Home - Search - Browse - Alphabetic Index: 0- 1- 2- 3- 4- 5- 6- 7- 8- 9
A- B- C- D- E- F- G- H- I- J- K- L- M- N- O- P- Q- R- S- T- U- V- W- X- Y- Z
Endeavour
Part of Shuttle
STS Credit: NASA |
American manned spaceplane. merican manned spaceplane. Built as a replacement after the loss of the Challenger; named after the first ship commanded by James Cook.
AKA: OV-105. Status: Operational 1992. First Launch: 1992-05-07. Last Launch: 2011-05-16. Number: 25 . Payload: 24,990 kg (55,090 lb). Thrust: 53.37 kN (11,997 lbf). Gross mass: 116,277 kg (256,346 lb). Unfuelled mass: 103,865 kg (228,983 lb). Specific impulse: 316 s. Height: 37.24 m (122.17 ft). Span: 23.79 m (78.05 ft).
Empty Weight was 68.574 kg at rollout and 78,000 kg with main engines installed.
During the construction of Discovery and Atlantis, NASA opted to have the various contractors manufacture a set of 'structural spares' to facilitate the repair of an orbiter if one was damaged during an accident. This contract was valued at $389 million and consisted of a spare aft-fuselage, mid-fuselage, forward fuselage halves, vertical tail and rudder, wings, elevons and a body flap. These spares were later assembled into the orbiter Endeavour when the decision was made to build a replacement for Challenger. Endeavour featured new hardware designed to improve and expand orbiter capabilities. Most of this equipment would be incorporated into the other three orbiters during out-of-service major inspection and modification programs. Endeavour's upgrades included:
A 40-foot diameter drag chute that reduced the orbiter's rollout distance by 300 to 600 m.
Plumbing and electrical connections needed for Extended Duration Orbiter (EDO) modifications to allow up to 28-day missions.
Updated avionics systems that included advanced general purpose computers, improved inertial measurement units and tactical air navigation systems, enhanced master events controllers and multiplexer-demultiplexers, a solid-state star tracker and improved nose wheel steering mechanisms.
An improved version of the Auxiliary Power Units (APU's) that provided power to operate the Shuttle's hydraulic systems.
Construction Milestones
07/31/87 Contract Award
02/15/82 Start structural assembly of Crew Module (as a structural spare)
09/28/87 Start structural assembly of aft-fuselage
12/22/87 Wings arrive at Palmdale from Grumman
08/01/87 Start of Final Assembly
07/06/90 Completed Final Assembly
04/25/91 Rollout from Palmdale
05/07/91 Delivery to Kennedy Space Center
04/06/92 Flight Readiness Firing
05/07/92 First Flight (STS-49)
Endeavour underwent its OMDP-1 overhaul from July 1996 to March 1997. The work was shared between Palmdale and Kennedy. Changes included installation of the final configuration ISS airlock and docking system. To reduce weight for ISS missions, most AFRSI insulation blankets on the upper surfaces of the orbiter were replaced with FRSI, lightweight crew seats were installed, the Extended Duration Mission provisions installed during OMDP-1 were removed, and numerous other smaller-scale changes aimed at reducing weight.
Crew Size: 8. Orbital Storage: 30 days. Habitable Volume: 71.50 m3. Structure: 29,658 kg (65,384 lb). Heat shield: 12,100 kg (26,600 lb). Reaction Control System: 2,800 kg (6,100 lb). Recovery Equipment: 4,200 kg (9,200 lb). Navigation Equipment: 2,000 kg (4,400 lb). Electrical Equipment: 7,000 kg (15,400 lb). Communications Systems: 700 kg (1,540 lb). Crew Seats and Provisions: 750 kg (1,650 lb). Miscellaneous Contingency: 2,400 kg (5,200 lb). Environmental Control System: 2,500 kg (5,500 lb). RCS Coarse No x Thrust: 38 x 387 N. RCS Fine No x Thrust: 6 x 107 N. RCS specific impulse: 289 sec. RCS total impulse: 9,355 kgf-sec. Spacecraft delta v: 700 m/s (2,290 ft/sec). Electric System: 12,000.00 kWh. Electric System: 14.00 average kW.
Family:
Spaceplane,
US Rocketplanes.
Country:
USA.
Engines:
OME.
Spacecraft:
ISS,
Mir.
Flights:
STS-49,
STS-47,
STS-54,
STS-57,
STS-61,
STS-59,
STS-68,
STS-67,
STS-69,
STS-72,
STS-77,
STS-89,
STS-88,
STS-99,
STS-97,
STS-100,
STS-108,
STS-111,
STS-113,
STS-118,
STS-123,
STS-126,
STS-127,
STS-130,
STS-134.
Launch Vehicles:
Space Shuttle.
Propellants:
N2O4/MMH.
Projects:
STS.
Launch Sites:
Cape Canaveral,
Cape Canaveral LC39A,
Cape Canaveral LC39B.
Agency:
NASA,
North American.
Bibliography:
15,
2,
276,
296,
3135,
44,
552,
554,
6,
66,
7,
8.
Photo Gallery
| Shuttle Night Launch Shuttle Night Launch 2 Credit: © Mark Wade |
| Shuttle Orbiter Shuttle Orbiter side view Credit: © Mark Wade |
| Shuttle Landing Credit: NASA |
| Shuttle Orbiter Shuttle Orbiter 2 view Credit: © Mark Wade |
1992 May 7 - .
23:40 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39B.
Launch Platform: MLP2.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-49 - .
Call Sign: Endeavour. Crew: Akers,
Brandenstein,
Chilton,
Hieb,
Melnick,
Thornton,
Thuot.
Payload: Endeavour F01 / Intelsat 6 SRM. Mass: 14,786 kg (32,597 lb). Nation: USA.
Related Persons: Akers,
Brandenstein,
Chilton,
Hieb,
Melnick,
Thornton,
Thuot.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-49.
Spacecraft Bus: Shuttle.
Spacecraft: Endeavour.
Duration: 8.89 days. Decay Date: 1992-05-16 . USAF Sat Cat: 21963 . COSPAR: 1992-026A. Apogee: 341 km (211 mi). Perigee: 268 km (166 mi). Inclination: 28.30 deg. Period: 90.60 min.
Retrieved Intelsat 6 and attached new SRM. First active dual rendezvous of two orbiting spacecraft (Endeavour and Intelsat-Vl). First deployment of a drag chute on the orbiter fleet. Payloads: Intelsat-Vl reboost mission hardware, Assembly of Station by EVA Methods (ASEM), Commercial Protein Crystal Growth (CPCG), Air Force Maui Optical Site (AMOS) Calibration Test, Ultraviolet Plume Instrument (UVPl).
1992 May 11 - .
20:40 GMT - .
1992 May 12 - .
21:05 GMT - .
- EVA STS-49-2 - .
Crew: Hieb,
Thuot.
EVA Duration: 0.23 days. Nation: USA.
Related Persons: Hieb,
Thuot.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-49.
Spacecraft Bus: Shuttle.
Spacecraft: Endeavour.
Second attempted capture of Intelsat V1..
1992 May 14 - .
21:17 GMT - .
