ISS EO-16-1 home
topic index

Tani

23 October 2007 15:38 GMT. Landing Date: 2008-02-20 14:07:00 PM. Flight Time: 119.94 days. Flight Up: STS-120. Flight Back: STS-122. Crew: Tani. Program: ISS. Tani arrived aboard the ISS on STS-120 and stayed behind, joining the EO-16 crew, replacing NASA astronaut Clayton Anderson as the fifth long-duration rotating crew member aboard the station.


ISS EO-16-1 Chronology

  • 2007 Oct 23 - STS-120  Crew: Melroy, Zamka, Parazynski, Wheelock, Wilson, Nespoli, Tani. Spacecraft: Discovery. Payload: Discovery F33 / Harmony / ISS-10A. Launch Site: Cape Canaveral. Launch Vehicle: Shuttle. Duration: 15.10 days. Perigee: 340 km (210 mi). Apogee: 344 km (213 mi). Inclination: 51.60 deg. Period: 91.40 min.

    Main mission objectives were delivery of the Harmony module to the station, and external work to move the P6 truss to its final location and put the ISS into its full-power configuration for the first time. Discovery docked with the ISS at the Destiny module at 12:40 GMT on 25 October. The cargo of 17,390 kg was as follows:

    • Orbiter Docking System - Bay 1-2 - 1800 kg
    • Spacesuit EMU 3004 - 130 kg
    • Spacesuit EMU 3003 - 130 kg
    • Station Power Distribution Unit SPDU - Bay 3P - 100 kg
    • Fixture for return of S-band Antenna - SASA FSE - Bay 3P - 4S - 100 kg
    • Power/Data Grapple Fixture for Node-2 - PDGF - Bay 5P - 50 kg
    • Main Bus Switching Unit - MBSU - Bay 6S - 238 kg
    • MBSU adapter - Bay 6S - 122 kg
    • Station Power Distribution Unit - SPDU - Bay 6S - 7P - 100 kg
    • Node-2 Harmony module - Bays 8-12 - 14,300 kg
    • OBSS 203 - Sill 450 kg
    • RMS 301 - Sill 410 kg
  • 2007 Oct 26 - EVA STS-120-1  Crew: Parazynski, Wheelock. EVA Type: Extra-Vehicular Activity. EVA Duration: 0.25 days.

    The astronauts emerged from the Quest hatch at 10:01 GMT. They moved an antenna from the Z1 truss and stowed it in the payload bay, prepared the P6 truss for separation from Z1, and assisted in installation of the Harmony module, which was unberthed from the shuttle bay by the ISS Canadarm-2 and docked to the Unity module.

  • 2007 Oct 28 - EVA STS-120-2  Crew: Parazynski, Tani. EVA Type: Extra-Vehicular Activity. EVA Duration: 0.27 days.

    The astronauts emerged from the Quest hatch at 09:32 GMT. They assisted in unberthing of the P6 truss and its placement in a parked position. They also installed handrails and a grapple fixture on Harmony and inspected the malfunctioning Solar Array Rotary Joint (SARJ) on the S3/S4 truss.

  • 2007 Oct 30 - EVA STS-120-3  Crew: Parazynski, Wheelock. EVA Type: Extra-Vehicular Activity. EVA Duration: 0.29 days.

    The astronauts emerged from the Quest hatch at 08:44 GMT. They assisted in the mating of the P6 to P5 trusses and deployment of a radiator from P6. Wheelock transferred a spare Main Bus Switching Unit (MBSU) from the Shuttle bay to the External Stowage Platform 3 (ESP3). P6 solar array wing 2B was successfully redeployed; but deployment of array 4B had to be halted when a tear developed in the solar panel.

  • 2007 Nov 3 - EVA STS-120-4  Crew: Parazynski, Wheelock. EVA Type: Extra-Vehicular Activity. EVA Duration: 0.30 days.

    The astronauts emerged from the Quest hatch and rode the ISS Canadarm II 50 m out to the snagged P6 solar array. Parazynski cut a snagged wire and installed homemade stabilizers designed to strengthen the array’s structure and stability in the vicinity of the damage. Wheelock helped from the truss by keeping an eye on the distance between Parazynski and the array. Afterwards they observed as ground controllers completed successful extension of the array.

  • 2007 Nov 9 - EVA ISS EO-16-1  Crew: Whitson, Malenchenko. EVA Type: Extra-Vehicular Activity. EVA Duration: 0.29 days.

    The astronauts conducted exterior work in preparation for the move of the Pressurized Mating Adapter 2 (PMA-2) from the Destiny lab and to the Harmony module. They disconnected and stowed cables, removed a light on one of the station’s transport carts and took the cover off Harmony's Common Berthing Mechanism. They also removed a base-band signal processor for later refurbishment; removed a remote power controller module that was to be replaced; and transferred tools in preparation for upcoming spacewalks.

  • 2007 Nov 15 - ISS On-Orbit Status 11/15/07 

    Malenchenko and Whitson undertook the standard 30-min Shuttle RPM (R-bar Pitch Maneuver) skill training.

    After wakeup and before breakfast, FE-2 Dan Tani again accessed the SLEEP experiment (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) software for data logging and completing questionnaire entries in the experiment's laptop session file on the HRF-1 laptop for later downlink. (To monitor the crewmember's sleep/wake patterns and light exposure, Peggy and Dan wear a special Actiwatch device which measures the light levels encountered by them as well as their patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.) Additional Details: ISS On-Orbit Status 11/15/07.

  • 2007 Nov 17 - ISS On-Orbit Status 11/17/07 

    Saturday -- off-duty day for CDR Whitson, FE-1 Malenchenko and FE-2 Tani except for housekeeping and voluntary work.

    After setting up the video camera gear for covering their CEVIS cycle ergometer workout, Peggy Whitson and Dan Tani activated the OUM-PFE (Oxygen Uptake Measurement - Periodic Fitness Evaluation) equipment at the HRF-2 (Human Research Facility 2) rack, including the HRF PFM/PAM (Pulmonary Function Module/Photoacoustic Analyzer Module), Mixing Bag System and GDS (Gas Delivery System). Both crewmembers then completed the evaluation protocol, wearing HRMs (Heart Rate Monitors), with each one in turn acting as subject and operator, obtaining measurements on themselves on the CEVIS cycle ergometer. (The operations were documented with photo and video. Later, Peggy and Dan updated the evaluation protocol, deactivated & stowed the gear, including photo/video equipment, and powered down the OUM-PFE laptop. Purpose of OUM-PFE is to measure aerobic capacity during exercise within 14 days after arrival on ISS, and once monthly during routine PFEs. The data allows exercise physiologists & flight doctors to assess the crew's health & fitness and to provide data for modifying & updating crew-specific exercise regimes. PFE-OUM is a collaborative effort between NASA and ESA (European Space Agency).) Additional Details: ISS On-Orbit Status 11/17/07.

  • 2007 Nov 19 - ISS On-Orbit Status 11/19/07 

    Underway: Week 5 of Increment 16.

    Before breakfast, CDR Peggy Whitson & FE-2 Dan Tani accessed the SLEEP experiment (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) software for data logging, completing questionnaire entries in the experiment's laptop session file on the HRF-1 laptop for later downlink. (To monitor the crewmember's sleep/wake patterns and light exposure, Peggy and Dan wear a special Actiwatch device which measures the light levels encountered by them as well as their patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, currently as part of the crew's discretionary 'job jar' task list.) Additional Details: ISS On-Orbit Status 11/19/07.

  • 2007 Nov 21 - ISS On-Orbit Status 11/21/07 

    FE-1 Yuri Malenchenko started his workday with Part 1 of a software test of the Russian data telemetry system's MKO multiplex exchange channel, via BSR-TM payload data telemetry and the 4PrNP-6 data gathering application of the BITS2-12 Onboard Telemetry Measurement System.

    (The test, using the RSS2 laptop, consisted of switching from the regular 128-byte TM frame to a 206-byte format, for the ground to run tests overnight from RGS (Russian Ground Sites). Tomorrow, in part 2 the FE-1 will reconfigure the BSR-TM back to 128-byte format.)

    Afterwards, Malenchenko recorded the post-EVA radiation readings from the Russian EMU-worn plus one background 'Pille-MKS' dosimeters in a log table for subsequent downlink to the ground.

