Home - Search - Browse - Alphabetic Index: 0- 1- 2- 3- 4- 5- 6- 7- 8- 9
A- B- C- D- E- F- G- H- I- J- K- L- M- N- O- P- Q- R- S- T- U- V- W- X- Y- Z
STS-131A
Part of ISS
Venturestar/ISS
Venturestar docks to ISS, 1994 Concept. Lockheed-Martin's "Aeroballistic Rocket" spaceplane -- now called Venturestar -- docks with the Space Station. This 1994 illustration shows what the "Alpha" International Space Station would look like, without Russian modules.
Credit: NASA via Marcus Lindroos
Flight cancelled after the Columbia disaster. Would have flown ISS assembly mission ISS-14A. 4 SPP Arrays and the MMOD would have been delivered to the station.
AKA: ISS-14A. Launched: Spring 2006.
Spacecraft:
Space Shuttle.
Spring 2006 - .
- STS-131 (cancelled) - .
Nation: USA.
Agency: NASA.
Program: ISS.
Flight: STS-131A.
Spacecraft Bus: Shuttle.
Spacecraft: Atlantis.
Flight delayed after the Columbia disaster. No crew had been named at the time of the loss of Columbia. STS-131 was to have flown ISS assembly mission ISS-14A. 4 SPP Arrays and the MMOD would have been delivered to the station..
Back to top of page
Home - Search - Browse - Alphabetic Index: 0- 1- 2- 3- 4- 5- 6- 7- 8- 9
A- B- C- D- E- F- G- H- I- J- K- L- M- N- O- P- Q- R- S- T- U- V- W- X- Y- Z
© 1997-2019 Mark Wade - Contact
© / Conditions for Use