Rocket was equipped with equaliser to prevent liquid-oxygen tank pressure from exceeding gasoline tank pressure, pendulum stabiliser, and 10-ft parachute; flame small and white; duration 12 sec; altitude about 1000 ft; then tilted to a horizontal powered flight at speed of over 700 mph; landed 11,000 ft from tower. Pendulum stabiliser as was expected gave an indication of operating the vanes for the first few hundred feet, but not thereafter.
the Hague, Wassenaar, rocket fired, impacted on the boundary of Finsbury borough and City of London borough. Direct hit on block of Smithfield Market, corner of Charterhouse Street and Farringdon Road. One block totally destroyed, others severely damaged. Gas main and water main fractured, underground railway damaged. 110 Dead, 123 seriously injured.
Ministry of Aviation Industry (MAP) Decree 293-140 'On subordinating GSNII-642 to OKB-52' was issued. On the same day Chelomei hired Nikita Khrushchev's son, Sergei, to work as an engineer in his design bureau. This gave Chelomei sudden and immediate access to the highest possible patron in the hierarchy. He was rewarded with his own design bureau, OKB-52, in 1959. This would lead to Chelomei being a key figure in the Soviet space program, even after Khruschev's ouster in 1964.
The Air Force Ballistic Missile Division proposed an over-all space objective about which all other experimental projects would be oriented. This goal was briefly stated as "Manned Space Flight to the Moon and Return. " To achieve this ultimate accomplishment many other space projects and programs would be necessary. The final goal would furnish an objective and a means to develop an integrated space program instead of isolated space ventures whose value might be unrelated to any national purpose. Admittedly, achieving this goal would require much preliminary work and completion of the following programs: Instrumented Satellite Flights and Return; Animals in Satellite Orbit and Return; Biomedical Experiments in Satellite Flights; Man in Satellite Orbit and Return; Instruments and Equipment Around Moon and Return; Animal Around Moon and Return; Instrumented Hard Landing on Moon; Instruments -Equipment Soft Landing on Moon and Return; Animal Soft Landing on Moon and Return; Man Around Moon and Return; Manned Landing on the Moon and Return (Memo, Col L. D. Ely, to Co) C. H. Terhune, 8 Mar 58, subj: Meeting with Hq ARDC Biomedical and Behavioral Sciences Panels, 10-12 Mar.)
An abort test was conducted at Wallops Island on a full-scale model of the spacecraft with the escape tower, using a Recruit escape rocket. The configuration did not perform as expected (erratic motion), and as a result, the Langley Research Center was requested to test small-scale flight models of the abort system to determine its motion in flight.
Ustinov, Smirnov, and other industry leaders challenge the plan for dual female flights. They would send only one woman aloft in Vostok s/n 007. Vostok s/n 008 would be held as a reserve. If Vostok s/n 007 was successful, s/n 008 would be used for a simultaneous manned flight. Training was to be complete by 1 April. The Soviet Air Force was categorically against this sudden revision. There were four women that had completed advanced training and were ready for flight, while there were only three men in training for flights later in the year. It would be impossible to complete the training of the male cosmonauts in a few weeks. However the spacecraft would reach the end of their storage life by May-June 1963 and would have to be used by then.
Missiles and Rockets reported a statement by Joseph F. Shea, ASPO manager, that MSC had no serious weight problems with the Apollo spacecraft. The current weight, he said, was 454 kg (1,000 lbs) under the 40,823 kg (90,000 lb) goal. Moreover, the increased payload of the Saturn V to 43,091 kg (95,000 lbs) permitted further increases. Shea admitted, however, that the LEM was growing; recent decisions in favor of safety and redundancy could raise the module's weight from 13,381 kg to 14,575 kg (29,500 lbs to 32,000 lbs).
NASA Associate Administrator for Manned Space Flight George E. Mueller stated that the February completion of MSFC studies of the Saturn V launch vehicle's payload and structural capability would permit an official revision of the payload from 43,100 kilograms to 44,500 kilograms; the CM weight would be revised from 5,000 to 5,400 kilograms; and the LM from 13,600 to 14,500.