    Starting preparations of their next spacewalk, EVA-12 'Charlie' on 11/24 (Saturday), CDR Whitson and FE-2 Tani - Additional Details: ISS On-Orbit Status 11/21/07.

  • 2007 Nov 22 - ISS On-Orbit Status 11/22/07 

    Happy Thanksgiving on Earth and in Heaven (and in between)!

    CDR Whitson & FE-1 Malenchenko started off on today's light-duty schedule with another standard 30-min Shuttle RPM (R-bar Pitch Maneuver) skill training, Peggy's third, Yuri's fourth, using DCS-760 digital still cameras with 400 & 800mm lenses at Service Module (SM) windows 6 & 8 to take imagery of documented EO (Earth Observation) targets facing the velocity vector (in flight direction). Afterwards, Peggy downlinked the obtained images to the ground for analysis, to be discussed at a subsequent tagup. (The skill training prepares crewmembers for the bottomside mapping of the Orbiter at the arrival of STS-122/1E in December. During the RPM at ~600 ft from the station, the ISS crew will have only ~90 seconds for taking high-resolution digital photographs of all tile areas and door seals on the Atlantis from SM windows 6 & 8, to be downlinked for launch debris assessment. Thus, time available for the shooting will be very limited, requiring great coordination between the two headset-equipped photographers and the Shuttle.) Additional Details: ISS On-Orbit Status 11/22/07.

  • 2007 Nov 23 - ISS On-Orbit Status 11/23/07 

    FE-1 Yuri Malenchenko performed Part 2 of the ground-controlled test of the Russian data telemetry system's MKO multiplex exchange channel, using BSR-TM payload data telemetry (TM) and the 4PrNP-6 data gathering application of the BITS2-12 Onboard Telemetry Measurement System.

    (The test, controlled from the RSS2 laptop, began 11/21 with Yuri switching from the regular 128-byte TM frame to a 206-byte format, for TsUP to run tests from RGS (Russian Ground Sites). Today, in Part 2 as per plan the FE-1 returned the BSR-TM to the nominal 128-byte format.)

    Malenchenko also transferred measurements & imagery from the ESA/RSC-Energia experiment ALTCRISS (Alteino Long Term monitoring of Cosmic Rays on the ISS) to OCA for subsequent downlink to the ground, after yesterday's first repositioning of the spectrometer. (ALTCRISS uses the AST spectrometer to monitor space radiation in the Russian segment (RS).) Additional Details: ISS On-Orbit Status 11/23/07.

  • 2007 Nov 24 - ISS On-Orbit Status 11/24/07 

    Saturday -- Stage EVA day for CDR Whitson, FE-1 Malenchenko, FE-2 Tani.

    Node-2 Harmony is ready to accept Columbus!

    EVA-12 'Charlie' was completed fully successfully in 7 hrs 4 min, accomplishing all objectives & get-ahead tasks.
    As a consequence, Node-2 Harmony was fully activated by the ground, one day earlier than originally planned, enabling interior activations by the crew tomorrow.

    During the spacewalk, CDR Peggy Whitson (EV1) and FE-2 Dan Tani (EV2), supported by FE-1 Yuri Malenchenko as intravehicular (IV) crewmember, connected and configured the second half of the Node-2 fluid, power, and cooling jumpers (the first half was accomplished on EVA-11 'Bravo' on 11/20).
    Specifically, the spacewalkers - Additional Details: ISS On-Orbit Status 11/24/07.

  • 2007 Nov 25 - ISS On-Orbit Status 11/25/07 

    Sunday -- light-duty day for CDR Whitson, FE-1 Malenchenko and FE-2 Tani.

    Ahead: Week 6 of Increment 16.

    The FE-1 started his day by recording post-EVA radiation readings from the Russian 'Pille-MKS' dosimeters in the two spacesuits worn by Whitson & Tani during yesterday's spacewalk and from one background dosimeter. Measurements were logged in a table for subsequent downlink to the ground.

    In the SM (Service Module), Malenchenko afterwards activated the Kenwood D700 amateur radio station and started the program for the Russian SHADOW-BEACON (Tenj-Mayak) experiment. (Objective of the experiment is the automatic retranslation of time tag (pre-planned executable) packets from ground stations. SHADOW (or ECLIPSE), sponsored by Roskosmos and its leading Moscow research organization TSNIIMASH (Central Research Institute of Machine Building), employs VHF amateur radio (ham) operators around the globe (via ARISS/Amateur Radio on ISS) to help in observing refraction/scattering effects in artificial plasmas using the method of RF (radio frequency) sounding in space experiments under different geophysical conditions. This is the experiment's second run, after Flight Engineer Mikhail Tyurin conducted it first on Expedition 14 in November 2006.) Additional Details: ISS On-Orbit Status 11/25/07.

  • 2007 Nov 26 - ISS On-Orbit Status 11/26/07 

    All ISS systems continue to function nominally, except those noted previously or below.

    ff-duty day for CDR Whitson, FE-1 Malenchenko and FE-2 Tani. Underway: Week 6 of Increment 16. Having passed the Day 30 mark in her flight, CDR-16 Whitson began her second session with the NASA/JSC experiment NUTRITION w/Repository, for which she had to forego exercising and food intake for eight hours. (After collecting an initial urine sample, Whitson, assisted by Dan Tani, followed it with phlebotomy, i.e., drawing blood samples (from an arm vein) which she first allowed to coagulate in the Repository, then spun in the HRF RC (Human Research Facility/Refrigerated Centrifuge) and finally placed in MELFI (Minus-Eighty Laboratory Freezer for ISS). The RC was later powered off after a temperature reset to limit wear on the compressor, and cleaned (see RC troubleshooting, below). The equipment was then stowed. NUTRITION activities today included the required 24-hour data urine collection by Whitson, by securing samples during the day, all stored immediately in MELFI. The Clinical Nutritional Assessment profile currently required on all U.S. Astronauts collects blood and urine samples preflight and postflight. NUTRITION expands this protocol by also capturing inflight samples and an additional postflight sample. Furthermore, additional measurements are included for samples from all sessions, including additional markers of bone metabolism, vitamin status, and hormone and oxidative stressor tests. The results will be used to better understand the impact of countermeasures (exercise and pharmaceuticals) on nutritional status and nutrient requirements. The Clinical Nutritional Assessment profile (MR016L), first started on two Mir crewmembers and then on all ISS US crews, nominally consists of two pre-flight and one post-flight analysis of nutritional status, as well as an in-flight assessment of dietary intake using the FFQ (Food Frequency Questionnaire). The current NUTRITION project expands MR016L testing in three ways: Addition of in-flight blood & urine collection (made possible by MELFI), normative markers of nutritional assessment, and a return session plus 30-day (R+30) session to allow evaluation of post-flight nutrition and implications for rehabilitation.) Additional Details: ISS On-Orbit Status 11/26/07.

  • 2007 Nov 28 - ISS On-Orbit Status 11/28/07 

    FE-2 Dan Tani continued servicing the CSLM-2 (Coarsening in Solid-Liquid Mixtures 2) experiment on its second session.

    (The FE-2 configured the hardware to allow the ground to perform ground commanding to the MLC (Microgravity Science Glovebox Laptop Computer) for diagnostic testing and to develop recovery steps for the ECU (Electronic Control Unit) to be reprogrammed correctly.)

    FE-1 Yuri Malenchenko performed a thorough 2-hr. troubleshooting inspection & verification of the connections of the Russian segment's Onboard Cabling System (BKS) to the FGB's Thermal Control System (SOTR). (Using the Nikon D200 digital camera, Yuri documented the SOTR layout behind panel 215 and checked connector pins for dirt or misalignment.) Additional Details: ISS On-Orbit Status 11/28/07.

  • 2007 Dec 2 - ISS On-Orbit Status 12/02/07 

    Sunday -- off-duty day for CDR Whitson, FE-1 Malenchenko and FE-2 Tani.

    Ahead: Week 7 of Increment 16.

    FE-1 Malenchenko supported his first experiment session with the Russian TEKh-20 Plasma Crystal-3+ (Plazmennyi-Kristall/PK-3+) payload by activating the turbopump in the Service Module (SM)'s Transfer Compartment (PkhO) for keeping the vacuum chamber (ZB) in the SM Work Compartment (RO) evacuated. The turbopump will be deactivated tonight at ~4:25pm EST. (Main objective of PK-3 is to study dust plasma wave propagation and dispersion ratio at a specified power of HF discharge, pressure, and a varied number of particles.) Additional Details: ISS On-Orbit Status 12/02/07.

