Mercury-Jupiter 2 (MJ-2)
Part of Mercury
Mercury
Mercury
Credit: Manufacturer Image
Planned manned Mercury long-range suborbital flights using the Jupiter IRBM as a booster. These were considered as an intermediary step in the Mercury program before use of the Jupiter booster in the program was cancelled in July 1959 on cost grounds.

AKA: MJ-2. Launched: End 1961. Number crew: 1 .

In the January 1959 Mercury program plan, flights of the capsule on a Jupiter IRBM were to take place in addition to flights atop the Redstone and Atlas boosters. The second Mercury-Jupiter flight was planned as a maximum dynamic pressure test to qualify a production Mercury capsule with a chimpanzee aboard. A human astronaut was considered briefly before the Mercury-Jupiter flights were cancelled in July 1959 on cost grounds. Mercury-Jupiter 2 was slated to fly in 1960. In the event the Mercury-Redstone flights were a year behind schedule and NASA moved on to the Mercury-Atlas flights in July 1961.



Spacecraft: Mercury.

First quarter 1960 - .

Back to top of page
Home - Search - Browse - Alphabetic Index: 0- 1- 2- 3- 4- 5- 6- 7- 8- 9
A- B- C- D- E- F- G- H- I- J- K- L- M- N- O- P- Q- R- S- T- U- V- W- X- Y- Z
© 1997-2019 Mark Wade - Contact
© / Conditions for Use