Space Systems Division awarded the Space and Reentry Systems Division of Philco-Ford Corporation a contract for the development and production of the spacecraft for the United Kingdom's Skynet. Two spin-stabilized, synchronous, station-keeping satellites were to be produced. Thrust Augmented Thor/Delta boosters and launch services would be procured from NASA by Space Systems Division to place the satellite into orbit. When operational, both Skynet satellites would form part of the larger United States Initial Defense Satellite Communication System Program (IDSCS).
NASA technicians at KSC completed the flight readiness test for Apollo 6. The two-day event was delayed several days because of difficulties in modifying the service propulsion system tank skirt. With that significant launch-preparation event completed, program officials were reassessing the launch date in light of work remaining on the vehicle.
Mobile and maritime communications; 15.5 deg W. Positioned in geosynchronous orbit at 15 deg W in 1991-1996; 55 deg W in 1997-1999; DRIFT As of 6 September 2001 located at 97.95 deg W drifting at 0.002 deg W per day. As of 2007 Mar 11 located at 97.96W drifting at 0.006W degrees per day.
Geosynchronous. Stationed over 118.7W Launch vehicle put payload into subsynchronous earth orbit with MRS trajectory option. Positioned in geosynchronous orbit at 119 deg W in 1997-1999 As of 5 September 2001 located at 118.82 deg W drifting at 0.001 deg W per day. As of 2007 Mar 10 located at 42.64E drifting at 4.479W degrees per day.
Launch delayed from March 2. Eurobird was a Spacebus 3000B3 built by Alcatel (Cannes). It was the 18th member of the European Eutelsat consortium's geosynchronous constellation and carried 24 Ku-band transponders to provide broad bandwidth and high power direct-to-home transmissions to enable digital entertainment and internet connections. The three tonne (with fuel) satellite was to be parked over 28.5 deg-E longitude, replacing the aging Copernicus (Kopernikus (DFS 3), 1992-066A). Dry mass was probably around 1300 kg. The satellite had an Astrium S400 bipropellant engine. Positioned in geosynchronous orbit at 28 deg E in 2001 As of 4 September 2001 located at 28.50 deg E drifting at 0.005 deg W per day. As of 2007 Mar 11 located at 28.52E drifting at 0.000W degrees per day.
BSAT-2a was a Japanese geosynchronous communications spacecraft and the second Orbital STAR-class television broadcasting satellite. Its launch mass was 1317 kg; dry mass was 535 kg. The satellite had a Thiokol Star 30CBP solid apogee motor. The new BSTAR STAR-class satellites are a new design replacing the earlier Starbus type satellite of which only one (Cakrawarta 1) was launched. BSAT Corp. (Broadcasting Satellite System Corp.) earlier launched HS-376 satellites BSAT 1a and 1b, replacing the government's BS series which began Japanese direct broadcast services in 1978. The satellite was to be parked over 110 deg-E longitude to provide direct-to-home voice, video and internet communications. Positioned in geosynchronous orbit at 110 deg E in 2001 As of 5 September 2001 located at 109.82 deg E drifting at 0.018 deg W per day. As of 2007 Mar 11 located at 109.92E drifting at 0.009W degrees per day.
STS 102 was an American shuttle spacecraft that carried a crew of seven astronauts (six American and one Russian). The primary mission was to deliver a multi-rack Italian container (Leonardo MultiPurpose Logistics Module, LMPLM) to the Destiny Module of the International Space Station, ISS. It docked with the ISS at 05:34 UT on 9 March. The 6.4 m x 4.6 m cylindrical LMPLM delivered new equipment to Destiny, and retrieved used/unwanted equipment, and trash back to the shuttle. The crew did a few spacewalks to install a platform on the ISS to support a Canadian robot arm when it arrives next month. The STS 102 left behind three of the astronauts (two American and one Russian) and brought back the three astronauts (one American and two Russian) who had been inhabiting the ISS for about four and a half months. It landed at Cape Canaveral at 07:31 UT on 21 March.