1992 May 15 - .
- EVA STS-49-4 - .
Crew: Akers,
Thornton.
EVA Duration: 0.32 days. Nation: USA.
Related Persons: Akers,
Thornton.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-49.
Spacecraft Bus: Shuttle.
Spacecraft: Endeavour.
Tested tools and techniques for assembly of the International Space Station..
1992 September 12 - .
14:23 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39B.
Launch Platform: MLP2.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-47 - .
Call Sign: Endeavour. Crew: Apt,
Brown,
Davis,
Gibson,
Jemison,
Lee,
Mohri.
Payload: Endeavour F02 / Spacelab-J. Mass: 12,772 kg (28,157 lb). Nation: USA.
Related Persons: Apt,
Brown,
Davis,
Gibson,
Jemison,
Lee,
Mohri.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-47.
Spacecraft Bus: Shuttle.
Spacecraft: Endeavour.
Duration: 7.94 days. Decay Date: 1992-09-20 . USAF Sat Cat: 22120 . COSPAR: 1992-061A. Apogee: 310 km (190 mi). Perigee: 297 km (184 mi). Inclination: 57.00 deg. Period: 90.60 min.
Manned seven crew. Carried Spacelab-J with microgravity and biology experiments. Payloads: Spacelab-J, nine getaway special canister experiments, Israel Space Agency Investigation About Hornets (ISAIAH), Shuttle Amateur Radio Experiment (SAREX) II, Solid Surface Combus-tion Experiment (SSCE).
1993 January 13 - .
13:59 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39B.
Launch Platform: MLP2.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
1993 January 17 - .
1993 June 21 - .
13:07 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39B.
Launch Platform: MLP2.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-57 - .
Call Sign: Endeavour. Crew: Currie,
Duffy,
Grabe,
Low,
Voss, Janice,
Wisoff.
Payload: Endeavour F04 / GBA-5. Mass: 8,931 kg (19,689 lb). Nation: USA.
Related Persons: Currie,
Duffy,
Grabe,
Low,
Voss, Janice,
Wisoff.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-57.
Spacecraft Bus: Shuttle.
Spacecraft: Endeavour.
Duration: 9.99 days. Decay Date: 1993-07-01 . USAF Sat Cat: 22684 . COSPAR: 1993-037A. Apogee: 471 km (292 mi). Perigee: 402 km (249 mi). Inclination: 28.50 deg. Period: 93.30 min.
Manned six crew. Carried Spacehab 1; retrieved Eureca-1 spacecraft. Payloads: Spacehab 01, retrieval of European Retriev-able Carrier (EURECA) Satellite, Superfluid Helium On-Orbit Transfer (SHOOT), Consortium for Materials Development in Space Complex Autonomous Payload (CONCAP)-IV, Fluid Acquisition and Resupply Experiment (FARE), Shuttle Amateur Radio Experiment (SAREX) II, Air Force Maui Optical Site (AMOS), GAS bridge assembly with 12 getaway special payloads.
1993 June 25 - .
- EVA STS-57-1 - .
Crew: Low,
Wisoff.
EVA Duration: 0.24 days. Nation: USA.
Related Persons: Low,
Wisoff.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-57.
Spacecraft: Endeavour,
HST.
Latched Eureca antenna. Conducted tests to refine procedures for servicing of the Hubble Space Telescope and construction of the International Space Station.
1993 December 2 - .
09:27 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39B.
Launch Platform: MLP2.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-61 - .
Call Sign: Endeavour. Crew: Akers,
Bowersox,
Covey,
Hoffman,
Musgrave,
Nicollier,
Thornton.
Payload: Endeavour F05 / FSS. Mass: 8,011 kg (17,661 lb). Nation: USA.
Related Persons: Akers,
Bowersox,
Covey,
Hoffman,
Musgrave,
Nicollier,
Thornton.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-61.
Spacecraft Bus: Shuttle.
Spacecraft: Endeavour.
Duration: 10.83 days. Decay Date: 1993-12-13 . USAF Sat Cat: 22917 . COSPAR: 1993-075A. Apogee: 576 km (357 mi). Perigee: 291 km (180 mi). Inclination: 28.50 deg. Period: 93.30 min.
Manned seven crew. Hubble repair mission. Conducted the most EVAs (5) on a Space Shuttle Flight to that date. Payloads: Hubble Space Telescope (HST) Servicing Mission (SM) 1, IMAX Camera, IMAX Cargo Bay Camera (ICBC), Air Force Maui Optical Site (AMOS).
1993 December 5 - .
03:44 GMT - .
1993 December 6 - .
03:29 GMT - .
- EVA STS-61-2 - .
Crew: Akers,
Thornton.
EVA Duration: 0.28 days. Nation: USA.
Related Persons: Akers,
Thornton.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-61.
Spacecraft: Endeavour,
HST.
Hubble Space Telescope Servicing Mission 1 - solar array replacement..
1993 December 7 - .
03:35 GMT - .
1993 December 8 - .
03:13 GMT - .
1993 December 9 - .
03:30 GMT - .
1994 April 9 - .
11:05 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
Launch Platform: MLP2.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
1994 August 18 - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- Shuttle Endeavour Pad Abort - .
Nation: USA.
Program: STS.
Flight: STS-68.
Spacecraft Bus: Shuttle.
Spacecraft: Endeavour.
The countdown for Endeavour's first launch attempt ended 1.9 seconds before liftoff
when on-board computers detected higher than acceptable readings in one channel of a
sensor monitoring the discharge temperature of the high pressure oxidizer turbopump in
main engine #3. A test firing of the engine at the Stennis Space Center in Mississippi on
September 2nd confirmed that a slight drift in a fuel flow meter in the engine caused a
slight increase in the turbopump's temperature. The test firing also confirmed a slightly
slower start for main engine #3 during the pad abort, which could have contributed to
the higher temperatures. After Endeavour was brought back to the Vehicle Assembly
Building to be outfitted with three replacement engines, NASA managers set October
2nd as the date for Endeavour's second launch attempt.
1994 September 30 - .
11:16 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
Launch Platform: MLP1.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-68 - .
Call Sign: Endeavour. Crew: Baker, Mike,
Bursch,
Jones,
Smith, Steven,
Wilcutt,
Wisoff.
Payload: Endeavour F07 / SRL-2. Mass: 12,510 kg (27,570 lb). Nation: USA.
Related Persons: Baker, Mike,
Bursch,
Jones,
Smith, Steven,
Wilcutt,
Wisoff.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-68.
Spacecraft Bus: Shuttle.
Spacecraft: Endeavour.
Duration: 11.24 days. Decay Date: 1994-10-11 . USAF Sat Cat: 23285 . COSPAR: 1994-062A. Apogee: 212 km (131 mi). Perigee: 199 km (123 mi). Inclination: 57.00 deg. Period: 88.60 min.
Carried SIR-C SAR. Landed at Edwards Air Force Base on October 11. Payloads: Space Radar Laboratory (SRL) 2, five Getaway Special payloads, Chromosome and Plant Cell Division in Space (CHROMEX) 5, Biological Research in Canisters (BRIC) 01, Cosmic Radiation Effects and Activation Monitor (CREAM), Military Application of Ship Tracks (MAST), Commercial Protein Crystal Growth (CPCG).
