Soyuz TMA-21
Part of ISS
ISS Expedition EO-27. Six-month, long-term, resident crew of the International Space Station.
AKA: ISS EO-27;Tarkhany. Launched: 2011-04-04. Returned: 2011-09-16. Number crew: 3 . Duration: 164.24 days.
Mission consisted of:
- Launch of two ISS EO-27 Russian crewmembers and one NASA crewmember aboard the Soyuz TMA-21 spacecraft
- Docking of the Soyuz TMA-21 spacecraft to the Poisk Mini Research Module (MRM2)
- Operational support for loading and undocking of Progress M-09M from the Pirs (DC-1) Module
- Operational support for docking of Progress M-10M to the Pirs (DC-1) Module
- Operational support if required for docking of the LON (Shuttle rescue vehicle to save the crew of Shuttle ULF-6 if required)
- Partial unloading of Progress M-10M vehicle
- Operational support for loading and undocking of the ATV-2 vehicle from the SM IC module
- Operational support for loading and undocking of the Soyuz TMA-20 spacecraft from the Rassvet Mini
- Research Module MRM1 for return to the Earth of the three ISS EO-26 crewmembers
- Support of the Space Station maintenance and operations
- Performance of the science and application research program and experiments
- Performance of one EVA from Russian Segment
- Support of rendezvous of the Soyuz TMA-02M spacecraft with the ISS EO-28 crew of one Russian, one NASA, and one JAXA crewmember
- Support of docking of Soyuz TMA-02M spacecraft to Mini Research Module Rassvet (MRM1)
- Operational support for docking to SM IC and unloading of Progress M-11M cargo vehicle
- Final unloading of Progress M-10M cargo vehicle
- Operational support for loading and undocking of Progress M-11M cargo vehicle
- Operational support for docking to SM IC and partial unloading of Progress M-12M cargo vehicle was planned, but called off when Progress M-12M failed to reach orbit
- Operational support for loading and undocking Soyuz TMA-21 spacecraft from Mini Research Module Pirs (MRM2), followed by return to the Earth of the three ISS EO-27 crewmembers
More at: Soyuz TMA-21.
Family:
Manned spaceflight.
People:
Borisenko,
Garan,
Samokutyayev.
Country:
Russia.
Spacecraft:
Soyuz TMA.
2011 April 4 - .
22:18 GMT - .
Launch Site:
Baikonur.
Launch Complex:
Baikonur LC1.
LV Family:
R-7.
Launch Vehicle:
Soyuz-FG.
- Soyuz TMA-21 - .
Call Sign: Tarkhany /
Gagarin. Crew: Borisenko,
Garan,
Samokutyayev.
Backup Crew: Burbank,
Ivanishin,
Shkaplerov.
Payload: Soyuz 7K-STMA s/n 231. Mass: 7,200 kg (15,800 lb). Nation: Russia.
Agency: RKA.
Program: ISS.
Class: Manned.
Type: Manned spacecraft. Flight: Soyuz TMA-21.
Spacecraft Bus: Soyuz.
Spacecraft: Soyuz TMA.
Duration: 164.24 days. Decay Date: 2011-09-16 . USAF Sat Cat: 37382 . COSPAR: 2011-012A. Apogee: 347 km (215 mi). Perigee: 343 km (213 mi). Inclination: 51.60 deg. Period: 91.40 min.
ISS EO-27 crew. The Soyuz docked at the Poisk module of the ISS at 23:09 GMT on 6 April, and undocked at 00:38 GMT on 16 September 2011, eight days later than planned due to the Progress M-11M launch failure. A dropout of communications after the reentry burn caused concern, but the crew landed safely in Kazakhstan at 03:59 GMT.
2011 April 27 - .
13:05 GMT - .
Launch Site:
Baikonur.
Launch Complex:
Baikonur LC1.
LV Family:
R-7.
Launch Vehicle:
Soyuz-U-PVB.
- Progress M-10M - .
Payload: Progress M s/n 410 / ISS-42P. Mass: 7,250 kg (15,980 lb). Nation: Russia.
Agency: RKA.
Program: ISS.
Class: Manned.
Type: Manned logistics spacecraft. Flight: Soyuz TMA-20,
Soyuz TMA-21.
Spacecraft Bus: Soyuz.
Spacecraft: Progress M.
Duration: 185.00 days. Decay Date: 2011-10-29 . USAF Sat Cat: 37396 . COSPAR: 2011-017A. Apogee: 347 km (215 mi). Perigee: 343 km (213 mi). Inclination: 51.60 deg. Period: 91.40 min. Docked with the ISS Pirs module at 14:28 GMT on 29 April. Undocked at 09:04 GMT on 29 October. Following retrofire at 12:10 GMT it was destroyed on reentry over the Pacific at 12:48 GMT..
2011 May 16 - .
12:56 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
2011 May 20 - .
- EVA STS-134-1 - .
Crew: Chamitoff,
Feustel.
EVA Duration: 0.26 days. Nation: USA.
Program: ISS.
Flight: Soyuz TMA-21,
STS-134.
Retrueved MISSE 7 experiments and replaced them with MISSE 8, and performed maintenance on the station exterior..
2011 May 22 - .
2011 May 25 - .
2011 May 27 - .
- EVA STS-134-4 - .
Crew: Chamitoff,
Fincke.
EVA Duration: 0.31 days. Nation: USA.
