Home - Search - Browse - Alphabetic Index: 0- 1- 2- 3- 4- 5- 6- 7- 8- 9
A- B- C- D- E- F- G- H- I- J- K- L- M- N- O- P- Q- R- S- T- U- V- W- X- Y- Z
Soyuz TMA-20
Part of ISS
ISS Expedition EO-26. Six-month, long-term, resident crew of the International Space Station.
AKA: ISS EO-26;Varagian. Launched: 2010-12-15. Returned: 2011-05-23. Number crew: 3 . Duration: 159.30 days.
ISS EO-26 crew. Docked at the Rassvet module of the ISS at 20:11 GMT on 17 December. The crew boarded Soyuz TMA-20 and undocked at 21:35 GMT on 23 May 2011. They pulled back 200 m from the station, then took comprehensive photography of the station until 22:17 as it rotated before them. After departure from the visinity of the station, the Soyuz fired its engines at 01:36 GMT on 24 May to start the descent into the atmosphere. The orbital module and service modules separated from the descent module at 02:01 GMT. The crew landed safely in Kazakhstan at 02:27 GMT.
More at: Soyuz TMA-20.
Family:
Manned spaceflight.
People:
Coleman, Catherine,
Kondratiyev,
Nespoli.
Country:
Russia.
Spacecraft:
Soyuz TMA.
2010 December 15 - .
19:09 GMT - .
Launch Site:
Baikonur.
Launch Complex:
Baikonur LC1.
LV Family:
R-7.
Launch Vehicle:
Soyuz-FG.
- Soyuz TMA-20 - .
Call Sign: Varyag. Crew: Coleman, Catherine,
Kondratiyev,
Nespoli.
Backup Crew: Fossum,
Furukawa,
Ivanishin.
Payload: Soyuz 7K-STMA s/n 230. Mass: 7,200 kg (15,800 lb). Nation: Russia.
Agency: RKA.
Program: ISS.
Class: Manned.
Type: Manned spacecraft. Flight: Soyuz TMA-20.
Spacecraft Bus: Soyuz.
Spacecraft: Soyuz TMA.
Duration: 159.30 days. Decay Date: 2011-05-24 . USAF Sat Cat: 37254 . COSPAR: 2010-067A. Apogee: 355 km (220 mi). Perigee: 350 km (210 mi). Inclination: 51.60 deg. Period: 91.60 min.
ISS EO-26 crew. Docked at the Rassvet module of the ISS at 20:11 GMT on 17 December. The crew boarded Soyuz TMA-20 and undocked at 21:35 GMT on 23 May 2011. They pulled back 200 m from the station, then took comprehensive photography of the station until 22:17 as it rotated before them. After departure from the visinity of the station, the Soyuz fired its engines at 01:36 GMT on 24 May to start the descent into the atmosphere. The orbital module and service modules separated from the descent module at 02:01 GMT. The crew landed safely in Kazakhstan at 02:27 GMT.
2011 January 21 - .
2011 January 22 - .
05:37 GMT - .
Launch Site:
Tanegashima.
Launch Complex:
Tanegashima Y2.
LV Family:
H-2.
Launch Vehicle:
H-IIB.
- Kounotori 2 / HTV-2 - .
Mass: 16,000 kg (35,000 lb). Nation: Japan.
Program: ISS.
Class: Manned.
Type: Manned logistics spacecraft. Flight: Soyuz TMA-01M,
Soyuz TMA-20.
Spacecraft: HTV.
Duration: 67.00 days. Decay Date: 2011-03-30 . USAF Sat Cat: 37351 . COSPAR: 2011-003A. Apogee: 355 km (220 mi). Perigee: 350 km (210 mi). Inclination: 51.60 deg. Period: 91.60 min.
Second Japanese H-II Transfer Vehicle, delivering equipment and supplies to the International Space Station. Detached from the station by the station's robot arm and released into space on 28 March at 15:46 GMT. Following retrofire burned up over the Pacific Ocean on 30 March at 03:09 GMT on 30 March.
2011 January 28 - .
01:31 GMT - .
Launch Site:
Baikonur.
Launch Complex:
Baikonur LC1.
LV Family:
R-7.
Launch Vehicle:
Soyuz-U-PVB.
- Progress M-09M - .
Payload: Progress M s/n 409 / ISS-41P. Mass: 7,250 kg (15,980 lb). Nation: Russia.
Agency: RKA.
Program: ISS.
Class: Manned.
Type: Manned logistics spacecraft. Flight: Soyuz TMA-01M,
Soyuz TMA-20.
Spacecraft Bus: Soyuz.
Spacecraft: Progress M.
