| Baikonur LC131 |
home
topic index |
|
|
LC131 Chronology 1965 July 17 - Launch Vehicle: UR-100. UR-100 229420-01 FAILURE: Failure. State trials missile test Agency: RVSN. Apogee: 0 km ( mi). 1965 July 31 - Launch Vehicle: UR-100. FAILURE: Failure. State trials missile test Agency: RVSN. Apogee: 0 km ( mi). 1965 September 17 - Launch Vehicle: UR-100. FAILURE: Failure. State trials missile test Agency: RVSN. Apogee: 0 km ( mi). 1990 November 20 - 04:00 GMT - Launch Vehicle: UR-100N. Rokot-K No. 1L Naryad-V Agency: VKS. Apogee: 900 km (550 mi). Noted as a suborbital test mission; but one Russian source indicates the payload was a Naryad-V satellite. That would indicate a failure to achieve orbit. No other information is available on the 'Naryad-V'. Contact us with any corrections, additions, or comments. Conditions for use of drawings, pictures, or other materials from this site.. To contact astronauts or cosmonauts. © Mark Wade, 1997 - 2008 except where otherwise noted. |
||