Home - Search - Browse - Alphabetic Index: 0- 1- 2- 3- 4- 5- 6- 7- 8- 9
A- B- C- D- E- F- G- H- I- J- K- L- M- N- O- P- Q- R- S- T- U- V- W- X- Y- Z
Soyuz TMA-14
Part of ISS
ISS Expedition EO-19. Six-month, long-term, resident crew of the International Space Station.
AKA: Altair;ISS EO-19;ISS-18S. Launched: 2009-03-26. Returned: 2009-10-11. Number crew: 2 . Duration: 198.66 days.
More at: Soyuz TMA-14.
Family:
Manned spaceflight.
People:
Barratt,
Padalka.
Spacecraft:
Soyuz TMA.
2009 March 26 - .
11:49 GMT - .
Launch Site:
Baikonur.
Launch Complex:
Baikonur LC1.
LV Family:
R-7.
Launch Vehicle:
Soyuz-FG.
- Soyuz TMA-14 - .
Call Sign: Altair. Crew: Barratt,
Padalka,
Simonyi.
Backup Crew: Dyson,
Surayev,
Walker.
Return Crew: Barratt,
Laliberte,
Padalka.
Payload: Soyuz TMA s/n 224. Mass: 7,250 kg (15,980 lb). Nation: Russia.
Agency: RKA.
Program: ISS.
Class: Manned.
Type: Manned spacecraft. Flight: Soyuz TMA-14.
Spacecraft Bus: Soyuz.
Spacecraft: Soyuz TMA.
Duration: 198.66 days. Decay Date: 2009-10-11 . USAF Sat Cat: 34669 . COSPAR: 2009-015A. Apogee: 354 km (219 mi). Perigee: 344 km (213 mi). Inclination: 51.60 deg. Period: 91.50 min. Delivered EO-19 crew and space tourist Simonyi to ISS; returned EO-19 crew and space tourist Laliberte to earth on 11 October 2009 at 04:32 GMT..
2009 May 7 - .
18:37 GMT - .
Launch Site:
Baikonur.
Launch Complex:
Baikonur LC1.
LV Family:
R-7.
Launch Vehicle:
Soyuz-U-PVB.
- Progress M-02M - .
Payload: Progress M s/n 402. Mass: 7,120 kg (15,690 lb). Nation: Russia.
Agency: RKA.
Program: ISS.
Class: Manned.
Type: Manned logistics spacecraft. Flight: Soyuz TMA-14.
Spacecraft Bus: Soyuz.
Spacecraft: Progress M.
Duration: 67.00 days. Decay Date: 2009-07-13 . USAF Sat Cat: 34905 . COSPAR: 2009-024A. Apogee: 348 km (216 mi). Perigee: 337 km (209 mi). Inclination: 51.60 deg. Period: 91.40 min.
ISS logistics flight. Docked with the Pirs module of the ISS on 12 May at 19:24. Undocked with ISS on 30 June, conducted scientific experiments, then made a second rendezvous with the ISS at the Zvezda module to test docking systems for the upcoming Mini-Research Module 2. Backed away after getting within 10 m of the station. Retrofire on 13 July followed by burn up over the Pacific at 16:28 GMT.
2009 May 11 - .
18:02 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-125 - .
Call Sign: Atlantis. Crew: Altman,
Feustel,
Good,
Grunsfeld,
Johnson, Gregory C,
Massimino,
McArthur, Megan.
Payload: Atlantis F30 /. Mass: 119,820 kg (264,150 lb). Nation: USA.
Agency: NASA.
Program: Hubble.
Class: Manned.
Type: Manned spaceplane. Flight: Soyuz TMA-14,
STS-125.
Spacecraft Bus: Shuttle.
Spacecraft: Atlantis.
Duration: 12.90 days. Decay Date: 2009-05-24 . USAF Sat Cat: 34933 . COSPAR: 2009-025A. Apogee: 566 km (351 mi). Perigee: 302 km (187 mi). Inclination: 28.50 deg. Period: 93.30 min.
Hubble Servicing Mission SM-4. Atlantis rendezvoused with the Hubble space observatory, grappled it with the RMS arm, and secured it in the payload bay at 18:12 GMT on 13 May. After repairs and upgrades over four EVA's, the satellite was released at 12:57 GMT on 19 May. Atlantis landed at Edwards AFB at 15:39 GMT on 24 May.
