Rocket was equipped with streamline retractable air vanes and wire-wound pressure storage tank; length 17 ft 8 in.; diameter 9 in.; altitude 3250 ft; duration 29.5 sec; much-improved stabilisation. Final results of Section B of L Series, from November 1936-May 1937, showed two proving-stand tests, and six flight test attempts, all of which resulted in flights. Average interval between tests 22 days
This was similar to the other two plans except it contained additional fiscal 1959 funding alternatives; i. e. , $100 million; $90 million; $75 million or $67 million. It was clearly apparent that I a major stumbling block to Air Force manned space program approval was its high cost, particularly for development of a new fluorine second stage. (Commander's Reference Book, "Chronology of Man-In-Space Effort, ~23 Mar 59.)
Apollo mission A-003, a planned high-altitude abort test, was flown at WSMR. About 25 seconds after launch, and at an altitude of about three miles, the Little Joe II booster disintegrated as a result of violent - and unprogrammed - roll. The launch escape system (LES) functioned perfectly, however, and lifted the spacecraft (boilerplate 22) clear of the vehicle. ASPO Manager Joseph F. Shea, while acknowledging that A-003's "prime objectives . . . were not met," rightly observed that the LES nonetheless "proved its mettle in an actual emergency,"
VPK resolution number 101 dated 27 April 1966 finally hits Kamanin's desk. It issues the orders to industry for implementation of the Party resolution 655-268 of 3 August 1964. 14 7K-L1 spacecraft are to be completed: one in the third quarter of 1966, two in the fourth quarter, and the rest between January and September 1967. Final integration of the first spacecraft is to be completed in October 1966,and flight trials from December 1966 to March 1967. Detailed planning for completion of simulators and trainers for the L1, and for international recovery forces to recover spacecraft returning from the moon, are to be completed within two weeks to a month from the date of the resolution. Meanwhile Tyulin reports that the launch of Voskhod 3 in May is no longer possible, and likely will be delayed until July. It is clear to Kamanin that Smirnov has effectively killed off Voskhod 3 in order to concentrate on the Soyuz, L1, and L3 programs.
On May 19 the crew elected not to make the first of a series of midcourse maneuvers. A second preplanned midcourse correction that adjusted the trajectory to coincide with a July lunar landing trajectory was executed at 3:19 p.m. The maneuver was so accurate that preplanned third and fourth midcourse corrections were canceled. During the translunar coast, five color TV transmissions totaling 72 minutes were made of the spacecraft and the earth. Additional Details: here....
Kamanin leaves for Tyuratam at 09:00 with 13 others aboard an Il-18 from Chkalov Airfield. The group included the 'space family' - Nikolayev, his wife Tereshkova, and their daughter Aleuka - with extensive photographic and film coverage. After the 10 hour flight, Kamanin goes to the 'Alley of Heroes' at Area 17 of the cosmodrome. Here each crew plants a tree before departing for space. The 11 first trees planted have all grown well, and are now 6 m tall with large crowns. Sevastyanov plants the 22nd tree. After a meeting of the State Commission, everyone watches an Italian movie, 'The Owl Appears at Day' - a story of murder in Sicily, terror against women, and the corruption of the Mafia (apparently a remake of the classic 'M').
Mars probe intended to conduct of a series of scientific investigations of the planet Mars and the space around it. Parameters are for Mars orbit. Mid-course corrections were made on 17 June and 20 November. Mars 2 released the descent module (1971-045D) 4.5 hours before reaching Mars on 27 November 1971. The descent system malfunctioned and the lander crashed at 45 deg S, 302 deg W, delivering the Soviet Union coat of arms to the surface. Meanwhile, the orbiter engine performed a burn to put the spacecraft into a 1380 x 24,940 km, 18 hour orbit about Mars with an inclination of 48.9 degrees. Scientific instruments were generally turned on for about 30 minutes near periapsis. Data was sent back for many months. It was announced that Mars 2 and 3 had completed their missions by 22 August 1972. On-orbit dry mass: 2265 kg. Had the lander survived, data would have been relayed to the earth via the orbiter.