Duration: 88.00 days. Decay Date: 2011-04-26 . USAF Sat Cat: 37359 . COSPAR: 2011-004A. Apogee: 345 km (214 mi). Perigee: 270 km (160 mi). Inclination: 51.60 deg. Period: 90.70 min. Undocked from the Pirs module of the ISS on 22 April at 11:41 GMT and deorbited over the Pacific on 26 April..
2011 February 16 - .
2011 February 16 - .
21:51 GMT - .
Launch Site:
Kourou.
Launch Complex:
Kourou ELA3.
LV Family:
Ariane 5.
Launch Vehicle:
Ariane 5ES.
- ATV-2 Johannes Kepler - .
Mass: 19,712 kg (43,457 lb). Nation: Europe.
Program: ISS.
Class: Manned.
Type: Manned logistics spacecraft. Flight: Soyuz TMA-01M,
Soyuz TMA-20.
Spacecraft: ATV.
Duration: 125.00 days. Decay Date: 2011-06-21 . USAF Sat Cat: 37368 . COSPAR: 2011-007A. Apogee: 347 km (215 mi). Perigee: 343 km (213 mi). Inclination: 51.60 deg. Period: 91.40 min. ISS resupply; second European Space Agency Automated Transfer Vehicle. Docked with the ISS Zvezda module on 25 February. Undocked on 21 June at 14:46 GMT. Retrofire the same day at 20:04 GMT sent it to burn up over the Pacific Ocean..
2011 February 24 - .
21:53 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-133 - .
Call Sign: Discovery. Crew: Barratt,
Boe,
Bowen,
Drew,
Lindsey,
Stott.
Payload: Discovery F38 /. Mass: 121,840 kg (268,610 lb). Nation: USA.
Agency: NASA.
Program: ISS.
Class: Manned.
Type: Manned spaceplane. Flight: Soyuz TMA-01M,
Soyuz TMA-20,
STS-133.
Spacecraft Bus: Shuttle.
Spacecraft: Discovery.
Duration: 12.80 days. Decay Date: 2011-03-09 . USAF Sat Cat: 37371 . COSPAR: 2011-008A. Apogee: 355 km (220 mi). Perigee: 318 km (197 mi). Inclination: 51.60 deg. Period: 91.30 min.
Final flight of the space shuttle Discovery. The spaceplane docked with the International Space Station at 19:14 GMT on 26 February. The ELC-4 Express Logistics Carrier 4 was transferred from the Shuttle to the S3 station truss on 27 February. The station's SSRMS robot arm moved the Leonardo Permanent Multipurpose Module from the shuttle to the nadir port of the Unity module between 13:46 and 15:05 UTC on 1 March. Following cargo unloading and three spacewalks devoted to station repair and assembly, Discovery undocked from the station for the last time at 12:00 GMT on 7 March, landing at the Kennedy Space Center at 16:57 GMT on 9 March.
2011 February 28 - .
- EVA STS-133-1 - .
Crew: Bowen,
Drew.
EVA Duration: 0.27 days. Nation: USA.
Program: ISS.
Flight: Soyuz TMA-01M,
Soyuz TMA-20,
STS-133.
Installed a backup power cable between Unity and Tranquility; moved failed ammonia pump removed in August to Quest airlock; worked on the rail cart system on the S3 truss..
2011 March 2 - .
2011 April 27 - .
13:05 GMT - .
Launch Site:
Baikonur.
Launch Complex:
Baikonur LC1.
LV Family:
R-7.
Launch Vehicle:
Soyuz-U-PVB.
- Progress M-10M - .
Payload: Progress M s/n 410 / ISS-42P. Mass: 7,250 kg (15,980 lb). Nation: Russia.
Agency: RKA.
Program: ISS.
Class: Manned.
Type: Manned logistics spacecraft. Flight: Soyuz TMA-20,
Soyuz TMA-21.
Spacecraft Bus: Soyuz.
Spacecraft: Progress M.
Duration: 185.00 days. Decay Date: 2011-10-29 . USAF Sat Cat: 37396 . COSPAR: 2011-017A. Apogee: 347 km (215 mi). Perigee: 343 km (213 mi). Inclination: 51.60 deg. Period: 91.40 min. Docked with the ISS Pirs module at 14:28 GMT on 29 April. Undocked at 09:04 GMT on 29 October. Following retrofire at 12:10 GMT it was destroyed on reentry over the Pacific at 12:48 GMT..
2011 May 22 - .
Back to top of page
Home - Search - Browse - Alphabetic Index: 0- 1- 2- 3- 4- 5- 6- 7- 8- 9
A- B- C- D- E- F- G- H- I- J- K- L- M- N- O- P- Q- R- S- T- U- V- W- X- Y- Z
© 1997-2019 Mark Wade - Contact
© / Conditions for Use