  • 2007 Dec 4 - ISS On-Orbit Status 12/04/07 

    FE-1 Malenchenko supported the Russian TEKh-20 Plazmennyi-Kristall/PK-3+ (Plasma Crystal-3+) experiment on its fifth day.

    After wakeup and before breakfast, FE-2 Dan Tani accessed the SLEEP experiment (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) software for data logging, completing questionnaire entries in the experiment's laptop session file on the HRF-1 laptop for later downlink. (To monitor the crewmember's sleep/wake patterns and light exposure, Dan wears a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.) Additional Details: ISS On-Orbit Status 12/04/07.

  • 2007 Dec 5 - ISS On-Orbit Status 12/05/07 

    FE-1 Malenchenko supported the Russian TEKh-20 Plazmennyi-Kristall/PK-3+ (Plasma Crystal-3+) experiment on its sixth day.

    After wakeup and before breakfast, FE-2 Dan Tani accessed the SLEEP experiment (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) software for data logging, completing questionnaire entries in the experiment's laptop session file on the HRF-1 laptop for later downlink. (To monitor the crewmember's sleep/wake patterns and light exposure, Dan wears a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.) Additional Details: ISS On-Orbit Status 12/05/07.

  • 2007 Dec 6 - ISS On-Orbit Status 12/06/07 

    Today's launch of STS-122/Atlantis on Mission ISS-1E was postponed due to failure indications of two (of four) engine cut-off sensors in the Liquid Hydrogen tank during early-morning tanking operations.

    The next liftoff opportunity is tomorrow, Friday, at 4:09pm EST.

    Aboard the space station, FE-2 Dan Tani again accessed the SLEEP experiment (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) software after wakeup and before breakfast, for data logging, completing questionnaire entries in the experiment's laptop session file on the HRF-1 laptop for later downlink. (To monitor the crewmember's sleep/wake patterns and light exposure, Dan wears a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.) Additional Details: ISS On-Orbit Status 12/06/07.

  • 2007 Dec 7 - ISS On-Orbit Status 12/07/07 

    After yesterday's launch scrub for STS-122/Atlantis/Mission ISS-1E due to failure indications of two (of four) engine cut-off sensors in the LH2 tank, the Shuttle is now in a 48-hour turnaround to protect for launch no earlier than Saturday, at 3:43pm EST.

    Aboard the space station, FE-2 Dan Tani again accessed the SLEEP experiment (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) software after wakeup and before breakfast, for data logging, completing questionnaire entries in the experiment's laptop session file on the HRF-1 laptop for later downlink. (To monitor the crewmember's sleep/wake patterns and light exposure, Dan wears a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.) Additional Details: ISS On-Orbit Status 12/07/07.

  • 2007 Dec 8 - ISS On-Orbit Status 12/08/07 

    Saturday -- off-duty day for CDR Whitson, FE-1 Malenchenko and FE-2 Tani except for housekeeping and voluntary work.

    The delayed launch of STS-122/Atlantis/Mission ISS-1E has tentatively been rescheduled for tomorrow, Sunday (12/9) at 3:21pm EST, assuming no major problems turn up in engineering reviews taking place today. Weather forecast for 12/9 predicts an 80 percent chance of good weather.

    Aboard the space station, FE-2 Dan Tani again accessed the SLEEP experiment (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) software after wakeup and before breakfast, for data logging, completing questionnaire entries in the experiment's laptop session file on the HRF-1 laptop for later downlink. (To monitor the crewmember's sleep/wake patterns and light exposure, Dan wears a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.) Additional Details: ISS On-Orbit Status 12/08/07.

  • 2007 Dec 9 - ISS On-Orbit Status 12/09/07 

    Sunday -- off-duty day for CDR Whitson, FE-1 Malenchenko and FE-2 Tani.

    Ahead: Week 8 of Increment 16.

    The launch of STS-122/Atlantis/Mission ISS-1E has now been targeted for not earlier than 1/2/08 for additional troubleshooting of the four LH2 low level cutoff sensors (after the #3 sensor again failed this morning during another tanking attempt).

    Aboard the space station, FE-2 Dan Tani again accessed the SLEEP experiment (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) software after wakeup and before breakfast, for data logging, completing questionnaire entries in the experiment's laptop session file on the HRF-1 laptop for later downlink. (To monitor the crewmember's sleep/wake patterns and light exposure, Dan wears a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.)

    The FE-2 later conducted inflight maintenance on the Node-2 ITCS (Internal Thermal Control System)'s MTL (Moderate Temperature Loop) by adjusting its fluid sampling adapter metering valve and then taking another fluid sample for return to the ground and one for OPA (Ortho-Phthalaldehyde) testing.. Afterwards, Dan repeated the sampling process on the LTL (Low Temperature Loop) side of the Node-2 ITCS. (OPA, an antimicrobial agent, was introduced into the Lab ITCS coolant by the AmiA (Antimicrobial Applicator).)

    FE-1 Malenchenko performed monthly maintenance on the Russian IK0501 GA (gas analyzer) of the SOGS Pressure Control & Atmospheric Monitoring System, deactivating the unit and replacing its CO2 filter assembly (BF) with a new unit from FGB stowage (replaced last: 10/29). (After ensuring good seals on the instrument's base and no leaks around the installed filter, Yuri reactivated the GA and stowed the spent BF for disposal. IK0501 is an automated system for measuring CO2, O2, and H2O in the air as well as the flow rate of the gas being analyzed.)

    CDR Whitson completed the periodic offloading of the Lab CCAA (Common Cabin Air Assembly) dehumidifier's condensate tank, filling CWC (Contingency Water Container) #1062 with the collected water slated for processing, and putting aside two water samples in sample bags for analysis. (Estimated offload time before termination (leaving ~6 kg in the tank): ~20 min.)

    The crewmembers conducted their regular 2.5-hr. physical workout program (about half of which is used for setup & post-exercise personal hygiene) on the TVIS treadmill (CDR, FE-1, FE-2), RED resistive exerciser (CDR, FE-2) and VELO bike with bungee cord load trainer (FE-1).

    Job items on Peggy's and Dan's discretionary 'job jar' task list today were -

    Removal of panel fasteners in Node-2 to provide temporary access to the AR SDS (Atmosphere Revitalization/Sample Delivery System). (The SDS, along with the MCA (Major Constituents Analyzer), PCA (Pressure Control Assembly), TCCS (Trace Contaminant Control Subassembly) and CVV (Carbon Dioxide Vent Valve assembly), is a subsystem of the Atmosphere Control & Supply System of the Lab's ECLSS (Environment Control & Life Support System));
    Lubrication of TVIS treadmill SPDs (Subject Positioning Devices); and
    Monthly battery check and rebooting of the PCS (Portable Computer System) A31p laptops.
    No CEO photo targets uplinked for today.

  • 2007 Dec 11 - ISS On-Orbit Status 12/11/07 

    FE-1 Yuri Malenchenko underwent the periodic (generally monthly) health test with the cardiological experiment PZEh MO-1 ('Study of the Bioelectric Activity of the Heart at Rest') on the TVIS (Treadmill with Vibration Isolation System).

    FE-2 Dan Tani again accessed the SLEEP experiment (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) software after wakeup and before breakfast, for data logging, completing questionnaire entries in the experiment's laptop session file on the HRF-1 laptop for later downlink. (To monitor the crewmember's sleep/wake patterns and light exposure, Dan wears a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.) Additional Details: ISS On-Orbit Status 12/11/07.

  • 2007 Dec 12 - ISS On-Orbit Status 12/12/07 

    Dan Tani continued his work on the MSG (Microgravity Science Glovebox) facility.

    After wakeup and before breakfast, FE-2 Dan Tani again accessed the SLEEP experiment (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) software for data logging and completing questionnaire entries in the experiment's laptop session file on the HRF-1 laptop for later downlink. (To monitor the crewmember's sleep/wake patterns and light exposure, Dan wears a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.) Additional Details: ISS On-Orbit Status 12/12/07.

  • 2007 Dec 13 - ISS On-Orbit Status 12/13/07 

    Malenchenko and Whitson, assisting each other in turn, conducted a session with the biomedical protocol KARDIO-ODNT (MBI-5) in the "Chibis" garment.