The group was selected to provide pilot, engineer, and scientist astronauts for space shuttle flights.. Qualifications: Pilots: Bachelor's degree in engineering, biological science, physical science or mathematics. Advanced degree desirable. At least 1,000 flight-hours of pilot-in-command time. Flight test experience desirable. Excellent health. Vision minimum 20/50 uncorrected, correctable to 20/20 vision; maximum sitting blood pressure 140/90. Height between 163 and 193 cm.
Mission Specialists: Bachelor's degree in engineering, biological science, physical science or mathematics and minimum three years of related experience or an advanced degree. Vision minimum 20/150 uncorrected, correctable to 20/20. Maximum sitting blood pressure of 140/90. Height between 150 and 193 cm..
Spacecraft engaged in practical applications and uses of space technology such as weather or communication (US Cat C). Launch vehicle put payload into geosynchronous transfer orbit Positioned in geosynchronous orbit at 29 deg E in 1983; 18 deg W in 1983-1992; 34 deg W in 1992; 50 deg W in 1992-1995; 31 deg W in 1995-1998 As of 4 September 2001 located at 47.96 deg E drifting at 3.999 deg W per day. As of 2007 Mar 10 located at 62.15W drifting at 3.995W degrees per day.
Unmanned supply vessel to Mir. Rendezvoused with Mir/Kvant in its orbit of 343 X 366 km, 51. 6 deg. Docked with the station on 21 May 1987 05:50:38 GMT. Undocked on 19 Jul 1987 00:19:51 GMT. Destroyed in reentry on 19 Jul 1987 05:42:00 GMT. Total free-flight time 2.30 days. Total docked time 58.77 days.
Deployed and retrieved Spartan 2; deployed PAMS-STU; carried Spacehab module. Payloads: Shuttle Pointed Research Tool for Astronomy (SPARTAN) 207/Inflatable Antenna Experiment (IAE); Technology Experiments Advancing Missions in Space (TEAMS) 01 (includes Vented Tank Resupply Experiment (VTRE), Global Positioning System (GPS) Attitude and Navigation Experiment (GANE) (RME 1316), Liquid Metal Test Experiment (LMTE) and Passive Aerodynami-cally Stabilized Magnetically Damped Satellite (PAMS) Satellite Test Unit (STU); SPACEHAB-4; Brilliant Eyes Ten-Kelvin Sorption Cryocooler Experiment (BETSCE); 12 getaway specials attached to a GAS bridge assembly (GAS 056, 063, 142, 144, 163, 200, 490, 564, 565, 703, 741 and the Reduced-Fill Tank Pressure Control Experiment (RFTPCE); Aquatic Research Facility (ARF) 01; Biological Research in Canisters (BRIC) 07, Block III.
ISS Logistics flight. Launch delayed three times by weather. Objective of mission STS-101 was repair, resupply and construction tasks aboard the international space station. This was the first launch with new electronic cockpit displays and other upgrades. The solid boosters separated at 10:13 GMT and the main engines cutoff at 10:19 GMT. The external tank, ET-102 then separated, with both orbiter and ET-102 in a 52 x 320 km initial orbit. At 10:54 GMT the OMS engines fired to raise perigee to 159 x 329 km x at 51.6 deg. Atlantis docked with the International Space Station's PMA-2 docking adapter on the Unity node at 04:31 GMT on May 21. At that time the ISS was in a 332 x 341 km orbit.
On May 22 mission specialists Jeff Williams and James carried out external maintenance work on the ISS.
On May 23 at 00:03 GMT the Atlantis crew opened the first hatch to PMA-2 and entered the Station. The crew replaced a set of batteries in Zarya, installed fans and ducting to improve airflow, and delivered supplies and equipment. Three hour-long orbit raising burns on May 24 and 25 by the RCS engines on Atlantis raised the station to a 372 x 380 km x 51.6 deg orbit.
The STS-101 crew left the station on May 26, closing the PMA-2 hatch at 08:08 GMT and undocking at 23:03 GMT. Atlantis performed a 180 degree flyaround of the station and departed the vicinity around 23:44 GMT.
Atlantis closed its payload bay doors around 02:30 GMT on May 29 and fired the OMS engines for deorbit at 05:12 GMT. The vehicle landed on RW15 at Kennedy Space Center at 06:20 GMT. Atlantis was to be turned around for the next ISS shuttle flight, STS-106.
Left in orbit was the renovated International Space Station, equipped with an upgraded electrical system, new fans, filters, fire extinguishers, smoke detectors and communications gear.