Program: ISS.
Flight: Soyuz TMA-21,
STS-134.
Moved the Orbiter Boom Sensor System from the shuttle to an ISS truss. Completed other external work on the Dextre arm and the PMM module. This EVA completed assembly of the US segment of the ISS..
2011 June 21 - .
14:38 GMT - .
Launch Site:
Baikonur.
Launch Complex:
Baikonur LC1.
LV Family:
R-7.
Launch Vehicle:
Soyuz-U-PVB.
2011 July 8 - .
15:29 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-135 - .
Call Sign: Atlantis. Payload: Atlantis F33 / Rafaello MPLM-2. Mass: 120,000 kg (260,000 lb). Nation: USA.
Program: ISS.
Class: Manned.
Type: Manned spaceplane. Flight: Soyuz TMA-02M,
Soyuz TMA-21,
STS-135.
Spacecraft Bus: Shuttle.
Spacecraft: Atlantis.
Duration: 12.77 days. Decay Date: 2011-07-21 . USAF Sat Cat: 37736 . COSPAR: 2011-031A. Apogee: 385 km (239 mi). Perigee: 371 km (230 mi). Inclination: 51.60 deg. Period: 92.10 min.
Final Space Shuttle flight, denoting the end of the space age. Atlantis docked with the Harmony module of the ISS on 10 June at 15:07 GMT. Primary payload was the Raffaello MultiPurpose Logistics Module delivering consumables and spare parts to the station sufficient to support the six crew members through the end of 2012 should delays occur in NASA's commercial robotic resupply program. Main crew task while docked with the station was to unload Rafaello and return of the station's failed coolant Pump Module for analysis. Atlantis undocked on 19 July at 06:28 GMT. The Picosat Solar Cell Experiment satellite was released from the cargo bay on 20 July. Atlantis made the final shuttle landing at the Kennedy Space Center on 21 July at 09:57 GMT. Payload delivered was:
- External Airlock/ODS: 1800 kg
- EMU spacesuits 3015, 3006: 260 kg
- RMS arm 301: 410 kg
- Orbiter Boom Sensor System: 382 kg
- MPLM-2 Rafaello: 11,556 kg
- SPDU: 17 kg
- ROEU 755 umbilical for MPLM: 78 kg
- Lightweight MPESS Carrier: 1050 kg
- Robotic Refuelling Mission: 300 kg
- Picosat Launcher: 22 kg
- PSSC-2/MTV Aerospace Corporation Picosat Solar Cell Experiment satellite: 4 kg
- Total payload: 15,879 kg
2011 July 12 - .
- EVA STS-135-1 - .
Crew: Fossum,
Garan.
EVA Duration: 0.27 days. Nation: USA.
Program: ISS.
Flight: Soyuz TMA-02M,
Soyuz TMA-21,
STS-135.
Final EVA from a shuttle. The astronauts moved a failed pump module to the shuttle bay, and deployed several experiments on the outside of the ISS..
2011 August 3 - .
- EVA ISS EO-27-1 - .
Crew: Samokutyayev,
Volkov, Sergey.
EVA Duration: 0.27 days. Nation: Russia.
Program: ISS.
Flight: Soyuz TMA-02M,
Soyuz TMA-21.
Cosmonauts Volkov and Samokutyaev, in Orlan suits, entered space from the Pirs module. They deployed the RadioSkaf-V amateur radio satellite and installed the BTLS-N lasercom terminal on the Zvezda module and the Biorisk-MSN exposure package outside the Pirs module.
2011 August 24 - .
13:00 GMT - .
Launch Site:
Baikonur.
Launch Complex:
Baikonur LC1.
LV Family:
R-7.
Launch Vehicle:
Soyuz-U-PVB.
FAILURE: Five minutes and 25 seconds into flight, during the burn of the booster's third stage, the engine's gas generator failed and the engine shut down. The upper stage and spacecraft crashed in the Gorno-Altai region..
Failed Stage: 3.
- Progress M-12M - .
Payload: Progress M s/n 412 / ISS-44P. Mass: 7,250 kg (15,980 lb). Nation: Russia.
Agency: RKA.
Program: ISS.
Class: Manned.
Type: Manned logistics spacecraft. Flight: Soyuz TMA-02M,
Soyuz TMA-21.
Spacecraft Bus: Soyuz.
Spacecraft: Progress M.
ISS resupply mission. The Progress M failed to reach orbit. Five minutes and 25 seconds into flight, during the burn of the booster's third stage, the engine's gas generator failed and the engine shut down. The upper stage and spacecraft crashed in the Gorno-Altai region of Russia. First ever failure of a Progress spacecraft to dock with a space station in its 135-mission history. The six crew aboard the ISS had sufficient supplies, but the mishap delayed the launch of the Expedition 29 replacement crew until the cause of the failure was understood and the Soyuz launch vehicle cleared again for manned launches. The return to Earth of the first half of the Expedition 28 crew has also delayed to mid-September, meaning the station would be reduced to a three-person crew for a time.
Back to top of page
Home - Search - Browse - Alphabetic Index: 0- 1- 2- 3- 4- 5- 6- 7- 8- 9
A- B- C- D- E- F- G- H- I- J- K- L- M- N- O- P- Q- R- S- T- U- V- W- X- Y- Z
© 1997-2019 Mark Wade - Contact
© / Conditions for Use