    After wakeup and before breakfast, FE-2 Dan Tani again accessed the SLEEP experiment (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) software for data logging and completing questionnaire entries in the experiment's laptop session file on the HRF-1 laptop for later downlink. (To monitor the crewmember's sleep/wake patterns and light exposure, Dan wears a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.) Additional Details: ISS On-Orbit Status 12/13/07.

  • 2007 Dec 15 - ISS On-Orbit Status 12/15/07 

    Saturday -- off-duty day for CDR Whitson, FE-1 Malenchenko and FE-2 Tani except for housekeeping and voluntary work.

    After wakeup and before breakfast, FE-2 Dan Tani again accessed the SLEEP experiment (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) software for data logging and completing questionnaire entries in the experiment's laptop session file on the HRF-1 laptop for later downlink. (To monitor the crewmember's sleep/wake patterns and light exposure, Dan wears a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.) Additional Details: ISS On-Orbit Status 12/15/07.

  • 2007 Dec 16 - ISS On-Orbit Status 12/16/07 

    Sunday - EVA preparation day 1 for CDR Whitson, FE-1 Malenchenko and FE-2 Tani.

    Ahead: Week 9 of Increment 16.

    After wakeup and before breakfast, FE-2 Dan Tani again accessed the SLEEP experiment (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) software for data logging and completing questionnaire entries in the experiment's laptop session file on the HRF-1 laptop for later downlink. (To monitor the crewmember's sleep/wake patterns and light exposure, Dan wears a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.) Additional Details: ISS On-Orbit Status 12/16/07.

  • 2007 Dec 18 - ISS On-Orbit Status 12/18/07 

    EVA-13 by CDR Peggy Whitson and FE-2 Dan Tani was completed successfully in 6h 56m, accomplishing its objectives.

    During the spacewalk, Tani (EV1) & Whitson (EV2), supported by FE-1 Yuri Malenchenko as intravehicular (IV) crewmember, inspected the Stbd (right-side) 1A BGA (Beta Gimbal Assembly) and BMRMM (Bearing Motor Roll Ring Module), followed by a detailed investigation and photo documentation of the Stbd SARJ (Solar Alpha Rotary Joint).
    Specifically, the spacewalkers -

    Found no obvious signs of external damage on cables or hardware of the BGA & BMRMM that might have caused the repeated tripping of circuit breakers (RPCs/Remote Power Controllers), making it more likely that the issue is internal to the hardware or its electrical system;
    Entered into the S5 truss to disconnect some wiring to allow the ground to perform diagnostic continuity tests, and later reconnected the cables;
    Temporarily removed 22 protective MLI (Multi-Layer Insulation) covers to inspect the SARJ, its two DLAs (Drive Lock Assemblies), and its 12 TBAs (Trundle Bearing Assemblies), reattaching the covers afterwards,
    Found most metal shavings around TBA-4 and TBA-5, i.e., metallic, magnetic contamination on the main gear bearing's outboard angled race ring as well as pitting and abrasions on the ring but no obvious damage on the inboard race ring or on the gear teeth themselves. DLA (Drive Lock Assembly) #2 appeared especially 'ugly', i.e., filled with contamination, and, according to the spacewalkers, the further away from the DLA, the less contamination was observed;
    Took photographs, measured the depth of surface pits with a special probe and collected debris samples; and
    Deinstalled and removed TBA-5 from its housing under cover #20, using a PGT (Pistol Grip Tool), then brought it inside in a bag for eventual return to Earth aboard STS-122/Atlantis (SARJ can function OK on only 11 TBAs).
    (Official start time of the spacewalk was 4:50am EST, 70 minutes ahead of the timeline, ending at 11:46am. Total EVA duration (PET = Phase Elapsed Time) was 6h 56min. It was the 100th spacewalk for ISS assembly & maintenance and the 72nd from the station (28 from Shuttle, 50 from Quest, 22 from Pirs) totaling 436h 3m, and the 4th for Expedition 16 (totaling 28h 11m. During the spacewalk, her fifth, Peggy Whitson set a new record of aggregated EVA time by a woman (of 32h 36m) when she exceeded the 29h 18m held by Sunita Williams. After today's EVA, a total of 121 spacewalkers (90 NASA astronauts, 21 Russians, and ten astronauts representing Japan-1, Canada-4, France-1, Germany-1 and Sweden-3) have logged a total of 624h 25m outside the station on building, outfitting and servicing. It was also the 122nd spacewalk by U.S. astronauts. The 100th EVA dedicated to ISS assembly & maintenance originally was to have been conducted by Rex Walheim & Hans Schlegel of the delayed STS-122/1E mission.) Additional Details: ISS On-Orbit Status 12/18/07.

  • 2007 Dec 19 - ISS On-Orbit Status 12/19/07 

    Today at ~5:30am EST, the ISS, specifically its FGB module, completed 52,000 orbits of the Earth, having covered a distance of 2.

    billion kilometers (1.37 billion st.miles) in 3316 days. The 19,300 kg (42,600 lbs) Zarya ('Dawn') was launched on a Russian/Khrunichev Proton from Baikonur over nine years ago (11/20/1998) as the first element of the multi-national space station.<<<<

    After wakeup and before breakfast, FE-2 Dan Tani again accessed the SLEEP experiment (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) software for data logging and completing questionnaire entries in the experiment's laptop session file on the HRF-1 laptop for later downlink. (To monitor the crewmember's sleep/wake patterns and light exposure, Dan wears a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.) Additional Details: ISS On-Orbit Status 12/19/07.

  • 2007 Dec 20 - ISS On-Orbit Status 12/20/07 

    In preparation for the arrival of Progress M-62/27P on 12/26 (~3:25am EST), FE-1 Malenchenko and CDR Whitson successfully conducted the standard 3-hr. training course on the TORU teleoperated control system.

    After wakeup and before breakfast, FE-2 Dan Tani again accessed the SLEEP experiment (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) software for data logging and completing questionnaire entries in the experiment's laptop session file on the HRF-1 laptop for later downlink. (To monitor the crewmember's sleep/wake patterns and light exposure, Dan wears a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.) Additional Details: ISS On-Orbit Status 12/20/07.

  • 2007 Dec 21 - ISS On-Orbit Status 12/21/07 

    Having passed the Day 60 mark in her flight, Dr. Peggy Whitson began her third session with the NASA/JSC experiment NUTRITION w/Repository, for which she had to forego exercising and food intake for eight hours.

    After wakeup and before breakfast, FE-2 Dan Tani again accessed the SLEEP experiment (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) software for data logging and completing questionnaire entries in the experiment's laptop session file on the HRF-1 laptop for later downlink. (To monitor the crewmember's sleep/wake patterns and light exposure, Dan wears a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.) Additional Details: ISS On-Orbit Status 12/21/07.

  • 2007 Dec 22 - ISS On-Orbit Status 12/22/07 

    Saturday -- off-duty day for CDR Whitson, FE-1 Malenchenko and FE-2 Tani except for housekeeping and voluntary work.

    Happy 46th Birthday, Yuri Ivanovich!

    Last night, Progress M-61/26P successfully undocked from the ISS at 10:59pm EST (hook opening command: 10:57pm). The separation appeared smooth with no vibrations noted. Downlinked video from the cargo vehicle showed that the docking ring surface was nominal. The first separation burn was performed at 11:03pm and a second separation burn followed at 11:09pm. The spacecraft initially moved aft of the station, then forward, overtaking the ISS on a lower (faster) orbit. 26P will remain in orbit in free flight for 3-4 weeks, continuing to phase out in front of the ISS (about 40 km per orbit) as part of a Russian Earth observation experiment. Additional Details: ISS On-Orbit Status 12/22/07.

  • 2007 Dec 23 - ISS On-Orbit Status 12/23/07 

    Sunday - off-duty day for CDR Whitson, FE-1 Malenchenko and FE-2 Tani.

    Ahead: Week 10 of Increment 16.

    With the usual dependability, Progress M-62/27P launched nominally this morning at Baikonur at 2:12am EST. Orbit insertion and 3rd stage separation were nominal at ~2:21:30am. Critical antennae and solar array deployments took place without issue. Docking is scheduled on Wednesday, 12/26 (~3:25am EST). Congrats, Baikonur!

