Docked with ISS. Outfitted the new Zvezda module for the arrival of the first permanent EO-1 crew.

AKA: Atlantis;ISS-2A.2b. Launched: 2000-09-08. Returned: 2000-09-20. Number crew: 7 . Duration: 11.80 days.

Atlantis was launched from Kennedy Space Center's Launch Complex 39B. Solid rocket boosters RSRM-75 and external tank ET-103 were used to loft the orbiter into space. The initial orbit of 72 x 328 km x 51.6 deg was circularized by the Shuttle's OMS engines at apogee.

Atlantis docked with the PMA-2 adapter on the International Space Station at 05:51 GMT on September 10. The orbiter's small RCS engines were used to gently reboost the station's orbit several times.

Astronauts Lu and Malenchenko made a spacewalk on September 11 beginning at 04:47 GMT. They rode the RMS arm up to Zvezda and began installing cables, reaching a distance of 30 meters from the airlock when installing Zvezda's magnetometer. Total EVA duration was 6 hours 21 minutes.

During their 12-day flight, the astronauts spent a week docked to the International Space Station during which they worked as movers, cleaners, plumbers, electricians and cable installers. In all, they spent 7 days, 21 hours and 54 minutes docked to the International Space Station, outfitting the new Zvezda module for the arrival of the Expedition One crew later this fall.

The Shuttle undocked from ISS at 03:44 GMT on September 18 and made two circuits of the station each lasting half an orbit, before separating finally at 05:34 GMT. The payload bay doors were closed at 04:14 GMT on September 20 and at 06:50 GMT the OMS engines ignited for a three minute burn lowering the orbit from 374 x 386 km x 51.6 deg to 22 x 380 km x 51.6 deg. After entry interface at 07:25 GMT, the orbiter glided to a landing on runway 15 at Kennedy Space Center with main gear touchdown at 07:56:48 GMT for a mission duration of 283 hr 11min.

NASA Official Mission Summary

STS-106
Mission: International Space Station Flight 2A.2b
Space Shuttle: Atlantis
Launch Pad: 39B
Launched: September 8, 2000, 8:45:47 a.m. EDT
Landing Site: Kennedy Space Center, Florida
Landing: September 20, 2000, 3:58:01 a.m. EDT
Runway: 15
Rollout Distance: 9,127 feet
Rollout Time: 73 seconds
Revolution: 185
Mission Duration: 11 days, 19 hours, 12 minutes and 15 seconds
Orbit Altitude: 173 nautical miles
Orbit Inclination: 51.6 degrees
Miles Traveled: 4.9 million

Crew Members

Commander Terrence W. Wilcutt, Pilot Scott D. Altman, Mission Specialists Daniel C. Burbank, Edward T. Lu, Richard A. Mastracchio, Yuri I. Malenchenko and Boris V. Morukov.

Mission Highlights

STS-106, during its 11-day mission to the International Space Station, completed all assigned mission objectives to prepare the station for the first crew scheduled to launch in October. The mission to the 143-foot-long station focused on unloading nearly three tons of cargo from the orbiter and a Progress supply craft already docked to the opposite end of the International Space Station.

On flight day two, Atlantis completed a successful rendezvous and docking with the ISS in early morning setting the stage for six days of outfitting.

A 6 hour and 14 minute Extravehicular Activity (EVA) was completed successfully on day three, 16 minutes ahead of the planned schedule by Lu and Malenchenko. The spacewalk's objective focused on routing and connecting nine power, data and communications cables between the Zvezda module and the other Russian-built module, Zarya, as well as installing the six-foot-long magnetometer to the station to serve as a compass showing the station in respect to the Earth. Lu and Malenchenko used tethers and handrails along the ISS to make their way to a point more than 100 feet above the cargo bay, the farthest any tethered spacewalker has ventured outside the shuttle. They completed this with the assistance of their inside crewmates Burbank and Mastracchio who deftly maneuvered them around with the robotic arm. This spacewalk celebrates the sixth spacewalk in support of the station assembly and the 50th spacewalk in space shuttle history.

On flight day four the crew entered the International Space Station through Pressurized Mating Adapter-2 (PMA-2) to begin the transfer operations of more than three tons of hardware and supplies. Atlantis' crew was the first to see the interior of the Russian Zvezda service module since it was launched from the Baikonur Cosmodrome in July. Additionally, a reboost was performed using the orbiter's Reaction Control System (RCS) to place the station in a higher orbit.

Transfer of supplies and maintenance tasks continued well into the fifth day, while orbiter consumables remained above the required levels allowing managers to extend the mission one additional day.