2009 June 5 - .
- EVA ISS EO-20-1 - .
Crew: Barratt,
Padalka.
EVA Duration: 0.20 days. Nation: USA.
Program: ISS.
Flight: Soyuz TMA-14,
Soyuz TMA-15.
Wearing new Orlan-MK suits, the astronauts emerged from the Pirs module at 07:52 GMT. The crew added two Kurs rendezvous antennas to the exterior of Zvezda to enable arrival of the new MIM-2 Small Research Module, to be delivered by a Progress service module later in the year.
2009 June 10 - .
- EVA ISS EO-20-2 - .
Crew: Barratt,
Padalka.
EVA Duration: 0.0083 days. Nation: USA.
Program: ISS.
Flight: Soyuz TMA-14,
Soyuz TMA-15.
Internal spacewalk in a depressurized Zvezda module to reconfigure it. The spacesuited crew entered the forward transfer comparment of Zvezda and closed the hatches to Zarya and to the aft compartments of Zvezda. The transfer compartment was then depressurized at 06:22 GMT. Then a flat cover on the zenith hatch was removed and stowed on top of the Pirs hatch, leaving the port open to space. The no-longer-required docking cone on the port leading to Zarya was removed installed on the zenith port, preparing it for arrival of the new MIM-2 research/docking module later in the year. The transfer compartment was repressurized at 07:11 GMT.
2009 July 15 - .
22:03 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-127 - .
Call Sign: Endeavour. Crew: Cassidy,
Hurley,
Kopra,
Marshburn,
Payette,
Polansky,
Wolf.
Payload: Endeavour F23 / ISS 2J/4. Mass: 120,000 kg (260,000 lb). Nation: USA.
Agency: NASA.
Program: ISS.
Class: Manned.
Type: Manned spaceplane. Flight: Soyuz TMA-14,
Soyuz TMA-15,
STS-127.
Spacecraft Bus: Shuttle.
Spacecraft: Endeavour.
Duration: 15.60 days. Decay Date: 2009-07-31 . USAF Sat Cat: 35633 . COSPAR: 2009-038A. Apogee: 336 km (208 mi). Perigee: 328 km (203 mi). Inclination: 51.60 deg. Period: 91.20 min.
Crew: Polansky, Hurley, Cassidy, Marshburn, Wolf, Payette. Deliver to the ISS and install the Kibo Japanese Experiment Module Exposed Facility (JEM EF); Kibo Japanese Experiment Logistics Module - Exposed Section (ELM-ES); and Spacelab Pallet - Deployable 2 (SLP-D2).
2009 July 18 - .
- EVA STS-127-1 - .
Crew: Kopra,
Wolf.
EVA Duration: 0.23 days. Nation: USA.
Program: ISS.
Flight: Soyuz TMA-14,
Soyuz TMA-15,
STS-127.
JEF installed and P3 Nadir UCCAS deployed. S3 Zenith Outboard PAS deploy postponed due to time constraints..
2009 July 20 - .
- EVA STS-127-2 - .
Crew: Marshburn,
Wolf.
EVA Duration: 0.29 days. Nation: USA.
Program: ISS.
Flight: Soyuz TMA-14,
Soyuz TMA-15,
STS-127.
Transferred Orbital Replacement Units (ORUs) from the Shuttle Integrated Cargo Carrier (ICC) to the External Stowage Platform-3 (ESP3). Transferred materials included a spare high-gain antenna, cooling-system pump module and spare parts for the Mobile Ser.
2009 July 22 - .
- EVA STS-127-3 - .
Crew: Cassidy,
Wolf.
EVA Duration: 0.25 days. Nation: USA.
Program: ISS.
Flight: Soyuz TMA-14,
Soyuz TMA-15,
STS-127.
JPM preparation work, ICS-EF MLI, and P6 battery replacement (2 of 6 units). EVA was cut short due to high levels of CO2 in Cassidy's suit..
2009 July 24 - .
2009 July 24 - .
10:56 GMT - .
Launch Site:
Baikonur.
Launch Complex:
Baikonur LC1.
LV Family:
R-7.
Launch Vehicle:
Soyuz-U-PVB.
- Progress M-67 - .
Payload: Progress M s/n 367. Mass: 7,285 kg (16,060 lb). Nation: Russia.
Agency: RKA.
Program: ISS.
Class: Manned.