    Before breakfast, FE-2 Dan Tani and CDR Peggy Whitson completed their daily access of the SLEEP experiment (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) software for data logging and filling in questionnaire entries in the experiment's laptop session file on the HRF-1 laptop for downlink. (To monitor the crewmembers' sleep/wake patterns and light exposure, Dan and Peggy wear a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.) Additional Details: ISS On-Orbit Status 12/23/07.

  • 2007 Dec 24 - ISS On-Orbit Status 12/24/07 

    Underway: Week 10 of Increment 16.

    Merry Christmas and Great Holidays to everyone!

    Progress M-62/27P is continuing its 3-day flight to the ISS for docking Wednesday morning (12/26) at ~3:25am EST at the DC1 nadir port. All onboard tests (TV, KURS, TORU), performed today during RGS (Russian ground site) passes, were without issues.

    Before breakfast, FE-2 Dan Tani and CDR Peggy Whitson completed their daily access of the SLEEP experiment (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) software for data logging and filling in questionnaire entries in the experiment's laptop session file on the HRF-1 laptop for downlink. (To monitor the crewmembers' sleep/wake patterns and light exposure, Dan and Peggy wear a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.) Additional Details: ISS On-Orbit Status 12/24/07.

  • 2007 Dec 27 - ISS On-Orbit Status 12/27/07 

    Before breakfast and first exercise, Whitson, Malenchenko and Tani completed a full session with the Russian crew health monitoring program's medical assessment MO-9/Biochemical Urinalysis.

    After wakeup and before breakfast, FE-2 Dan Tani again accessed the SLEEP experiment (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) software for data logging and completing questionnaire entries in the experiment's laptop session file on the HRF-1 laptop for later downlink. (To monitor the crewmembers' sleep/wake patterns and light exposure, Dan and Peggy wear a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.) Additional Details: ISS On-Orbit Status 12/27/07.

  • 2007 Dec 28 - ISS On-Orbit Status 12/28/07 

    CDR Whitson and FE-2 Tani began the day with the daily reading of SLEEP (Sleep-Wake Actigraphy and Light Exposure during Spaceflight) experiment data accumulated during the night, for logging and filling in questionnaire entries in the experiment's session file on the HRF-1 laptop for downlink.

    (To monitor the crewmembers' sleep/wake patterns and light exposure, Dan and Peggy wear a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.)

    Upon wakeup, FE-1 Yuri Malenchenko terminated his fifth MBI-12 SONOKARD experiment session, started last night, by taking the recording device from his SONOKARD sports shirt pocket and later copying the measurements to the RSE-MED laptop for subsequent downlink to the ground. (SONOKARD objectives are stated to (1) study the feasibility of obtaining the maximum of data through computer processing of records obtained overnight, (2) systematically record the crewmember's physiological functions during sleep, (3) study the feasibility of obtaining real-time crew health data. Investigators believe that contactless acquisition of cardiorespiratory data over the night period could serve as a basis for developing efficient criteria for evaluating and predicting adaptive capability of human body in long-duration space flight.) Additional Details: ISS On-Orbit Status 12/28/07.

  • 2007 Dec 29 - ISS On-Orbit Status 12/29/07 

    Saturday -- off-duty day for CDR Whitson, FE-1 Malenchenko and FE-2 Tani except for housekeeping and voluntary work.

    Whitson and Tani began the day with the daily reading of SLEEP (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) experiment data accumulated during the night, for logging and filling in questionnaire entries in the experiment's session file on the HRF-1 laptop for downlink. (To monitor the crewmembers' sleep/wake patterns and light exposure, Dan and Peggy wear a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.) Additional Details: ISS On-Orbit Status 12/29/07.

  • 2007 Dec 31 - ISS On-Orbit Status 12/31/07 

    New Year's Eve....16 times for the Expedition 16 crew of CDR Peggy Whitson, FE-1 Yuri Malenchenko and FE-2 Dan Tani while counting down to 2008!

    Crew off-duty day. Underway: Week 11 of Increment 16.

    Peggy and Dan began the day with the daily reading of SLEEP (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) experiment data accumulated during the night, for logging and filling in questionnaire entries in the experiment 's session file on the HRF-1 laptop for downlink. (To monitor the crewmembers ' sleep/wake patterns and light exposure, Dan and Peggy wear a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew 's discretionary 'job jar' task list.) Additional Details: ISS On-Orbit Status 12/31/07.

  • 2008 Jan 1 - ISS On-Orbit Status 01/01/08 

    Happy New Year! Crew off-duty day (of course!).

    Peggy and Dan began the New Year with the daily reading of SLEEP (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) experiment data accumulated during the night, for logging and filling in questionnaire entries in the experiment's session file on the HRF-1 laptop for downlink. (To monitor the crewmembers' sleep/wake patterns and light exposure, Dan and Peggy wear a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.) Additional Details: ISS On-Orbit Status 01/01/08.

  • 2008 Jan 2 - ISS On-Orbit Status 01/02/08 

    CDR Whitson and FE-2 Tani started out with the daily reading of SLEEP (Sleep-Wake Actigraphy and Light Exposure during Spaceflight) experiment data accumulated during the night, for logging and filling in questionnaire entries in the SLEEP session file on the HRF-1 laptop for downlink.

    (To monitor the crewmembers' sleep/wake patterns and light exposure, Dan and Peggy wear a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.)

    Peggy and Dan spent several hours getting 'the broom out of the closet', i.e., accessing the PMA-3 (Pressurized Mating Adapter 3) at the Node-1 nadir port and retrieving the spare BMRMM (Bearing Motor Roll Ring Module) for its planned installation at the Stbd (right-side) 1A BGA (Beta Gimbal Assembly) on the S4 truss in an upcoming EVA, replacing the failed BMRRM. The following steps were successfully executed to retrieve the spare part: Additional Details: ISS On-Orbit Status 01/02/08.

  • 2008 Jan 3 - ISS On-Orbit Status 01/03/08 

    CDR Whitson and FE-2 Tani started out with the daily reading of SLEEP (Sleep-Wake Actigraphy and Light Exposure during Spaceflight) experiment data accumulated during the night, for logging and filling in questionnaire entries in the SLEEP session file on the HRF-1 laptop for downlink.

    (To monitor the crewmembers' sleep/wake patterns and light exposure, Dan and Peggy wear a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.)

    Dr. Whitson conducted her first clinical blood analysis of the US PHS (Periodic Health Status) with Blood Labs exam. Afterwards, all PHS hardware was stowed again. (The PHS exam, with PCBA (Portable Clinical Blood Analyzer) analysis and clinical evaluation, is guided by special software (IFEP, in-flight examination program) on the MEC (Medical Equipment Computer). While PCBA analyzes total blood composition, the blood's hematocrit is particularly measured by the Russian MO-10 protocol.) Additional Details: ISS On-Orbit Status 01/03/08.

  • 2008 Jan 5 - ISS On-Orbit Status 01/05/08 

    Saturday -- off-duty day for CDR Whitson, FE-1 Malenchenko and FE-2 Tani except for housekeeping and voluntary work.

    CDR Whitson & FE-2 Tani started out with the daily reading of SLEEP (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) experiment data accumulated during the night, for logging and filling in questionnaire entries in the SLEEP session file on the HRF-1 laptop for downlink. (To monitor the crewmembers' sleep/wake patterns and light exposure, Dan and Peggy wear a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.) Additional Details: ISS On-Orbit Status 01/05/08.

  • 2008 Jan 6 - ISS On-Orbit Status 01/06/08 

    Sunday -- off-duty day for CDR Whitson, FE-1 Malenchenko and FE-2 Tani (congratulations, Dan, to the nice write-up about you and your mom in today's Washington Post!).

    Ahead: Week 12 of Increment 16. Also:

    Christmas Eve for tomorrow's Russian Orthodox Christmas.

    CDR Whitson & FE-2 Tani started out with the daily reading of SLEEP (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) experiment data accumulated during the night, for logging and filling in questionnaire entries in the SLEEP session file on the HRF-1 laptop for downlink. (To monitor the crewmembers' sleep/wake patterns and light exposure, Dan and Peggy wear a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.) Additional Details: ISS On-Orbit Status 01/06/08.

  • 2008 Jan 7 - ISS On-Orbit Status 01/07/08 

    Russian Orthodox Christmas, a holiday also for ISS.

    Ahead: Week 12 of Increment 16.


    S Rodzhestvom Kristovym!