Activities on flight day five included the installation of three batteries inside Zvezda. In order to reduce the weight for launch, Zvezda was launched with only five of its eight batteries in place.

Lu and Malenchenko spent much of flight day seven installing voltage and current stabilizers in Zvezda. Components of the Elektron system, equipment sent into orbit to separate water into oxygen and hydrogen, were installed and will be activated after the first crew arrives.

The crew transferred more than 6,000 pounds of material - including six 100 pound bags of water, all of the food for the first resident crew, office supplies, onboard environmental supplies, a vacuum cleaner and a computer and monitor - to the interior of the station.

The astronauts spent a total of 5 days, 9 hours and 21 minutes inside the station before closing the hatch on the orbiting outpost. Wilcutt and Altman commanded a series of four altitude boosts to place the station in an orbit of approximately 241 by 233 statute miles, raising the average altitude by 14 miles. After spending 7 days, 21 hours and 54 minutes linked to the station, Atlantis undocked at 11:46 p.m. EDT as Wilcutt and Altman fired Atlantis' jets to move to a distance of about 450 feet for a double-loop flyaround.

Statistics

99th Shuttle Mission
Atlantis OV-104 - 22nd Flight
KSC Landing 52

Milestones:
OPF -- 5/29/00 VAB -- 8/07/00 PAD -- 8/13/00

Payload: 4th Space Station Flight ISS-2A.2b (SPACEHAB/DM,ICC)

Mission Objectives:

Space Station assembly flight ISS-2A.2b utilized the SPACEHAB Double Module and the Integrated Cargo Carrier (ICC) to bring supplies to the station. The mission also included 2 spacewalks.

Hardware:

SRB: BI-102PF SRM: RSRM-75 ET : ET-103A MLP : SSME-1: SN-2052 SSME-2: SN-2044 SSME-3: SN-2047

Landing:

September 19, 2000 KSC 3:56 a.m. EDT KSC Runway 15

The deorbit burn to bring Atlantis in for a landing on runway 15 at Kennedy Space Center occurred on time at 2:50 a.m. EDT.

Main Gear Touchdown 3:56:48 a.m EDT (MET 11 days 19 hours 11 min 2 sec) Nose Gear Touchdown 3:56:57 a.m.EDT (MET 11 days 19 hours 11 min 11 sec) Wheel Stop 3:58:01 a.m.EDT (MET 11 days 19 hours 12 min 15 sec)


More at: STS-106.

Family: Manned spaceflight. People: Altman, Burbank, Lu, Malenchenko, Mastracchio, Morukov, Wilcutt. Country: USA. Spacecraft: Atlantis. Launch Sites: Cape Canaveral. Agency: NASA, NASA Houston.
Photo Gallery

STS-106STS-106
Credit: www.spacefacts.de



2000 August 6 - . 18:26 GMT - . Launch Site: Baikonur. Launch Complex: Baikonur LC1. LV Family: R-7. Launch Vehicle: Soyuz-U-PVB.
2000 September 8 - .
2000 September 8 - .
2000 September 8 - .
2000 September 8 - . 12:45 GMT - . Launch Site: Cape Canaveral. Launch Complex: Cape Canaveral LC39B. Launch Platform: MLP2. LV Family: Shuttle. Launch Vehicle: Space Shuttle.
2000 September 9 - .
2000 September 9 - .
2000 September 9 - .
2000 September 10 - .
2000 September 10 - .
2000 September 10 - .
2000 September 11 - .
2000 September 11 - .
2000 September 11 - .
2000 September 11 - . 04:47 GMT - .
2000 September 12 - .
2000 September 12 - .
2000 September 12 - .
2000 September 13 - .
2000 September 13 - .
2000 September 13 - .
2000 September 14 - .
2000 September 14 - .
2000 September 14 - .
2000 September 15 - .
2000 September 15 - .
2000 September 15 - .
2000 September 16 - .
2000 September 16 - .
2000 September 16 - .
2000 September 17 - .
2000 September 17 - .
2000 September 17 - .
2000 September 18 - .
2000 September 18 - .
2000 September 18 - .
2000 September 19 - .
2000 September 19 - .
2000 September 19 - .
2000 September 20 - .
2000 September 20 - .

Back to top of page
Home - Search - Browse - Alphabetic Index: 0- 1- 2- 3- 4- 5- 6- 7- 8- 9
A- B- C- D- E- F- G- H- I- J- K- L- M- N- O- P- Q- R- S- T- U- V- W- X- Y- Z
© 1997-2019 Mark Wade - Contact
© / Conditions for Use