Viking Mars lander Credit: NASA |
Status: Operational 1974. First Launch: 1974-02-11. Last Launch: 1975-09-09. Number: 5 . Gross mass: 3,399 kg (7,493 lb).
The orbiters extensively mapped the surface of the planet. Viking was designed to orbit Mars and to land and operate on the planet's surface. Two identical spacecraft, each consisting of a lander and an orbiter, were built. These spacecraft were launched from Cape Canaveral, Florida in 1975. They spent nearly a year cruising to Mars. Viking 1 reached Mars orbit June 19, 1976, and Viking 2 began orbiting August 7, 1976. Viking 1 landed on Mars July 20, 1976 on the western slope of Chryse Planitia (the Plains of Gold) at 22.3 deg N latitude, 48 deg longitude.
Viking-DS (VDS) Null |
Viking 1 Lander Credit: Manufacturer Image |
Viking Credit: Manufacturer Image |
Viking-DS Credit: Manufacturer Image |
Viking 10 Credit: © Thomas Kladiva - Thomas Kladiva |
Viking Test Seq 02 |
Viking Test Seq 06 |
Viking Test Seq 05 |
Viking Test Seq 03 |
Viking Test Seq 01 |
Viking Test Seq 07 |
Viking Test Seq 08 |
Viking Test Seq 04 |
National Academy of Sciences report outlining research objectives in lunar and planetary exploration for the 1970s and early 1980s. The Space Science Board of the National Academy of Sciences issued a report outlining research objectives in lunar and planetary exploration for the 1970s and early 1980s. The report affirmed earlier recommendations by the Space Science Board to NASA that unmanned exploration of Mars should have first priority in the post- Apollo space era. Secondary importance was assigned to detailed investigation of the lunar surface and to unmanned Venus probes. Clearly, the report reflected a predominant mood within the scientific community that scientific research in space take predominance over manned programs whose chief objectives, said the report, were 'other than scientific.' Additional Details: here....
SAMSO and NASA signed a Memorandum of Understanding that defined the roles and responsibilities for a Titan Ill/Centaur coordinating group which would acquire Titan III launch vehicles for Viking. SAMSO and NASA signed a Memorandum of Understanding that defined the roles and responsibilities for a Titan Ill/Centaur coordinating group which would acquire Titan III launch vehicles for Viking.
The newest addition to the Titan III series, the Titan IIIE/Centaur - a meld of Air Force and NASA technology, suffered a partial failure in its first flight test from Cape Canaveral. The Titan/Centaur vehicle will be used as the launch vehicles for NASA's Viking Mars Lander in 1975 and for the United States-German Helios program.
A Titan HIE carrying a Viking payload was successfully launched from LC-41, Eastern Test Range. This was the first flight of a new oxydizer accumulator developed for the HIE. Combined Mars orbiter and lander mission; orbiter inserted in Mars orbit 6/19/76; lander soft landed on Martian surface 7/20/76Mars. Mars Orbit. Spacecraft engaged in research and exploration of the upper atmosphere or outer space (US Cat B).
A Titan HIE carrying a Viking payload was successfully launched from LC-41, Eastern Test Range. This was the first flight of a new oxydizer accumulator developed for the HIE. Spacecraft engaged in research and exploration of the upper atmosphere or outer space (US Cat B).
A Titan HIE carrying a Viking payload was successfully launched from LC-41, Eastern Test Range. This was the first flight of a new Command Receiver Set. A fire occurred at the launch site following launch and caused $2 million damage to the Aerospace Ground Equipment building. Combined Mars orbiter and lander mission; orbiter inserted in Mars orbit 8/7/76; lander soft landed on Martian surface 9/3/76Mars. Mars Orbit. Spacecraft engaged in research and exploration of the upper atmosphere or outer space (US Cat B).
A Titan HIE carrying a Viking payload was successfully launched from LC-41, Eastern Test Range. This was the first flight of a new Command Receiver Set. A fire occurred at the launch site following launch and caused $2 million damage to the Aerospace Ground Equipment building. Spacecraft engaged in research and exploration of the upper atmosphere or outer space (US Cat B).
Viking 1 reached Mars orbit June 19, 1976. Landing was planned for the US Bicentennial on July 4, but was delayed until a suitable landing site was located. The lander separated from the orbiter and touched down on the western slope of Chryse Planitia (the Plains of Gold) at 22.3 deg N latitude, 48 deg longitude.