Martin established what would become the astronautics group in 1956 for development and production of the Titan I ICBM.
The Mars Climate Orbiter was the second flight of the Mars Surveyor Program. The probe was to enter a 160 km x 38600 km polar orbit around Mars on September 23,1999, and use aerobraking to reach a 373 km x 437 km x 92.9 degree sun-synchronous mapping orbit by November 23 1999. While the Mars Orbit Insertion burn began as planned on September 23, 1999 at 08:50 GMT, no signal was received after the spacecraft went behind the planet. Subsequent investigation showed that the spacecraft had plunged deep into the Martian atmosphere, with its closest approach to Mars being 57 km. It was concluded that the spacecraft burnt up in the atmosphere. It was later found that cutbacks in tracking, combined with incorrect values in a look-up table imbedded deep in the spacecraft software (use of pounds force instead of newtons) were to blame. This failure led to a shake-up of NASA's 'faster, better, cheaper' approach to unmanned spaceflight. Additional Details: here....
The Mars Polar Lander was placed by the first burn of the second stage into a 157 x 245 km x 28.35 deg parking orbit. The second stage restarted at 20:55 GMT and shut down in a 226 x 740 km x 25.8 deg Earth orbit. The solid rocket third stage (a Star 48B with a Nutation Control System and a yo-yo despin device) then ignited and put the spacecraft into solar orbit, separating at 21:02 GMT. Mars Polar Lander was to land near the south pole of Mars on December 3, 1999, and conduct conduct a three month mission, trenching near its landing site and testing for the presense of frozen water and carbon dioxide. Attached were two Deep Space 2 Microprobes, penetrators which would impact the Martian surface separately from the lander and return data on subsurface conditions from widely spaced points.
When the spacecraft reached Mars on December 3, the lander separated from the cruise stage at 19:51 UTC and the two penetrators, Scott and Amundsen, were to separate about 20 seconds later. No further communications were ever received from the spacecraft. Landing had been expected at 20:01 UTC at 76.1S 195.3W, with the penetrators landing a few kilometres from each other at 75.0S 196.5W.
This failure resulted in a review and reassessment of NASA's 'faster, better, cheaper' approach to planetary missions.
Stardust was to fly within 100 km of comet 81P/Wild-2 in January 2004 and recover cometary material using an aerogel substance. A return capsule would land on a lake bed in Utah in January 2006, returning the material to earth. The launch went as planned. The second stage ignited at 21:08 GMT and its first burn put the vehicle into a 185 km x 185 km x 28 degree parking orbit at 21:14 GMT. The second stage second burn at 21:25 changed the orbit to planned values of 178 km x 7184 km x 28.5 degrees. The Star 37FM solid third stage ignited at 21:29 GMT and placed the spacecraft into a 2 year period solar orbit. The spacecraft separated at 21:31 GMT. Meanwhile, the Delta 266 second stage burned a third time on its own, until its propellants were depleted, entering a final orbit of 294 km x 6818 km x 22.5 degrees. The Stardust probe flew past Earth at a distance of 3706 km at 1115 GMT on January 15, 2001, and flew near the Moon at a distance of 98000 km at around 0200 GMT on January 16. The gravity assist flyby changed Stardust's heliocentric orbit from 0.956 x 2.216 AU x 0.0 deg to 0.983 x 2.285 AU x 3.7 deg.
Tracking stations downrange did not pick up the spacecraft. It was later determined that the rocket nose fairing failed to separate four minutes after launch. The extra mass caused the vehicle to reenter over the South Pacific on the first partial orbit. Space Imaging's Ikonos 1 was to have been the first commercial imaging satellite with a high a resolution camera.
The National Reconnaissance Office satellite was reported to be an Onyx (formerly Lacrosse) radar imaging spacecraft built by Lockheed Martin. The Titan second stage reached a 572 x 675 km x 68.0 deg orbit and separated from the payload. Amateur observers reported the payload has made two small maneuvers and by Aug 23 was in a 681 x 695 km x 68.1 deg orbit.
Launch delayed from February 10 and July 30. The Genesis probe flew to the Earth-Sun L1 Lagrangian point and spend two years collecting samples of the solar wind. The collected samples were to be physically returned to Earth in a sample return capsule (air-snatch recovery was planned over Utah) and analysed in ground-based laboratories. The first burn of the Delta second stage put Genesis in a 185 x 197 km x 28.5 deg parking orbit at 1624 GMT. At 1712 GMT a second burn raised the orbit to 182 x 3811 km, and at 1713 GMT the third stage fired to put Genesis on its trajectory to L1 with a nominal apogee of around 1.2 million km. By the first week of November 2001 Genesis arrived at the Earth-Sun L1 point. A malfunctioning thermal radiator caused some concern for the health of the sample return capsule's critical battery, which was overheating, but Genesis began collecting solar wind samples on schedule.