1995 March 2 - .
06:38 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
Launch Platform: MLP1.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-67 - .
Call Sign: Endeavour. Crew: Durrance,
Gregory, William,
Grunsfeld,
Jernigan,
Lawrence,
Oswald,
Parise.
Payload: Endeavour F08 / ASTRO-2 Fwd. Mass: 13,116 kg (28,915 lb). Nation: USA.
Related Persons: Durrance,
Gregory, William,
Grunsfeld,
Jernigan,
Lawrence,
Oswald,
Parise.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-67.
Spacecraft Bus: Shuttle.
Spacecraft: Endeavour.
Duration: 16.63 days. Decay Date: 1995-03-18 . USAF Sat Cat: 23500 . COSPAR: 1995-007A. Apogee: 305 km (189 mi). Perigee: 305 km (189 mi). Inclination: 28.45 deg. Period: 91.50 min.
Carried Astro 2 astronomy payload with 3 UV telescopes.(attached to Endeavour).Payloads: Ultraviolet Astronomy (ASTRO) 2; Middeck Active Control Experiment (MACE); Protein Crystal Growth—Thermal Enclosure System (PCG-TES) 03; Protein Crystal Growth—Single-Locker Thermal Enclosure System (PCG-STES) 02; Commercial Materials Dispersion Apparatus Minilab/Instrumentation Technology Associates, Inc. Experiments (CMIX) 03; Shuttle Amateur Radio Experiment (SAREX) II; two getaway special experiments.
1995 September 7 - .
15:09 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
Launch Platform: MLP1.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-69 - .
Call Sign: Endeavour. Crew: Cockrell,
Gernhardt,
Newman,
Voss,
Walker, Dave.
Payload: Endeavour F09 / Spartan / WSF. Mass: 11,499 kg (25,350 lb). Nation: USA.
Related Persons: Cockrell,
Gernhardt,
Newman,
Voss,
Walker, Dave.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-69.
Spacecraft Bus: Shuttle.
Spacecraft: Endeavour.
Duration: 10.85 days. Decay Date: 1995-09-18 . USAF Sat Cat: 23667 . COSPAR: 1995-048A. Apogee: 321 km (199 mi). Perigee: 321 km (199 mi). Inclination: 28.45 deg. Period: 91.40 min.
Deployed and retrieved Spartan 201, WSF 2. Payloads: Wake Shield Facility (WSF) 2; Shuttle Pointed Autonomous Research Tool for As-tronomy (SPARTAN) 201; International Extreme Ultraviolet Hitchhiker (IEH)1; Inter-Mars Tissue Equivalent Proportional Counter (ITEPC); Extravehicular Activity Development Flight Test (EDFT) 2; Capillary Pumped Loop (CAPL) 2/ getaway special (GAS) bridge assembly with five GAS payloads; Auroral Photography Experiment (APE) B; Biological Research in Canisters (BRIC); Commercial Generic Bioprocessing Apparatus (CGBA), Configuration A; Electrolysis Perfor-mance Improvement Concept Study (EPICS); Space Tissue Loss (STL)/National Institutes of Health (NIH) Cells (C); Commercial Middeck Instrumentation Technology Associates Experiment (CMIX).
1995 September 16 - .
08:20 GMT - .
1996 January 11 - .
09:41 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39B.
Launch Platform: MLP1.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-72 - .
Call Sign: Endeavour. Crew: Barry,
Chiao,
Duffy,
Jett,
Scott, Winston,
Wakata.
Payload: Endeavour F10 / OAST / FSU. Mass: 6,510 kg (14,350 lb). Nation: USA.
Related Persons: Barry,
Chiao,
Duffy,
Jett,
Scott, Winston,
Wakata.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-72.
Spacecraft Bus: Shuttle.
Spacecraft: Endeavour.
Duration: 8.92 days. Decay Date: 1996-01-20 . USAF Sat Cat: 23762 . COSPAR: 1996-001A. Apogee: 310 km (190 mi). Perigee: 302 km (187 mi). Inclination: 28.50 deg. Period: 90.60 min. Deployed and retrieved OAST Flyer; retrieved SFU Space Flyer Unit. Beside the two satellite retrievals, the mission included two spacewalks..
1996 January 15 - .
05:35 GMT - .
- EVA STS-72-1 - .
Crew: Barry,
Chiao.
EVA Duration: 0.26 days. Nation: USA.
Related Persons: Barry,
Chiao.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-72.
Spacecraft Bus: Shuttle.
Spacecraft: Endeavour.
Tested tools and techniques for extravehicular activity..
1996 January 17 - .
05:40 GMT - .
1996 May 19 - .
10:30 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39B.
Launch Platform: MLP1.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-77 - .
Call Sign: Endeavour. Crew: Brown,
Bursch,
Casper,
Garneau,
Runco,
Thomas, Andrew.
Payload: Endeavour F11 / GBA-9. Mass: 12,233 kg (26,969 lb). Nation: USA.
Related Persons: Brown,
Bursch,
Casper,
Garneau,
Runco,
Thomas, Andrew.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-77.
Spacecraft Bus: Shuttle.
Spacecraft: Endeavour.
Duration: 10.03 days. Decay Date: 1996-05-29 . USAF Sat Cat: 23870 . COSPAR: 1996-032A. Apogee: 285 km (177 mi). Perigee: 274 km (170 mi). Inclination: 39.00 deg. Period: 90.10 min.
Deployed and retrieved Spartan 2; deployed PAMS-STU; carried Spacehab module. Payloads: Shuttle Pointed Research Tool for Astronomy (SPARTAN) 207/Inflatable Antenna Experiment (IAE); Technology Experiments Advancing Missions in Space (TEAMS) 01 (includes Vented Tank Resupply Experiment (VTRE), Global Positioning System (GPS) Attitude and Navigation Experiment (GANE) (RME 1316), Liquid Metal Test Experiment (LMTE) and Passive Aerodynami-cally Stabilized Magnetically Damped Satellite (PAMS) Satellite Test Unit (STU); SPACEHAB-4; Brilliant Eyes Ten-Kelvin Sorption Cryocooler Experiment (BETSCE); 12 getaway specials attached to a GAS bridge assembly (GAS 056, 063, 142, 144, 163, 200, 490, 564, 565, 703, 741 and the Reduced-Fill Tank Pressure Control Experiment (RFTPCE); Aquatic Research Facility (ARF) 01; Biological Research in Canisters (BRIC) 07, Block III.
1996 August 6 - .
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- Endeavour OMDP-1 - .
Nation: USA.
Program: STS.
Spacecraft Bus: Shuttle.
Spacecraft: Endeavour.
Shuttle Endeavour undergoes its OMDP-1 Orbiter Maintenance Down Period at Palmdale, returning to service on 4 April 1997. These overhauls are undertaken every 10 to 12 shuttle missions..
1998 January 23 - .
02:48 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
Launch Platform: MLP3.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-89 - .
Call Sign: Endeavour. Crew: Anderson,
Dunbar,
Edwards, Joe,
Reilly,
Sharipov,
Thomas, Andrew,
Wilcutt.