    CDR Whitson & FE-2 Tani started out with the daily reading of SLEEP (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) experiment data accumulated during the night, for logging and filling in questionnaire entries in the SLEEP session file on the HRF-1 laptop for downlink. (To monitor the crewmembers' sleep/wake patterns and light exposure, Dan and Peggy wear a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.)

    At ~5:00am EST, FE-1 Malenchenko received a 10-min VIP call via S-band from Patriarch Alexis II of the Russian Orthodox Church, speaking from TsUP/Moscow and extending best wishes to the crew on the occasion of today's Orthodox Christmas celebration. (The Russian Orthodox Church celebrates its Christmas 13 days after Western Christmas, on January 7, in accordance with the old Julian calendar. It is a day of both solemn ritual and joyous celebration. Christmas was banned throughout Russia after the 1917 Revolution, along with other religious celebrations, and it wasn't until 75 years later, in 1992, that the holiday was again openly observed. Today, it's once again celebrated in grand fashion, with citizens participating in an all-night Mass in incense-filled Cathedrals amidst the company of the painted icons of Saints, along with a traditional family get-together and special meal on Christmas Eve.)

    Later, Yuri completed today's routine maintenance of the SOZh system (Environment Control & Life Support System, ECLSS) in the Service Module (SM), including ASU toilet facilities systems/replaceables, the weekly collection of the toilet flush (SP) counter and water supply (SVO) readings for calldown to TsUP.

    The crewmembers performed their regular 2.5-hr physical workout program (about half of which is used for setup & post-exercise personal hygiene) on the CEVIS cycle ergometer (FE-2), TVIS treadmill (CDR, FE-1), RED (CDR, FE-2) and VELO bike with bungee cord load trainer (FE-1).

    Afterwards, Peggy Whitson copied the exercise data file to the MEC (Medical Equipment Computer) laptop for downlink, including the daily wristband HRM (Heart Rate Monitor) data of the workouts on RED, followed by their erasure on the HRM storage medium (done six times a week).

    With the Russian O2 (oxygen) generator 'Elektron' turned off since 12/28/07, the FE-1 had time set aside for another 1-hour O2 repress of the cabin atmosphere from Progress M-62/27P storage tankage, if required. Yesterday's repress added about 8 mmHg of O2 into the ISS as per plan. (The Elektron will remain powered down until 1/9/08 to conserve hardware lifetime. During this time, the station will be periodically repressurized with oxygen from Progress 27P.)

    A new entry still on discretionary US 'job jar' task list for Peggy and Yuri is 'ghosting' an updated personal image with their preferred material on a 60GB hard disk in an A31p laptop UltraBay Adapter reserved as their CPSD (Crew Personal Support Disk), a 45-min task for each.

    Also on Whitson's voluntary task list, at her convenience, is an audit of rack locations, using the IMS (Inventory Management System). (The audit function, introduced with the implementation of IMS software version 2.0, allows the crewmember to set up audits of bags, kits, containers and stowage locations on the laptop.)

    A third new item on the 'job jar' task list is for FE-2 Tani to continue his crew departure preparations.

    The two flight engineers were scheduled for PFCs (Private Family Conferences) via S-band/audio and Ku-band/MS-NetMeeting application (which displays the uplinked ground video on the SSC-9 laptop), Yuri at ~6:20am EST, Dan at ~11:50am.

    No CEO photo targets uplinked for today.

  • 2008 Jan 8 - ISS On-Orbit Status 01/08/08 

    CDR Whitson and FE-2 Tani started out with the daily reading of SLEEP (Sleep-Wake Actigraphy and Light Exposure during Spaceflight) experiment data accumulated during the night, for logging and filling in questionnaire entries in the SLEEP session file on the HRF-1 laptop for downlink.

    (To monitor the crewmembers' sleep/wake patterns and light exposure, Dan and Peggy wear a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.)

    Working in the DC1 Docking Compartment, FE-1 Malenchenko, later joined by CDR Whitson, started a three-day maintenance activity on three Russian Orlan-M spacesuits (#25, #26, #27), first initiating discharge of 825M3 Orlan battery pack #1, then scrubbing and degassing the Orlan water loops, followed by the coolant loops in the DC1 and SM PkhO (Service Module Transfer Compartment) BSS Orlan Interface Units. (Functional inspection & checkout of the suits and their spare parts, including bladder leak tests, are scheduled tomorrow & Thursday.) Additional Details: ISS On-Orbit Status 01/08/08.

  • 2008 Jan 9 - ISS On-Orbit Status 01/09/08 

    CDR Whitson and FE-2 Tani started out with the daily reading of SLEEP (Sleep-Wake Actigraphy and Light Exposure during Spaceflight) experiment data accumulated during the night, for logging and filling in questionnaire entries in the SLEEP session file on the HRF-1 laptop for downlink.

    (To monitor the crewmembers' sleep/wake patterns and light exposure, Dan and Peggy wear a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.)

    The FE-2 worked in the Airlock (A/L), starting on a lengthy (2h 25m) troubleshooting procedure on the EACP (EVA/EMU Audio Control Panel), first setting up comm from the A/L, then activating the EACP and connecting it via the 'low clearance' Y-cable to ATU-4 (Audio Terminal Unit, #4) and ATU-6 on the A/L Avionics Rack. After initial testing, the EACP was turned off again. (ATU-6 was installed by Clay Anderson on 10/11/07 in place of a failed unit, and the failed ATU-6 was returned on 10A. The new ATU-6 has been experiencing periodic lockups and PBIT (passive built-in test) faults. Engineering analysis and testing indicate that these issues may be caused by improperly mated J3 & J4 connections, a problem with the address connector, or a dirty fiber-optic connector. There are 3 ATUs in the A/L, one of which must be functional for EVAs, so long as the suited EVA crew has established UHF (Ultra High Frequency) radio communication.) Additional Details: ISS On-Orbit Status 01/09/08.

  • 2008 Jan 10 - ISS On-Orbit Status 01/10/08 

    CDR Whitson and FE-2 Tani started out with the daily reading of SLEEP (Sleep-Wake Actigraphy and Light Exposure during Spaceflight) experiment data accumulated during the night, for logging and filling in questionnaire entries in the SLEEP session file on the HRF-1 laptop for downlink.

    (To monitor the crewmembers' sleep/wake patterns and light exposure, Dan and Peggy wear a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.)

    Upon wakeup, FE-1 Yuri Malenchenko terminated his seventh MBI-12 SONOKARD experiment session, started last night, by taking the recording device from his SONOKARD sports shirt pocket and later copying the measurements to the RSE-MED laptop for subsequent downlink to the ground. (SONOKARD objectives are stated to (1) study the feasibility of obtaining the maximum of data through computer processing of records obtained overnight, (2) systematically record the crewmember's physiological functions during sleep, (3) study the feasibility of obtaining real-time crew health data. Investigators believe that contactless acquisition of cardiorespiratory data over the night period could serve as a basis for developing efficient criteria for evaluating and predicting adaptive capability of human body in long-duration space flight.) Additional Details: ISS On-Orbit Status 01/10/08.

  • 2008 Jan 11 - ISS On-Orbit Status 01/11/08 

    CDR Whitson and FE-2 Tani started out with the daily reading of SLEEP (Sleep-Wake Actigraphy and Light Exposure during Spaceflight) experiment data accumulated during the night, for logging and filling in questionnaire entries in the SLEEP session file on the HRF-1 laptop for downlink.

    (To monitor the crewmembers' sleep/wake patterns and light exposure, Dan and Peggy wear a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.)

    At ~3:10am EST, the FE-2 activated the VDS MPC (Video Distribution System/Multi-Purpose Converter) with its four downlinks to allow the ground to conduct HDTV (high-definition TV) playback and downlink operations. Later (~11:30am), the MPC was powered off again. Additional Details: ISS On-Orbit Status 01/11/08.

  • 2008 Jan 14 - ISS On-Orbit Status 01/14/08 

    Underway: Week 13 of Increment 16.

    CDR Whitson & FE-2 Tani started out with the daily reading of SLEEP (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) experiment data accumulated during the night, for logging and filling in questionnaire entries in the SLEEP session file on the HRF-1 laptop for downlink. (To monitor the crewmembers' sleep/wake patterns and light exposure, Dan and Peggy wear a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.) Additional Details: ISS On-Orbit Status 01/14/08.