Type: Manned logistics spacecraft. Flight: Soyuz TMA-14,
Soyuz TMA-15.
Spacecraft Bus: Soyuz.
Spacecraft: Progress M.
Duration: 65.00 days. Decay Date: 2009-09-27 . USAF Sat Cat: 35641 . COSPAR: 2009-040A. Apogee: 354 km (219 mi). Perigee: 344 km (213 mi). Inclination: 51.60 deg. Period: 91.50 min. Docked at the Zvezda port of the International Space Station at 11:12 GMT on 29 July. Undocked and was deorbited over the Pacific Ocean on 27 September at 09:33 GMT..
2009 July 27 - .
- EVA STS-127-5 - .
Crew: Cassidy,
Marshburn.
EVA Duration: 0.20 days. Nation: USA.
Program: ISS.
Flight: Soyuz TMA-14,
Soyuz TMA-15,
STS-127.
SPDM thermal cover adjustment, Z1 patch panel reconfiguration, JEM visual equipment (JEM-VE) installation (forward and aft), and JEM-LTA reconfigurations. S3 Nadir PAS (outboard) deployment postponed to later mission..
2009 August 29 - .
04:00 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-128 - .
Call Sign: Discovery. Crew: Ford, Kevin,
Forrester,
Fuglesang,
Hernandez,
Olivas,
Stott,
Sturckow.
Payload: Discovery F36 /. Mass: 121,420 kg (267,680 lb). Nation: USA.
Agency: NASA.
Program: ISS.
Class: Manned.
Type: Manned spaceplane. Flight: Soyuz TMA-14,
Soyuz TMA-15,
STS-128.
Spacecraft Bus: Shuttle.
Spacecraft: Discovery .
Duration: 13.87 days. Decay Date: 2009-09-12 00:53:00 . USAF Sat Cat: 35811 . COSPAR: 2009-045A. Apogee: 352 km (218 mi). Perigee: 310 km (190 mi). Inclination: 51.60 deg. Period: 91.20 min.
Crew: Sturckow, Ford, Forrester, Hernandez, Fuglesang, Olivas. Deliver to the ISS and install the Multi-Purpose Logistics Module (MPLM); Lightweight Multi-Purpose Experiment Support Structure Carrier (LMC); Three-crew quarters, galley, and second treadmill (TVIS2); and the Crew Health Care System 2 (CHeCS 2).
2009 September 1 - .
- EVA STS-128-1 - .
Crew: Olivas,
Stott.
EVA Duration: 0.27 days. Nation: USA.
Program: ISS.
Flight: Soyuz TMA-14,
Soyuz TMA-15,
STS-128.
The crew exited at 21:48 and retrieved the EUTEF and MISSE 6 experiments from the Columbus module. The hatch was closed at 04:19 GMT..
2009 September 3 - .
2009 September 5 - .
2009 September 10 - .
17:01 GMT - .
Launch Site:
Tanegashima.
Launch Complex:
Tanegashima Y2.
LV Family:
H-2.
Launch Vehicle:
H-IIB.
- Kounotori 1 / HTV-1 - .
Mass: 16,000 kg (35,000 lb). Nation: Japan.
Agency: JAXA.
Program: ISS.
Class: Manned.
Type: Manned spacecraft. Flight: Soyuz TMA-14,
Soyuz TMA-15.
Spacecraft: HTV.
Duration: 53.00 days. Decay Date: 2009-11-02 . USAF Sat Cat: 35817 . COSPAR: 2009-048A. Apogee: 342 km (212 mi). Perigee: 334 km (207 mi). Inclination: 51.60 deg. Period: 91.30 min.
First launch of the H-IIB booster and the HTV International Space Station resupply spacecraft. HTV-1 rendezvoused with the ISS on 17 September, stationkeeping 10 m away. It was grappled by the station's Canadarm and berthed to the Harmony port of the station and then unloaded. HTV-1 was unberthed from the ISS at 15:02 GMT on 30 October 2009 and deorbited on 2 November.
Back to top of page
Home - Search - Browse - Alphabetic Index: 0- 1- 2- 3- 4- 5- 6- 7- 8- 9
A- B- C- D- E- F- G- H- I- J- K- L- M- N- O- P- Q- R- S- T- U- V- W- X- Y- Z
© 1997-2019 Mark Wade - Contact
© / Conditions for Use