Payload: Endeavour F12 / Spacehab Double Module. Mass: 116,277 kg (256,346 lb). Nation: USA.
Related Persons: Anderson,
Dunbar,
Edwards, Joe,
Reilly,
Sharipov,
Thomas, Andrew,
Wilcutt.
Agency: NASA Houston.
Manufacturer: Douglas.
Program: Mir.
Class: Manned.
Type: Manned spaceplane. Flight: Soyuz TM-26,
STS-86 Mir NASA-5,
STS-89,
STS-89 Mir NASA-6.
Spacecraft Bus: Shuttle.
Spacecraft: Endeavour.
Duration: 8.82 days. Decay Date: 1998-01-31 . USAF Sat Cat: 25143 . COSPAR: 1998-003A. Apogee: 382 km (237 mi). Perigee: 359 km (223 mi). Inclination: 51.60 deg. Period: 92.00 min.
Penultimate Shuttle mission to Mir. Andy Thomas replaced David Wolf as the resident NASA astronaut. Endeavour docked with the SO module on Mir at 20:14 GMT on January 24, 1998.
Payloads included:
- Orbiter middeck: CEBAS (German/US biological module with fish and snails); dinosaur skull (part of a museum educational program)
- Bay 1: Tunnel Adapter
- Bay 3: Orbiter Docking System/External Airlock
- Bay 4-7: Transfer Tunnel
- Bay 8-12: Spacehab Double Module (payloads included supplies for Mir, X-ray crystallography detector planned for the International Space Station)
- Bay 13P: Getaway Special GABA carrier with G-141, G-145 (German materials processing experiments)
- Bay 13S: Getaway Special GABA carrier with G-093 (University of Michigan fluid dynamics experiment), G-432 (Chinese materials processing experiment)
Despite fits problems with his Sokol emergency spacesuit, Andy Thomas replaced David Wolf as a Mir crew member on January 25. Endeavour undocked from Mir on January 29 at 16:57 GMT and made one flyaround of the station before departing and landing at Kennedy Space Center's runway 15 at 22:35 GMT on January 31.
1998 December 4 - .
08:35 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
Launch Platform: MLP3.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-88 - .
Call Sign: Endeavour. Crew: Cabana,
Currie,
Krikalyov,
Newman,
Ross,
Sturckow.
Payload: Endeavour F13. Mass: 116,277 kg (256,346 lb). Nation: USA.
Related Persons: Cabana,
Currie,
Krikalyov,
Newman,
Ross,
Sturckow.
Agency: NASA Houston.
Manufacturer: North American.
Program: ISS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-88.
Spacecraft Bus: Shuttle.
Spacecraft: Endeavour.
Duration: 11.80 days. Decay Date: 1998-12-16 . USAF Sat Cat: 25549 . COSPAR: 1998-069A. Apogee: 399 km (247 mi). Perigee: 382 km (237 mi). Inclination: 51.60 deg. Period: 92.40 min.
First attempted launch of STS-88 was scrubbed at 09:03 GMT on December 3 due to a problem with a hydraulic system sensor. Launch came the next day, with Endeavour entering an initial 75 km x 313 km x 51.6 degree orbit. Half an orbit after launch, at 09:19 GMT, Endeavour fired its OMS engines to raise the orbit to 180 km x 322 km x 51.6 degree.
On December 5 at 22:25 GMT Nancy Currie unberthed the Unity space station node from the payload bay using the RMS arm. She then moved the Unity to a position docked to the Orbiter Docking System in the payload bay in readiness for assembly with the Russian-launched Zarya FGB ISS component. After rendezvous with the Zarya FGB module, on December 6 at 23:47 GMT Endeavour grappled Zarya with the robot arm, and at 02:07 GMT on December 7 it was soft docked to the PMA-1 port on Unity. After some problems hard dock was achieved at 02:48 GMT. Unity and Zarya then formed the core of the future International Space Station. Ross and Newman made three space walks to connect cables between Zarya and Unity, on December 7, 9 and 12. On the last EVA a canvas tool bag was attached to the exterior of Unity to provide tools for future station assembly workers. Docking cables were disconnected to prevent Unity and Zarya from inadvertently undocking. Following an internal examination of the embryonic space station, Endeavour undocked at 20:30 GMT on December 13. The SAC-A and Mightysat satellites were ejected from the payload bay on December 14 and 15. Deorbit burn was December 16 at 03:48 GMT, and Endeavour landed at 04:53:29 GMT, on Runway 15 at the Kennedy Space Center.
Payloads included:
- Sill: RMS arm No. 303
- Bay 1-2: Tunnel Adapter 002
- Bay 3-4: Orbiter Docking System/External Airlock (Boeing/Palmdale)
- Bay 7-13: Unity (Node 1) (Boeing/Huntsville), including the PMA-1 and PMA-2 docking adapters (Boeing/Huntington Beach)
- Bay 2 Port: GABA adapter with SAC-A satellite
- Bay 4 Starboard: Carrier with Tool Stowage Assembly
- Bay 5 Port: GABA adapter with two PFR space walk platforms and one
PFR stanchion.
- Bay 5 Starboard: GABA adapter with two more PFR space walk platforms and one
PFR stanchion.
- Bay 6 Port: GABA adapter with Mightysat
- Bay 6 Starboard: APC carrier with TCS laser rendezvous sensor
- Bay 7 Starboard: APC carrier with TCS laser rendezvous sensor
- Bay 13 Port: GABA adapter with SEM-7 and G-093 canisters
- Bay 13 Starboard: GABA adapter with IMAX Cargo Bay Camera
2000 February 11 - .
17:43 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
Launch Platform: MLP3.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-99 - .
Call Sign: Endeavour. Crew: Gorie,
Kavandi,
Kregel,
Mohri,
Thiele,
Voss, Janice.
Payload: Endeavour F14. Mass: 116,277 kg (256,346 lb). Nation: USA.
Related Persons: Gorie,
Kavandi,
Kregel,
Mohri,
Thiele,
Voss, Janice.
Agency: NASA Houston.
Manufacturer: Boeing.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-99.
Spacecraft Bus: Shuttle.
Spacecraft: Endeavour.
Duration: 11.23 days. Decay Date: 2000-02-22 . USAF Sat Cat: 26088 . COSPAR: 2000-010A. Apogee: 234 km (145 mi). Perigee: 226 km (140 mi). Inclination: 57.00 deg. Period: 89.10 min.
On an extremely successful mission the space shuttle Endeavour deployed the 61 metre long STRM mast. This was a side-looking radar that digitally mapped with unprecedented accuracy the entire land surface of the Earth between latitudes 60 deg N and 54 deg S. Sponsors of the flight included the US National Imagery and Mapping Agency (NIMA), NASA, and the German and Italian space agencies. Some of the NIMA data would remain classified for exclusive use by the US Department of Defense.
2000 December 1 - .
03:06 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39B.
Launch Platform: MLP1.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-97 - .
Call Sign: Endeavour. Crew: Bloomfield,
Garneau,
Jett,
Noriega,
Tanner.
Payload: Endeavour F15. Mass: 120,742 kg (266,190 lb). Nation: USA.