On September 8, 2004, the Genesis space probe became the first spacecraft to return from beyond lunar orbit to the Earth's surface. The Genesis Sample Return Capsule separated from the spacecraft on September 8, 66,000 km above the Earth. The capsule successfully re-entered the atmosphere over Oregon at 11 km/s, but a wiring error resulted in the drogue parachute release mortar failing to fire at 33 km altitude. The capsule crashed to earth at 90 m/s in the Dugway Proving Ground at 40 07 40 N 113 30 29 W. Although the vehicle was smashed, some of the samples could be retrieved.
Launch delayed from July 31. Move of launch of the Intruder naval electronic intelligence satellites for the National Reconnaissance Office (NRO) from the Titan to the Atlas launch vehicle. The Lockheed Martin Atlas IIAS AC-160 put the vehicle in a transfer orbit. The phrasing of the launch commentary implied that the second burn left the payload in 'transfer orbit', but several observers saw the bright Centaur in the typical final deployment orbit of the earlier NOSS satellites. Therefore it seemed the first burn was to a transfer orbit of around 180 x 1100 km x 63 deg. The second burn at 1629 GMT put the Centaur and payload into an 1100 x 1100 km x 63 deg orbit. The design was apparently different from earlier generation NOSS satellites since only one companion satellite was deployed rather than two, in line with the lower payload capability of the Atlas. Prime contractor for the new satellites was again believed to be Lockheed Martin Astronautics at Denver. The NRL probably continued to have a management and technical role in the program under overall NRO auspices.
Asteroid belt unmanned probe designed to first orbit and survey the asteroid Vesta, and then fly on to the largest asteroid, Ceres. The Delta upper stage boosted the spacecraft and PAM-D solid third stage to 9.01 km/sec and a 185 km x 6835 km orbit. The PAM-D fired at 12:29 GMT and released Dawn after accelerating it to 11.50 km/sec and sending it into a 1.00 AU x 1.62 AU x 0.5 deg solar orbit. The ion engines were ignited on 6 October. Using its ion engines and a Mars flyby in February 2009, Dawn was scheduled to reach Vesta in 2011 and Ceres in 2015.
Classified National Reconnaisance Office payload; probable primary payload data relay communications. May also have carried SBIRS HEO-2 infrared missile warning sensor and a TWINS-B magnetospheric research experiment. Initial orbit 261 x 16776 km x 60.0 deg.
Classified National Reconnaisance Office satellite placed in a Molniya orbit; orbital parameters are estimated. Believed to be the second in a new series carrying combined signals intelligence and early warning payloads. Probable sensors included the SBIRS HEO-2 infrared missile early warning package and the NASA/Los Alamos TWINS-B magnetospheric research payload.
The Delta's second stage first cutoff at 06:20 GMT put the stage and payload into a 174 km x 205 km parking orbit. The stage fired again to place the satellite into a 188 km x 20325 km x 40.0 deg transfer orbit. USA 201 fired its apogee motor at 09:21 GMT on 17 March in and placed itself into its operational final orbit.
Used a 0.95-meter aperture differential photometer with a 105 deg2 field of view to constantly view 145,000 main-sequence stars, detecting planets orbiting around those stars when the planets passed in front of them, dimming them during transit. In its first three years of operation, Kepler detected over 2,000 possible planets, and it was determined that 5.4% of all stars host Earth-size planet candidates, and that 17% of all stars had planets.
Lunar impact probe, designed to detect ice in the lunar polar regions. LCROSS and the Centaur stage flew 3270 km from the Moon at 1030 GMT on June 23 and were hurled to a 5820,00 km apogee. On 9 October LCROSS separated from the Centaur. The Centaur impacted in Cabeus crater at 11:31 GMT on 9 October followed by LCROSS at 11:35 GMT. The impacts did not produce the expected spectacular impact plume as expected. However later data reduction did show significant amounts of water.
Communications satellite to replace IS-1R at 24 deg W over the Atlantic. The Centaur AV-024 upper stage maneuvered and then released the satellite into a 6157 km x 39094 km x 22.5 deg geosynchronous transfer orbit at 08:53 GMT. IS-14 then used its own propulsion to reach its operational orbit. Mass 2517 kg unfuelled.
Wide Field Infrared Explorer astronomy satellite, designed to conduct an all-sky survey at infrared frequencies of 3.4, 4.6, 12 and 22 microns, detecting objects 100 times fainter than the earlier IRAS and Akari satellites. Primary instrument is a 40 cm telescope cooled to 12 K by a cryostat filled with solid hydrogen. The survey was expected to detect tens of thousands of new asteroids, brown dwarf stars, and planets orbiting nearby stars.
Solar Dynamics Observatory. The Centaur AV-021 upper stage moved from an initial 175 km x 3706 km x 28.7 deg parking orbit to a 2480 km x 35369 km x 28.6 deg transfer orbitand then released the satellite, which used its own R4D thruster to reach geosynchronous orbit.
First USAF Advanced EHF communications satellite. Placed in an initial 221 x 50179 km x 22.2 deg geosynchronous transfer orbit by the Atlas Centaur upper stage. However the satellite's main BT-4 engine failed, meaning the secondary hydrazine thrusters were used to much more satellite raise the spacecraft to geosynchronous orbit.