Discovery was launched on mission STS-102 (Space Station flight 5A.1) into an initial 60 x 222 km x 51.6 deg orbit. The mission was delivery of supplies and equipment, and changeout of the Expedition One and Expedition Two station crews. STS-102 carried the Leonardo Multi Purpose Logistics Module (MPLM), built by Alenia Spazio (Torino), to the International Space Station. The 6.4 m x 4.6 m cylindrical MPLM was a descendant of the Spacelab long modules. Also carried was a Spacehab/Energia unpressurized Integrated Cargo Carrier with LCA/MTSAS-A, RU, and PFCS. A sidewall adapter beam with two GAS canisters (G-783 and WSVFM) was also on board. WSVFM measured vibration during launch. Another adapter beam, probably at the rear of the payload bay, carried SEM-9. SEM-9 and G-783 contained high school microgravity experiments.
Leonardo carried 16 'racks' of equipment, including the Human Research Facility Rack (Rack 13) which allowed the astronauts to do extensive medical experiments, the CHeCS Rack (28), the DDCU-1 and DDCU-2 racks (7 and 9), the Avionics-3 (Rack 6), and the MSS Avionics/Lab (Rack 11) and Avionics/Cupola (Rack 12) racks for a total of 7 equipment racks to be installed on Destiny. Three Resupply Stowage Racks (50, 51, 52) and four Resupply Stowage Platforms (180, 181, 182 and 188) remained installed on Leonardo, with their equipment bags being individually transferred to the Station. System Racks 2, 3, 4, 5 and 8 were already on Destiny together with stowage racks 110 through 117. Each rack had a mass of 150-300 kg.
The orbiter fired its OMS engines at 1221 GMT to raise the orbit to 185 x 219 km. Discovery docked with the PMA-2 port on the Station at 0639 GMT on March 10. The LCA (Lab Cradle Assembly) was attached to Destiny's +Z side during an EVA. It was to be used on the next mission to temporarily place a Spacelab pallet on Destiny during installation of the Station's robot arm. Later, it would be the site for the main Station truss, beginning with segment S0.
The PMA-3, on Unity at the -Z nadir position, had to be moved to the port position to make room for Leonardo. An external stowage platform was attached to Destiny and the External Stowage Platform and the PFCS Pump Flow Control System were added to the port aft trunnion on Destiny. A rigid umbilical (RU) was connected to the PDGF grapple fixture on Destiny to support the Station's future robot arm. Leonardo was docked to Unity at -Z for a while so that its cargo could be transferred to the station easily; it was then be returned to the payload bay and brought back to earth.
At 0232 GMT on March 19 command of ISS was transferred to Expedition 2 and the hatches were closed. Discovery undocked at 0432 GMT and flew once around the station before departing at 0548 GMT. ISS mass after undocking was 115527 kg. The OMS engines fired for the deorbit burn at 0625 GMT on March 21, and Discovery touched down on runway 15 at Kennedy Space Center at 0731 GMT.
The EVA ran from 0841 to 1606 UTC. The astronauts installed the NICMOS cooling system (NCS). During preparations for EVA-3, a problem with a valve on Grunsfeld's suit caused it to leak water, and Grunsfeld switched to Newman's suit. For each of EVA-3,4,5 the appropriate size legs and arms were replaced on the same basic HUT (Hard Upper Torso)/PLSS (Primary Life Support System) combination.
Launch delayed from October 31, November 13 and 26, 2001 and February 6 due to contract dispute with Boeing over performance of earlier satellites of the series. The Centaur upper stage entered a 167 x 578 km parking orbit and then placed the payload into a 247 x 29135 km x 27.1 deg subsynchronous transfer orbit. NASA's TDRS-I (TDRS-9) data relay satellite used a Boeing BSS-601 bus and was to provide S, Ku and Ka band communications for the Shuttle and International Space Station. After launch a problem developed with the fuel supply from one of the satellite's four propellant tanks. The tanks were paired, so losing one tank cuts the propellant supply in half. A test burn of the General Dynamics R-4D apogee motor raised the orbit to 433 x 29146 km x 26.4 deg on March 11 and a larger perigee burn raised the apogee to geostationary altitude, 429 x 35800 km, on March 13. A further burn on March 19, raised the orbit to 3521 x 35789 km and lowered the inclination to 21.4 deg. A burn on March 25 raised the orbit further to 8383 x 35811 km and lowered inclination to 17.4 deg. As of 2007 Mar 11 located at 62.04W drifting at 0.008W degrees per day.