Related Persons: Bloomfield,
Garneau,
Jett,
Noriega,
Tanner.
Agency: NASA Houston.
Manufacturer: North American.
Program: ISS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-97.
Spacecraft Bus: Shuttle.
Spacecraft: Endeavour.
Duration: 10.83 days. Decay Date: 2000-12-11 . USAF Sat Cat: 26630 . COSPAR: 2000-078A. Apogee: 365 km (226 mi). Perigee: 352 km (218 mi). Inclination: 51.60 deg. Period: 91.70 min.
Endeavour was launched on an assembly mission to the to the International Space Station (ISS). The main mission was to install a 72 m x 11.4 m, 65 kW double-wing solar panel on the Unity module of the ISS. The external tank and the Orbiter entered a 74 x 325 km orbit at 0314 GMT. Endeavour's OMS burn raised its perigee to 205 km at around 0347 GMT; the ET re-entered over the Pacific.
Endeavour docked with the Station's PMA-3 docking port at 1959 GMT on December 2.
Astronauts then installed the P6 solar panel truss to the station during a series of spacewalks. The P6 was made up of the LS (Long Spacer), PV-1 IEA (Integrated Equipment Assembly) and the PVAA (Photovoltaic Array). The LS carried two Thermal Control Systems with radiators to eject waste heat from the Station; these radiators were to be moved to truss segments S4 and S6 later in assembly. The PVAA had solar array wings SAW-2B and SAW-4B, which deployed to a span of 73 meters. Only after completion of three station assembly space walks on December 3, 5, and 7 did the Endeavour crew enter the station (at 1436 GMT on December 8), delivering supplies to Alpha's Expedition One crew. Hatches were closed again at 1551 GMT December 9, and Endeavour undocked at 1913 GMT the same day. After one flyaround of the station, Endeavour fired its engines to depart the vicinity at 2017 GMT December 9. The deorbit burn was at 2158 GMT on December 11, changing the orbit from 351 x 365 km to 27 x 365 km, with landing at Runway 15 of Kennedy Space Center at 2303 GMT.
The payload bay of Endeavour for STS-97 contained a total cargo of 18740 kg:
- Bay 1-2:
- Orbiter Docking System 1800 kg
- 3 EMU spacesuits (S/N unknown) 360 kg
- FPPU experiment (in airlock) 23 kg. The FPPU (Floating Potential Probe Experiment) was installed on P6 to measure charge build-up as the arrays pass through the ionosphere plasma. P6 had devices to bleed off excess charge, and FPPU would monitor their effectiveness.
- APCU Assembly Power Converter Unit 35 kg
- APCU Assembly Power Converter Unit 35 kg
- Bay 3-6:
- ITS P6 Long Spacer 4000 kg
- TCS radiator (aft) 500 kg
- TCS radiator (starboard) 500 kg
- Bay 8-11:
- ITS P6 Integrated Equipment Assembly 7200 kg
- PV radiator P6 500 kg
- Bay 12-13:
- ITS P6 Photovoltaic Array/Beta Gimbal Assembly. 1000 kg
- Solar array wing 2B 1070 kg
- Solar array wing 4B 1070 kg
- Bay 13S: IMAX Cargo Bay Camera 238 kg
- Sill: Canadarm RMS 303 410 kg
2001 April 19 - .
18:40 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
Launch Platform: MLP1.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-100 - .
Call Sign: Endeavour. Crew: Ashby,
Guidoni,
Hadfield,
Lonchakov,
Parazynski,
Phillips,
Rominger.
Payload: Endeavour F16 / Raffaello, Canadarm-2. Mass: 103,506 kg (228,191 lb). Nation: USA.
Related Persons: Ashby,
Guidoni,
Hadfield,
Lonchakov,
Parazynski,
Phillips,
Rominger.
Agency: NASA Houston.
Manufacturer: Boeing.
Program: ISS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-100.
Spacecraft Bus: Shuttle.
Spacecraft: Endeavour.
Duration: 11.90 days. Decay Date: 2001-05-01 . USAF Sat Cat: 26747 . COSPAR: 2001-016A. Apogee: 404 km (251 mi). Perigee: 378 km (234 mi). Inclination: 51.60 deg. Period: 92.40 min.
Space Shuttle OV-105 Endeavour was launched on mission STS-100 to carry out International Space Station Flight 6A continued the outfitting of the Station. The crew of four Americans, one Russian, one Canadian and one Italian were to install an 18 meter, 1,700 kg Canadian robotic arm named Canadarm-2 on the ISS, and to transport an Italian cargo container, Raffaello, which delivered 4,500 kg of supplies and equipment to the station. Total payload of 13,744 kg consisted of:
- Bay 1-2: Orbiter Docking System, External Airlock, 3 EMU spacesuits - 2160 kg including 360 kg for the 3 suits
- Bay 3 Starboard: Adapter Beam with DCSU switching unit - 180kg
- Bay 5: Spacelab Pallet with Canadarm-2 SSRMS (Space Station Remote Manipulator System, 1800 kg mass), LDA, and 56 kg UHF antenna - 3256 kg
- Bay 6 Port: Adapter Beam with IMAX Camera - 238 kg
- Bay 8-12: Rafaello Module (MPLM-2) with MPLM racks and 3400 kg cargo - 7500 kg
- Sill: Canadarm RMS 303 - 410 kg
Endeavour reached an 80 x 317 km orbit at 1849 GMT; at 1924 GMT the OMS engines fired to raise perigee. After a series of rendezvous burns, the spaceship docked with the PMA-2 port on the ISS at 1359 GMT on April 21.On 23 April the SSRMS station manipulator was unberthed from the SLP Spacelab pallet at 1114 GMT and latched on to the PDGF fixture on the Destiny ISS module at 1416 GMT. This was followed at 1458 GMT with the MPLM-2 Raffaello module being moved from Endeavour's payload bay by the Shuttle's RMS and berthed to the nadir port on the ISS Unity module at 1600 GMT. Over the next few days, the cargo racks on the MPLM were transferred to Destiny. Raffaello was then unberthed from Unity at 2003 GMT on April 27 and reberthed in the rear of Endeavour's bay for return to earth at 2059 GMT.
Undocking of Endeavour was delayed by a series of computer problems at the Station. Failures in the Station's command and control computers left only one of the three computers operating.
They were all restarted by April 29, and the Shuttle RMS grappled the Spacelab pallet at 2044 GMT . The station's Canadarm-2 released it at 2106 GMT, and the RMS berthed the pallet back in the Shuttle cargo bay. Endeavour undocked from the Station at 1734 GMT on April 29. The weather in Florida was bad at the planned May 1 landing time, so Endeavour landed in California. The deorbit burn was at 1502 GMT on May 1, with landing at 1610:42 GMT on runway 22 at Edwards. Endeavour returned to the Kennedy Space Center atop a Boeing 747 SCA aircraft on May 9.
2001 December 5 - .
22:19 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39B.
Launch Platform: MLP1.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-108 - .
Call Sign: Endeavour. Crew: Bursch,
Godwin,
Gorie,
Kelly, Mark,
Onufrienko,
Tani,
Walz.
