whether Foale will be able to do the EVA or not.
Communications:
The Altair-2 is regularly in use for communications between Mir and TsUP. They use this satellite for phone as well as for TV. On 1, 2 and 3.09 they showed images of their training, also with their space suits on, but also now and then video films of the interior and the outer surface of the complex. If on 4.09.1997 a positive decision will be taken the EVA will be made on 6.09.97. Opening of the hatch: 0055 UTC; planned duration 5 hrs 40 mins. Chris v.d. Berg, NL-9165/A-UK3202.
The hatch was opened at 16:43 GMT. The astronauts used the Russian Orlan suits M-25 and M-26, requiring them to exit from the Pirs module airlock. The 70 kg PIG container on the Zarya module with the RRZh1 flow regulator valve panel was removed and jettisoned Three antennae were installed on the Zvezda module for future rendezvous and docking operations with the European ATV logistics spacecraft.
ABM Target. First Silver Sparrow target missile on a suborbital flight from an F-15 airplane over the Mediterranean Sea. Launched eastward towards the Israeli coast, for tests of Israeli missile defense radars. The flight's detection by Russian tracking systems led to some initial public consternation until the mission was acknowledged by Israel.