| Mercury-Jupiter 2 (MJ-2) |
home
topic index |
|
First quarter 1960. (Cancelled flight). Program: Mercury. In the January 1959 Mercury program plan, flights of the capsule on a Jupiter IRBM were to take place in addition to flights atop the Redstone and Atlas boosters. The second Mercury-Jupiter flight was planned as a maximum dynamic pressure test to qualify a production Mercury capsule with a chimpanzee aboard. A human astronaut was considered briefly before the Mercury-Jupiter flights were cancelled in July 1959 on cost grounds.
Mercury-Jupiter 2 (MJ-2) Chronology
Contact us with any corrections, additions, or comments. Conditions for use of drawings, pictures, or other materials from this site.. To contact astronauts or cosmonauts. © Mark Wade, 1997 - 2008 except where otherwise noted. |