Payload: Endeavour F17 / Raffaello. Mass: 105,000 kg (231,000 lb). Nation: USA.
Related Persons: Bursch,
Godwin,
Gorie,
Kelly, Mark,
Onufrienko,
Tani,
Walz.
Agency: NASA.
Manufacturer: Boeing.
Program: ISS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-108,
STS-108 ISS EO-4.
Spacecraft Bus: Shuttle.
Spacecraft: Endeavour.
Duration: 11.82 days. Decay Date: 2001-12-17 . USAF Sat Cat: 26995 . COSPAR: 2001-054A. Apogee: 377 km (234 mi). Perigee: 353 km (219 mi). Inclination: 51.60 deg. Period: 91.80 min.
ISS Logistics flight, launch delayed from November 30 and December 4. Gorie, Kelley, Godwin, Tani, Onufrikeno, Bursch, Walz STS-108 flew the UF-1 Utilization Flight mission to the International Space Station. The UF designation distinguished this from earlier Station flights which were considered assembly flights. The shuttle would deliver the Expedition-4 crew of Onufrikeno, Bursch, and Walz to the station and return the Expedition-3 crew to earth. In addition to the crew swap, UF-1 brought supplies to the Station aboard the Raffaello module, and Godwin and Tani conducted a spacewalk to add thermal blankets to the gimbals on the Station's solar arrays. Endeavour reached an orbit of approximately 58 x 230 km (according to the NASA PAO) at 2228 GMT. At 2259 GMT it fired its OMS engines to raise perigee to 225 km. Mass after OMS-2 was 114,692 kg. Endeavour soft docked with the International Space Station at 2003 GMT on December 7. Problems with aligning the vehicles delayed hard dock until 20:51 GMT, and the hatch was opened at 22:43 GMT. The Raffaello module was unberthed from Endeavour at 1701 GMT on December 8 and berthed to the Unity module of the station at 1755 UTC.
STS-108 cargo bay payload was dominated by the Raffaello (MPLM-2) logistics module with 4 RSP and 8 RSR resupply racks. Also in the cargo bay were the MACH-1 and LMC experiment trusses flown under the Goddard small payloads program. MACH-1 was an MPESS-type Hitchhiker bridge carrying the CAPL-3 capillary thermal control experiment on top. On its forward side was the Starshine-2 launch canister, the CAPL-3 avionics plate, the Hitchhiker avionics plate, and the SEM-15 canister. On the aft side was the G-761 canister containing experiments from Argentina, the PSRD synchrotron detector (a prototype for the AMS antimatter experiment which will fly on Station later), and the COLLIDE-2 and SEM-11 canisters. The SEM (Space Experiment Modules) are collections of high school experiments. LMC, the Lightweight MPESS Carrier carried four canisters with materials science and technology experiments: SEM-12, G-785, G-064 and G-730. In addition, an adapter beam on the starboard sidewall carried G-221 and G-775, with materials science and biology experiments.
Raffaello was transferred back to the Shuttle payload bay on December 14. Endeavour undocked from the Station at 17:28 UTC on December 15 and made a half loop around the station before making a small separation burn at 1822 UTC. The Starshine-2 reflector satellite was ejected from the MACH-1 bridge in Endeavour's payload bay at 1502 UTC on December 16. Endeavour landed on runway 15 at Kennedy Space Center at 1755 UTC on December 17. The Expedition 3 crew of Culbertson, Dezhurov and Tyurin returned to Earth aboard Endeavour, leaving the Expedition 4 crew of Onufrienko, Bursch and Walz in charge of the Station.
2002 June 5 - .
21:22 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
Launch Platform: MLP1.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-111 - .
Call Sign: Endeavour. Crew: Chang-Diaz,
Cockrell,
Korzun,
Lockhart,
Perrin,
Treshchev,
Whitson.
Payload: Endeavour F18 / Leonardo. Mass: 105,000 kg (231,000 lb). Nation: USA.
Related Persons: Chang-Diaz,
Cockrell,
Korzun,
Lockhart,
Perrin,
Treshchev,
Whitson.
Agency: NASA.
Manufacturer: Boeing.
Program: ISS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-111,
STS-111 ISS EO-5.
Spacecraft Bus: Shuttle.
Spacecraft: Endeavour .
Duration: 13.86 days. Decay Date: 2002-06-19 . USAF Sat Cat: 27440 . COSPAR: 2002-028A. Apogee: 387 km (240 mi). Perigee: 349 km (216 mi). Inclination: 51.60 deg. Period: 91.90 min.
Launch delayed from May 2, 6, 30, 31 and June 4. STS-111 reached a 58 x 224 km x 51.6 deg orbit at 2131 UTC and separated from the External Tank. It coasted to apogee at 2201 UTC and carried out the OMS-2 burn to raise the orbit to 158 x 235 km. The mission of STS-111 (UF-2 ISS utilization flight) was to swap the Expedition 4 and 5 crews and deliver the MBS Mobile Base System and some interior experiment racks. Endeavour docked with the Station at 1625 UTC on June 7. The Leonardo MPLM module was attached to the Station on June 8. Cargo manifest:
- Bay 1-2: Orbiter Docking System - 1800 kg + 2 EMU spacesuits - 240 kg
- Bay 4: Mobile Base System (MBS) - 1600 kg. The Mobile Base System was made by MD Robotics of Brampton, Ontario. It was to be attached to the Mobile Transporter and used to mount the SSRMS Canadarm-2 arm and heavy payloads.
- Bay 6P: Adapter Beam / Wrist Roll Joint - 150 kg. The WRJ (Wrist Roll Joint) would be swapped with the broken one on the SSRMS arm.
- Bay 7-12: MPLM FM1 "Leonardo" - 10557 kg. The Leonardo module carried 8 Resupply Stowage Racks and 4 Resupply Stowage Plaftorms, with equipment to be transferred to the station. It also carried two science racks: the MSG (Microgravity Science Glovebox) and Express-3, which would be installed on Destiny. Leonardo, built by Alenia Spazio in Torino, also flew on STS-102 and STS-105.
- Bay 13P: ICAPC Beam / PGDF - 75 kg. The PGDF (Power-Data Grapple Fixture) would be installed on the P6 truss.
- Bay 13S: Adapter Beam / SMDP - 200 kg. The Service Module Debris Panels (SMDP) package contained 6 panels which would be stowed on PMA-1 until a later spacewalk attached them to the Zvezda module to protect it from space debris hits.
- Total: 14622 kg
2002 November 24 - .
00:49 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-113 - .
Call Sign: Endeavour. Crew: Bowersox,
Budarin,
Herrington,
Lockhart,
Lopez-Alegria,
Pettit,
Wetherbee.
Payload: Endeavour F19 / P1. Mass: 115,000 kg (253,000 lb). Nation: USA.
Related Persons: Bowersox,
Budarin,
Herrington,
Lockhart,
Lopez-Alegria,
Pettit,
Wetherbee.
Agency: NASA.
Manufacturer: Boeing.
Program: ISS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-113,
STS-113 ISS EO-6.
Spacecraft Bus: Shuttle.
Spacecraft: Endeavour.
