RS-11 was launched at 0051 hours EST from AMR after a three-hour hold. The flight was unsuccessful. The LOX container pressure and the combustion chamber decreased 50 seconds after lift-off. The temperature of Fin Number 1 went out of measuring range 72 seconds after lift-off. The servo battery current dropped to zero and the stabilised platform lost its reference. The range safety officer gave the emergency cut-off signal at 79 seconds. Impact occurred approximately 21,000 yards from the launch pad. The RS-11 was the first flight with the complete guidance system. Missed aimpoint by 118,800 m.
The merger of North American Aviation, Inc., and Rockwell-Standard Corp. became effective and was announced. The company was organized into two major groups, the Commercial Products Group and the Aerospace and Systems Group. The new company would be known as North American Rockwell and use the acronym NR.
At 17:00 communications with Zond 5 are lost as it re-enters over the South Pole. It has to re-enter at an angle of 5 to 6 degrees to the horizontal. One degree too high, and it will skip off the atmosphere and be lost into space; one degree too low and the G-forces will increase from 10-16 to 30-40 - which are not only enough to kill the crew, but to destroy the spacecraft. The safe entry corridor is only 13 km across and it has to be hit at 11 km/sec. - like hitting a kopek with a rifle at 600 m range. The re-entry schedule:
A second arrives 50 minutes later. They bring the 49-strong VVS contingent for the Soyuz 6-7-8 state commission. The other members of the commission arrive aboard an Il-18. 2 to 3 weeks earlier an epidemic of dysentery swept the cosmodrome. This was a danger to the space flight crews -- no one showing signs of carrying the disease were allowed near them. They were isolated in special areas and only cleared trainers were allowed access to them during the outbreak. In the evening the American film 'Good Arrangement' is shown, the story of a husband in the role of a nanny for three children.
The ATM, which had been at MSC since mid-July, was immediately moved to the Operations and Checkout Building in KSC's industrial area and placed in the cleanroom for intensive checkout. The ATM was scheduled to be moved in January 1973 to the Vehicle Assembly Building for mating with the OWS atop the two-stage Saturn V launch vehicle. The Skylab orbital assembly- consisting of the OWS, the ATM, and the AM/MDA-was scheduled to be launched from Pad A of Launch Complex 39 in late April 1973.
Investigation of the corpuscular and electromagnetic radiation of the sun and of solar plasma fluxes, study of the magnetic fields in circumterrestrial space in order to determine the effects of solar activity on the interplanetary medium and in the magne tosphere of the earth.
Spacecraft engaged in practical applications and uses of space technology such as weather or communication (US Cat C). Positioned in geosynchronous orbit at 74 deg W in 1983-1994 As of 4 September 2001 located at 110.16 deg W drifting at 0.457 deg W per day. As of 2007 Mar 10 located at 57.56E drifting at 0.460W degrees per day.
Until 22.09.93 the cosmonauts made preparations for an EVA on 24.09.93. During that EVA they had to execute the program 'Panorama', which is an inspection of the outer surface of the station by camera's. On 22.09.93 TsUP announced that the EVA had been put back to 28.09.93. A reason for the delay has not been stated. Possibly the unstable political situation in Moscow has something to do with it, but technical reasons are also possible. On 22.09.93 the crew worked on a problem with a pressure-valve (KVD) of the airlock (Sh.S.O.) in Module-D.
Mir-station hit by a particle from outer space:
On 21.09.93 at abt. 1205 UTC, while the station was near the equator, Tsibliyev heard the clap of a particle colliding with Mir's outer surface. The impact caused a little cloud of dust and released some pieces of paint of the wall. Tsibliyev heard the impact while he was flying from Kvant-1 to the Base Block. Serebrov, who was working in Module-D, did not hear it.
Chris v.d. Berg, NL-9165/A-UK3202.
On 22.09 at 0123 UTC the crew was waked up by the alarm signal: Check the SUD (attitude control). When they did they saw that the Ts.V.M.-1, the main computer had switched itself off. Solovyov reported this to TsUP during the pass over here in orbit 66214, 0130-0140 UTC. The first system to be switched was again the oxygen generator Elektron.
During the pass in orb. 66215, 0305-0316 UTC, S. reported that initially the attitude of the complex was not so good. The complex is flying the so called free drift. The supply from the solar panels decreased to a level of 200 Amperes.
Chris v.d. Berg, NL-9165/A-UK3202.
First test of a new NASA high performance sounding rocket. The Talos-Terrier-Oriole carried a dummy Nihka fourth stage as part of its 775 kg payload. The all-up Oriole 12 (Talos-Terrier-Oriole-Nihka) rocket was originally planned to be flown to 777 km above Poker Flat to study the aurora as flight NASA 49.001 in February 2013.