  • 2008 Jan 15 - ISS On-Orbit Status 01/15/08 

    CDR Whitson and FE-2 Tani started out with the daily reading of SLEEP (Sleep-Wake Actigraphy and Light Exposure during Spaceflight) experiment data accumulated during the night, for logging and filling in questionnaire entries in the SLEEP session file on the HRF-1 laptop for downlink.

    (To monitor the crewmembers' sleep/wake patterns and light exposure, Dan and Peggy wear a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary "job jar" task list.)

    FE-1 Malenchenko serviced the Russian BMP (Harmful Impurities Removal System), starting the "bake-out" cycle to vacuum on absorbent bed #1 of the regenerable dual-channel filtration system. The regen process will be terminated before sleeptime, at ~2:20pm EST. Regeneration of bed #2 follows tomorrow. (Regeneration of each of the two cartridges takes about 12 hours and is conducted only during crew awake periods.) Additional Details: ISS On-Orbit Status 01/15/08.

  • 2008 Jan 20 - ISS On-Orbit Status 01/20/08 

    Sunday -- off-duty day for CDR Whitson, FE-1 Malenchenko and FE-2 Tani.

    Ahead: Week 14 of Increment 16.

    For today's VolSci (Voluntary Weekend Science) program, CDR Whitson continued her work with the MSG (Microgravity Science Glovebox) and the InSPACE-2 (Investigating the Structure of Paramagnetic Aggregates from Colloidal Emulsions) experiment, today conducting runs #18, #19, and #20, then powered down the payload and switched the MSG to standby. (After activation of MSG plus InSPACE & InSPACE-2 equipment, Peggy checked on alignment & focusing of MSG video cams, switched the magnetic field between runs, today pulsing the field at 2 Hz (Hertz) instead of 20 Hz as she did previously. Peggy also repositioned the sample vial (VA-004) by 90 deg, used camera 2 & recorder 2 in the vial position 2 starting with run #19, changed out video recorder tapes and later deactivated InSPACE & MSG. InSPACE, conducted last in June 2006 by Jeff Williams on Increment 13, obtains basic data on magnetorheological fluids, i.e., a new class of "smart materials" that can be used to improve or develop new brake systems, seat suspensions robotics, clutches, airplane landing gear, and vibration damper systems. The dispersed particles are contained in CAs (Coil Assemblies) in the MSG that subject them to electric fields of certain strength and frequencies.)

    FE-2 Dan Tani completed his daily status check on the BCAT-3 (Binary Colloidal Alloy Test-3) science payload, running by itself in Node-2 since 12/13/07 (briefly interrupted for EVA-13 photo support). (The status check, conducted on the last image taken by the DCS 760 digital still camera which is controlled by EarthKAM software on an A31p laptop, is to verify proper image focus and camera alignment. The SSC (Station Support Computer) is taking photography of the phase separation occurring in the BCAT Sample 3, with the photo flash going off every half hour.)

    FE-1 Malenchenko conducted today's routine maintenance of the SOZh system (Environment Control & Life Support System, ECLSS) in the Service Module (SM), including ASU toilet facilities systems/replaceables, the weekly collection of the toilet flush (SP) counter and water supply (SVO) readings for calldown to TsUP.

    The crewmembers performed their regular 2.5-hr physical workout program (about half of which is used for setup & post-exercise personal hygiene) on the CEVIS cycle ergometer (CDR), TVIS treadmill (FE-1, FE-2), RED (CDR, FE-2) and VELO bike with bungee cord load trainer (FE-1).

    At ~9:30am EST, Yuri had his PFC (Private Family Conference) via S-band/audio and Ku-band/MS-NetMeeting application (which displays the uplinked ground video on the SSC-10 laptop).

    At ~2:22pm, Dan had his PFC.

    With the Elektron-VM O2 (oxygen) generator currently off, a 5-min cabin air refresh is to be performed by the FE-1 (off his voluntary task list) from Progress M-62/27P storage (SrPK) as required.

    MPC HDTV Update: Dan Tani was lauded by the ground for his great work on 1/17 verifying the MPC HDTV (Multi-Purpose Converter/High-Definition TV) capability all the way to the NASA TV satellite. The test was very successful, yielding an overall end-to-end audio latency (delay) for the MPC System of 3.2 seconds. This is the delay from the crewmember to JSC/MCC-H to NASA Headquarters and out to the NASA TV satellite in high definition, i.e. the sum total of the audio delay the interviewer and interviewee will "feel" during an interactive event. This Japan/JAXA originated system will be utilized soon for downlink messages and in-flight interviews based on client capability.

    No CEO photo targets uplinked for today. (Due to the Martin Luther King Federal Holiday tomorrow (1/21), the next CEO observations will be conducted on 1/23 (targets uplinked 1/22).)

  • 2008 Jan 21 - ISS On-Orbit Status 01/21/08 

    Martin Luther King Jr. Federal Holiday. Underway: Week 14 of Increment 16.

    CDR Whitson & FE-2 Tani started out with the daily reading of SLEEP (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) experiment data accumulated during the night, for logging and filling in questionnaire entries in the SLEEP session file on the HRF-1 laptop for downlink. (To monitor the crewmembers' sleep/wake patterns and light exposure, Dan and Peggy wear a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.) Additional Details: ISS On-Orbit Status 01/21/08.

  • 2008 Jan 23 - ISS On-Orbit Status 01/23/08 

    CDR Whitson and FE-2 Tani started out with the daily reading of SLEEP (Sleep-Wake Actigraphy and Light Exposure during Spaceflight) experiment data accumulated during the night, for logging and filling in questionnaire entries in the SLEEP session file on the HRF-1 laptop for downlink.

    (To monitor the crewmembers' sleep/wake patterns and light exposure, Dan and Peggy wear a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.)

    Peggy Whitson continued her work with the InSPACE-2 (Investigating the Structure of Paramagnetic Aggregates from Colloidal Emulsions) experiment in the MSG (Microgravity Science Glovebox), today conducting runs #23 and #24, then powering down the payload and switching the MSG to standby. (After activation of MSG plus InSPACE & InSPACE-2 equipment, Peggy checked on alignment & focusing of MSG video cam #2, repositioned the sample vial, changed out video recorder tapes and later deactivated InSPACE & MSG. InSPACE, conducted last in June 2006 by Jeff Williams on Increment 13, obtains basic data on magnetorheological fluids, i.e., a new class of "smart materials" that can be used to improve or develop new brake systems, seat suspensions robotics, clutches, airplane landing gear, and vibration damper systems. The dispersed particles are contained in CAs (Coil Assemblies) in the MSG that subject them to electric fields of certain strength and frequencies.) Additional Details: ISS On-Orbit Status 01/23/08.

  • 2008 Jan 24 - ISS On-Orbit Status 01/24/08 

    CDR Whitson and FE-2 Tani started out with the daily reading of SLEEP (Sleep-Wake Actigraphy and Light Exposure during Spaceflight) experiment data accumulated during the night, for logging and filling in questionnaire entries in the SLEEP session file on the HRF-1 laptop for downlink.

    (To monitor the crewmembers' sleep/wake patterns and light exposure, Dan and Peggy wear a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.)

    Dan Tani dismantled the InSPACE-2 (Investigating the Structure of Paramagnetic Aggregates from Colloidal Emulsions) experiment in the MSG (Microgravity Science Glovebox) and stowed the equipment, including the video gear. Additional Details: ISS On-Orbit Status 01/24/08.

  • 2008 Jan 26 - ISS On-Orbit Status 01/26/08 

    Saturday -- off-duty day for CDR Whitson, FE-1 Malenchenko and FE-2 Tani except for housekeeping and voluntary work.

    FE-1 Malenchenko finished Part 2 of his first stress test plus saliva and blood sampling of the ESA/Russian biomed experiment 'IMMUNO' (Neuroendocrine & Immune Responses in Humans During & After Long Term Stay at ISS), today completing remaining urine sample collections. Specimens were then stowed in a special urine containment bag (blood samples were secured yesterday in the MELFI {Minus Eighty Degree Celsius Laboratory Freezer for ISS} in cold packs). (IMMUNO is a 24-hr. test of human immune system changes, with the objective to investigate immune neuro-endocrine reactions in the space environment by studying samples of saliva, blood and urine using collection kits and the biomedical (MBI) protection kit. Also included are entries in a fluid/medications intact log, and a stress-test questionnaire to be filled out by the subject at begin and end of the first day.) Additional Details: ISS On-Orbit Status 01/26/08.