Duration: 13.78 days. Decay Date: 2002-12-07 . USAF Sat Cat: 27556 . COSPAR: 2002-052A. Apogee: 397 km (246 mi). Perigee: 379 km (235 mi). Inclination: 51.60 deg. Period: 92.30 min.
ISS assembly mission ISS-11A delayed from August 22, September 6, 19, October 6, November 2, 10, 11, 19 and 23 due to SSME problems and then damage to the Shuttle's manipulator arm. Shuttle mission STS-113 carried a crew of seven astronauts (six American and one Russian) and a 13.7-m truss of 12.5 tons to the International Space Station (ISS). During several hours of EVA, the crew installed and secured the truss assembly. The truss was to provide structural support for the station's thermal control radiators, and brought the total mass of the ISS to over 200 tons. Prior to leaving the ISS, the shuttle released a pair of tethered (15-m long) picosatellites. It was to leave the ISS on December 2.
2004 February 19 - .
Late 2004 - .
- STS-124 (cancelled) - .
Nation: USA.
Agency: NASA.
Program: ISS.
Flight: STS-124 ISS EO-17.
Spacecraft Bus: Shuttle.
Spacecraft: Endeavour.
Flight delayed after the Columbia disaster. No crew had been named at the time of the loss of Columbia. STS-124 was to have flown ISS assembly mission ISS-1J/A. It would have delivered the Japanese JEM ELM PS module and SPP to the station..
April 2005 - .
Early 2006 - .
Summer 2006 - .
- STS-133 (cancelled) - .
Nation: USA.
Agency: NASA.
Program: ISS.
Flight: STS-133A.
Spacecraft Bus: Shuttle.
Spacecraft: Endeavour.
Flight delayed after the Columbia disaster. No crew had been named at the time of the loss of Columbia. STS-133 was to have flown ISS assembly mission ISS-20A. Node 3 would have been delivered to the station..
Early 2007 - .
- STS-135 (cancelled) - .
Nation: USA.
Agency: NASA.
Program: ISS.
Flight: STS-135A.
Spacecraft Bus: Shuttle.
Spacecraft: Endeavour.
Flight delayed after the Columbia disaster. No crew had been named at the time of the loss of Columbia. STS-135 was to have flown ISS assembly mission ISS-17A. An MPLM would have delivered Destiny lab racks and a CBA to the station..
2007 August 8 - .
22:36 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-118 - .
Call Sign: Endeavour. Crew: Caldwell,
Drew,
Hobaugh,
Kelly, Scott,
Mastracchio,
Morgan,
Williams, Dave.
Payload: Endeavour F20 / S5, Spacehab. Mass: 121,823 kg (268,573 lb). Nation: USA.
Related Persons: Caldwell,
Drew,
Hobaugh,
Kelly, Scott,
Mastracchio,
Morgan,
Williams, Dave.
Agency: NASA.
Program: ISS.
Class: Manned.
Type: Manned spaceplane. Flight: Soyuz TMA-10,
STS-117 ISS EO-15,
STS-118.
Spacecraft Bus: Shuttle.
Spacecraft: Endeavour.
Duration: 12.75 days. Decay Date: 2007-08-21 . USAF Sat Cat: 32008 . COSPAR: 2007-035A. Apogee: 348 km (216 mi). Perigee: 337 km (209 mi). Inclination: 51.60 deg. Period: 91.40 min.
Space Shuttle Endeavour was launched on Aug 8 at 2236 UTC. The STS-118 stack comprised Orbiter OV-105, solid rockets RSRM-97 and external tank ET-117. The solid boosters separated 2 min after launch. At 2245 UTC the orbiter main engines cut off and ET-117 separated into an approximately 57 x 225 km x 51.6 deg orbit. The OMS-2 burn at 2313 UTC put Endeavour in a higher 229 x 317 km orbit as the ET fell back to reentry around 2346 UTC.
During ascent a large chunk of external tank foam was observed to hit the underside of the orbiter. Examination in orbit using the robotic arm showed a hole in a heat shield tile that went down to the felt mounting pad. There was considerable press discussion of the danger, but as the mission drew to a close NASA decided that no lasting damage would be incurred during reentry to the orbiter structure, and called off a potential extra spacewalk to repair the tile.
Endeavour docked at the PMA-2 adapter on the Station at 18:02 GMT on 10 August; the hatches were opened at 20:04.
The 14036 kg of cargo broke down as follows:
- Bay 1-2: Orbiter Docking System, 1800 kg
- Bay 1-2: EMU 3010, 130 kg
- Bay 1-2: EMU 3017, 130 kg
- Bay 3: Tunnel Adapter, 112 kg
- Bay 5-7: Spacehab-SM Single Module, 5480 kg: Loaded with research experimental equipment and consumables to be left at the station.
- Bay 8P: SPDU: Station Power Distribution Unit, will be left at the ISS and allow the Orbiter to draw electricity from the station while docked, allowing longer missions
- Bay 8-10: S5 Truss, 1584 kg: a short spacer truss installed at the end of the ISS S4 truss during the mission, to eliminate interference with the S6 solar panels when they would be added later
- Bay 11-12: ESP-3, 3400 kg: External Stowage Platform 3, left at the ISS, provided external storage for spare parts, and was delivered with a spare nitrogen tank for the truss cooling system, a spare truss battery charge/discharge unit (BCDU), a spare Canadarm-2 robot arm pitch roll joint, and a replacement Control Moment Gyro for the Z1 truss
- Bay 11-12: CMG-3R ORU, 540 kg
- Sill: OBSS, 450 kg
- Sill: RMS 201, 410 kg
The shuttle's RMS 201 robotic arm moved the S5 truss from the payload bay at 20:50 on 10 August. It was handed over to the station's Canadarm-2 robotic arm, which then attached it to the S4 truss at 17:30 on 11 August, with astronauts assisting on the first of four spacewalks of the mission. On 14 August, ESP-3 was unberthed from Endeavour's payload bay and attached to the P3 truss on the Station, where its spare parts can be reached if needed.
Following successful completion of all cargo delivery and station assembly tasks, the crew returned to Endeavour on 18 August, undocking the next day at 11:56 GMT. Landing was moved up a day ahead of schedule because of concern a hurricane might force evacuation of the Houston Control Center on the originally-planned return date. Endeavour began its deorbit burn at 15:25 GMT on August 21 and lowered its orbit from 336 x 347 km to -28 x 342 km. It landed on runway 15 at Kennedy Space Center at 16:32 GMT. Landing mass was 100,878 kg.
2008 March 11 - .
06:28 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-123 - .
Call Sign: Endeavour. Crew: Behnken,
Doi,
Foreman,
Gorie,
Johnson, Gregory H,
Linnehan,
Reisman.
Payload: Endeavour F21 / Dextre, Kibo ELM-PS. Mass: 118,950 kg (262,230 lb). Nation: USA.
Related Persons: Behnken,
Doi,
Foreman,
Gorie,
Johnson, Gregory H,
Linnehan,
Reisman.
Agency: NASA.
Program: ISS.
Class: Manned.
Type: Manned spaceplane. Flight: Soyuz TMA-11,
STS-122 ISS EO-16,
STS-123,
STS-123 ISS EO-16.
