Home - Search - Browse - Alphabetic Index: 0- 1- 2- 3- 4- 5- 6- 7- 8- 9
A- B- C- D- E- F- G- H- I- J- K- L- M- N- O- P- Q- R- S- T- U- V- W- X- Y- Z
Crew Lander Reference Version 3
Part of American Mars Expeditions
DRM 3 Habitat
DRM 3 Habitat
Credit: NASA
American manned Mars lander. Study 1996. The second version of the NASA Crew Lander for the design reference mission would land the crew and a Mars surface habitat on the surface near the previously-landed cargo lander.

Status: Study 1996. Gross mass: 137,406 kg (302,928 lb).

The crew would have to use the ascent stage and return capsule of the cargo lander to get back to earth. A scrub of the estimated masses in the first design reduced the mass of the crew lander by a third, to 60,806 kg on approach to Mars and 35,145 kg on the surface.

Crew Lander Reference Version 3.0 Mass Summary

Habitat element 2: 28,505 kg
Life Support System: 4,661 kg
Health Care: 0 kg
Crew Accommodations: 12,058 kg
EVA equipment: 243 kg
Comm/info management: 320 kg
Power: 3,249 kg
Thermal: 550 kg
Structure: 5,500 kg
Spares: 1,924 kg
Crew: 500 kg
Unpressurized rover 3: 550 kg
EVA consumables: 446 kg
EVA suits: 940 kg
TOTAL PAYLOAD MASS: 30,941 kg

Vehicle structure: 3186 kg
Terminal propulsion system: 1018 kg
TOTAL LANDED MASS: 35,145 kg

Propellant: 11,381 kg
Forward Aeroshell: 13,580 kg
Parachutes and mechanisms: 700 kg
TOTAL ENTRY MASS: 60,806 kg

NTR Propulsion System: 23,400 kg
Shadow Shield: 3,200 kg
TMI Propellant: 50,000 kg
TOTAL INITIAL MASS: 137,406 kg



Family: Mars lander. Country: USA. Spacecraft: Design Reference Mission 3. Agency: NASA. Bibliography: 1987.

Back to top of page
Home - Search - Browse - Alphabetic Index: 0- 1- 2- 3- 4- 5- 6- 7- 8- 9
A- B- C- D- E- F- G- H- I- J- K- L- M- N- O- P- Q- R- S- T- U- V- W- X- Y- Z
© 1997-2019 Mark Wade - Contact
© / Conditions for Use