Spacecraft Bus: Shuttle.
Spacecraft: Endeavour.
Duration: 15.76 days. Decay Date: 2008-03-27 00:40:41 . USAF Sat Cat: 32699 . COSPAR: 2008-009A. Apogee: 346 km (214 mi). Perigee: 341 km (211 mi). Inclination: 51.60 deg. Period: 91.40 min.
Endeavour's main task was delivery of the Canadian Dextre robotic manipulator (fitted to the end of the Canadarm-2 robotic arm already installed on the station) and the Japanese Kibo ELM-PS Experiment Logistics Module - Pressurized. It also brought astronaut Reisman to the station, replacing Eyharts on the long-duration crew. The orbiter was placed in an initial 58 km x 220 km orbit at main engine shutdown, adjusted by the OMS-2 firing 38 minutes later to a 220 km x 233 km chase orbit. On 13 March the shuttle docked with the PMA-2 port of the International Space Station at 03:49 GMT. Mission accomplished, Endeavour undocked at 00:25 GMT on March 25, completed the customary ISS flyaround at 01:36 GMT, deorbited at 23:33 GMT the next day, and landed at 00:39 GMT at Kennedy Space Center.
2008 November 15 - .
00:55 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-126 - .
Call Sign: Endeavour. Crew: Boe,
Bowen,
Ferguson,
Kimbrough,
Magnus,
Pettit,
Stefanyshyn-Piper.
Return Crew: Boe,
Bowen,
Ferguson,
Kimbrough,
Magnus,
Pettit,
Stefanyshyn-Piper.
Payload: Endeavour F22 / MPLM-1 / ULF-2. Mass: 116,500 kg (256,800 lb). Nation: USA.
Related Persons: Boe,
Bowen,
Ferguson,
Kimbrough,
Magnus,
Pettit,
Stefanyshyn-Piper.
Agency: NASA.
Program: ISS.
Class: Manned.
Type: Manned spaceplane. Flight: Soyuz TMA-13,
STS-124 ISS EO-17,
STS-126,
STS-126 ISS EO-18.
Spacecraft Bus: Shuttle.
Spacecraft: Endeavour.
Duration: 15.85 days. Decay Date: 2008-11-30 . USAF Sat Cat: 33441 . COSPAR: 2008-059A. Apogee: 352 km (218 mi). Perigee: 344 km (213 mi). Inclination: 51.60 deg. Period: 91.50 min.
ISS resupply and internal outfitting flight, docked at the Harmony module of the sation at 22:01 GMT on 16 November. The Leonardo module contained 6956 kg of cargo, mainly devoted to allowing a future full ISS crew of six: two crew quarters racks, a Galley rack, a Waste and Hygiene Compartment rack, two Water Recovery System racks, an experiment rack, a Combustion integration rack, and miscellaneous supplies in three Resupply Stowage Racks and six Resupply Stowage Platforms. On 17 November at 17:09 GMT the ISS robot arm moved the Leonardo module from the shuttle's payload bay to the Harmony module nadir port for unloading. The mission also rotated the ISS long-term NASA crew member, replacing Chamitoff with Magnus. Four spacewalks were conducted, primarily to repair a broken ISS Solar Array Rotary Joint.
The unloaded Leonardo module was returned to the shuttle bay on 26 November. The shuttle undocked from the ISS at 14:47 GMT on 28 November. The next day, at 20:33 GMT, it released a 7 kg PicoSat Solar Cell Testbed Experiment, a prototype for a later picosat mission to geostationary transfer orbit to study degradation of solar cells while passing through the earth's radiation belts.
Following two wave-offs for a Kennedy Space Center landing due to weather, Endeavour made its 89 m/s deorbit maneuver at 20:19 on 29 November, and landed at Runway 04L/22R at Edwards AFB at 21:25 GMT.
Cargo Manifest, Total = 17,370 kg:
- Bay 1-2: Orbiter Docking System = 1800 kg + EMUs 3005 and 3011 = 260 kg
- Bay 3 Port: APC/SPDU = 100 kg
- Bay 3 Starboard: APC/SSPL Picosat launcher = 50 kg + PSSC Picosats = 7 kg
- Bay 7 Starboard: ROEU 751 umbilical = 50 kg
- Bay 7-12: Leonardo (MPLM-1) = 12748 kg
- Bay 13: Lightweight MPESS Carrier (LMC)= 1495 kg
- Sill: RMS 201 = 410 kg + OBSS = 450 kg
2009 July 15 - .
22:03 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-127 - .
Call Sign: Endeavour. Crew: Cassidy,
Hurley,
Kopra,
Marshburn,
Payette,
Polansky,
Wolf.
Payload: Endeavour F23 / ISS 2J/4. Mass: 120,000 kg (260,000 lb). Nation: USA.
Agency: NASA.
Program: ISS.
Class: Manned.
Type: Manned spaceplane. Flight: Soyuz TMA-14,
Soyuz TMA-15,
STS-127.
Spacecraft Bus: Shuttle.
Spacecraft: Endeavour.
Duration: 15.60 days. Decay Date: 2009-07-31 . USAF Sat Cat: 35633 . COSPAR: 2009-038A. Apogee: 336 km (208 mi). Perigee: 328 km (203 mi). Inclination: 51.60 deg. Period: 91.20 min.
Crew: Polansky, Hurley, Cassidy, Marshburn, Wolf, Payette. Deliver to the ISS and install the Kibo Japanese Experiment Module Exposed Facility (JEM EF); Kibo Japanese Experiment Logistics Module - Exposed Section (ELM-ES); and Spacelab Pallet - Deployable 2 (SLP-D2).
2010 February 8 - .
09:14 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-130 - .
Call Sign: Endeavour. Crew: Behnken,
Hire,
Patrick,
Robinson,
Virts,
Zamka.
Payload: Endeavour F24 / Tranquility / Cupola. Mass: 121,320 kg (267,460 lb). Nation: USA.
Related Persons: Behnken,
Hire,
Patrick,
Robinson,
Virts,
Zamka.
Agency: NASA.
Program: ISS.
Class: Manned.
Type: Manned spaceplane. Flight: Soyuz TMA-16,
Soyuz TMA-17,
STS-130.
Spacecraft Bus: Shuttle.
Spacecraft: Endeavour.
Duration: 13.75 days. Decay Date: 2010-02-22 03:20:00 . USAF Sat Cat: 36394 . COSPAR: 2010-004A. Apogee: 348 km (216 mi). Perigee: 334 km (207 mi). Inclination: 51.60 deg. Period: 91.40 min. Docked with the ISS at 05:06 GMT on 10 February. Primary payloads were the Tranquility module and the Cupola, a robotic control station with six windows around its sides and another in the center, providing a 360-degree view around the station..
2011 May 16 - .
12:56 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
Back to top of page
Home - Search - Browse - Alphabetic Index: 0- 1- 2- 3- 4- 5- 6- 7- 8- 9
A- B- C- D- E- F- G- H- I- J- K- L- M- N- O- P- Q- R- S- T- U- V- W- X- Y- Z
© 1997-2019 Mark Wade - Contact
© / Conditions for Use