  • 2008 Jan 27 - ISS On-Orbit Status 01/27/08 

    Sunday -- off-duty day for CDR Whitson, FE-1 Malenchenko and FE-2 Tani except for housekeeping and voluntary work.

    Ahead: Week 15 of Increment 16.

    FE-2 Tani started out with the daily reading of SLEEP (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) experiment data accumulated during the night on his Actiwatch, for logging and filling in questionnaire entries in the SLEEP session file on the HRF-1 laptop for downlink.

    The crew performed the regular weekly three-hour task of thorough station cleaning. ("Uborka", usually done on Saturdays, includes removal of food waste products, cleaning of compartments with vacuum cleaner, damp cleaning of the Service Module (SM) dining table, other frequently touched surfaces and surfaces where trash is collected, as well as the CDR's sleep station with a standard cleaning solution; also, fan screens and grilles are cleaned to avoid temperature rises. Special cleaning is also done every 90 days on the HEPA (high-efficiency particulate air) bacteria filters in the Lab.) Additional Details: ISS On-Orbit Status 01/27/08.

  • 2008 Jan 28 - ISS On-Orbit Status 01/28/08 

    Underway: Week 15 of Increment 16.

    FE-2 Tani started out with the daily reading of SLEEP (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) experiment data accumulated during the night on his Actiwatch, for logging and filling in questionnaire entries in the SLEEP session file on the HRF-1 laptop for downlink.

    The FE-2 also performed standard switch-over maintenance on the starboard & portside Lab CCAA (Common Cabin Air Assembly) air conditioners, closing the ITCS LTL (Internal Thermal Control System/Low Temperature Loop) flow to the first (LAB1S6) and initiating it on the second (LAB1P6) unit. This is a periodic service task. Additional Details: ISS On-Orbit Status 01/28/08.

  • 2008 Jan 29 - ISS On-Orbit Status 01/29/08 

    FE-1 Malenchenko set up the pumping equipment and initiated (later closed out) the periodic transfer of urine from five EDV-U containers in the SM (Service Module) to the Rodnik BV2 tank of Progress M-62/27P.

    With the Elektron-VM O2 (oxygen) generator currently off, a one-hour cabin air refresh was to be performed by the FE-1 from Progress 27P storage (SrPK) if required.

    CDR Whitson conducted the periodic (every two weeks) 10-min inspection of the RED (Resistive Exercise Device) canister cords and accessory straps as well as the canister bolts for re-tightening if required.

    Malenchenko completed today's routine maintenance of the SOZh system (Environment Control & Life Support System, ECLSS) in the SM, including ASU toilet facilities systems/replaceables.

    Working off his 'time permitting' discretionary job list, Yuri performed the daily 20-min. IMS maintenance, updating/editing its standard 'delta file' including stowage locations, for the regular weekly automated export/import to its three databases on the ground (Houston, Moscow, Baikonur).

    At ~8:45am EST, the crew conducted a teleconference with the Shuttle crew of STS-122/1E, scheduled for launch on 2/7.

    At ~9:40am, Peggy, Dan and Yuri tagged up with EVA specialists at MCC-H to discuss final arrangements for tomorrow's EVA-14 spacewalk.

    Spending time in the Airlock (A/L) for final preparations for EVA-14, Peggy Whitson and Dan Tani -

    Configured the DCS-760 digital camera and flash attachment to be taken outside,
    Recharged three batteries for the EVA EMU-prebreathe period, to be installed in the EVA photo flash unit and EVA camera just prior to the spacewalk (when off station power),
    Prepared the A/L EL (Airlock Equipment Lock) for the Campout & spacewalk,
    Tagged up with ground specialists at ~9:40am EST for reviewing EVA particulars, and
    Underwent the standard pre-EVA PMC (Private Medical Conference) via S- & Ku-band audio/video.
    Yuri prepared three Russian 'Pille-MKS' radiation dosimeters, recorded their dosages and equipped each of the two EMUs (Extravehicular Mobility Unit) with a radiation sensor (A0309/CDR & A0310/FE-2). (A third sensor, A0308, was placed in the SM on the PULT reader for background readings.)

    The CDR powered down the ham radio equipment in SM (Service Module) and FGB at ~12:30pm to prevent RF interference with the EMUs during the spacewalk. Peggy also closed the protective Lab science window shutters.

    The crewmembers completed their regular 2.5-hr. physical workout program (about half of which is used for setup & post-exercise personal hygiene) on the CEVIS cycle ergometer (CDR, FE-2), TVIS treadmill (FE-1, FE-2), RED resistive exercise device (CDR, FE-2), and VELO bike with bungee cord load trainer (FE-1).

    Whitson then transferred the crew's exercise data file to the MEC for downlink, as well as the daily wristband HRM data of the workouts on RED, followed by their erasure on the HRM storage medium (done six times a week).

    At ~2:50pm EST, Whitson and Tani began their overnight Campout prebreathe and lockout in the A/L. With METOX (Metal Oxide) canisters for CO2 removal in the A/L, the two spacewalkers performed PBA (Portable Breathing Apparatus) mask prebreathe for denitrogenation, while readying their equipment, then depressed the A/L to 10.2 psi for the campout.

    After the 8.5-hr sleep period before the spacewalk, the A/L CL (Crewlock) hatch will be cracked at ~1:00am EST for a hygiene break/with mask prebreathe for Whitson and Tani, after spending the night on 10.2 psi. Around 2:10am, the hatch will be closed again by IV Yuri Malenchenko for EVA preparations in 10.2 psi, followed by EMU purge & prebreath. Afterwards, Yuri will support CL depressurization and EV1 & EV2 will egress (~5:20-5:30am).

    CEO photo targets uplinked for today were IPY - Aurora Borealis; Heard Island, S. Indian Ocean (clear weather windows continue to be present in the region of Heard Island at the time of the ISS orbit pass. Looking to the right of track as ISS approached Antarctica. Mapping photography of the island was requested to capture snow and ice extent. The island of Kerguelen may also be visible to the northwest of Heard Island), and Patagonian Glaciers, S. America (this orbit track provided a traverse across the central portion of the Patagonian ranges. Overlapping, nadir mapping frames of glaciers on the western side of the mountains were requested).

  • 2008 Jan 31 - ISS On-Orbit Status 01/31/08 

    Light duty day today for the crew following yesterday's successful EVA.

    >>>>Today 50 years ago, the U.S. launched its first Earth satellite, Explorer 1, on a Redstone/Jupiter rocket built by the Wernher von Braun team for the Army Ballistic Missile Agency (ABMA). The satellite, developed by JPL and equipped with radiation sensors by Dr. James Van Allen, discovered the Van Allen Radiation Belts of Earth.<<<<

    FE-2 Tani started out with the daily reading of SLEEP (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) experiment data accumulated during the night, for logging and filling in questionnaire entries in the SLEEP session file on the HRF-1 laptop for downlink. (To monitor the crewmembers' sleep/wake patterns and light exposure, Dan wears a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.) Additional Details: ISS On-Orbit Status 01/31/08.

  • 2008 Feb 1 - ISS On-Orbit Status 02/01/08 

    Happy Birthday, Dan!

    FE-2 Tani started out with the daily reading of SLEEP (Sleep-Wake Actigraphy and Light Exposure during Spaceflight) experiment data accumulated during the night, for logging and filling in questionnaire entries in the SLEEP session file on the HRF-1 laptop for downlink.

    (To monitor the crewmembers' sleep/wake patterns and light exposure, Dan wears a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.)

    Before breakfast, CDR Whitson completed her 120-Day NUTRITION/w Repository session (blood collection only). Whitson also set up NUTRITION w/Repository hardware for the 24-hour urine sample collections that will begin tomorrow morning and end Sunday morning. Additional Details: ISS On-Orbit Status 02/01/08.

  • 2008 Feb 5 - ISS On-Orbit Status 02/05/08 

    With the usual dependability, Progress M-63/28P launched nominally this morning at Baikonur at 8:02am EST.

    Ascent was nominal, all appendages (antennae and solar arrays) deployed nominally and the vehicle reached orbital insertion at 8:12am. 28P is scheduled to dock to the ISS on 2/7 (Thursday) at 9:38am. Congrats, Baikonur!

    After wakeup and before breakfast, FE-2 Dan Tani completed his daily access of the SLEEP experiment (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) software for data logging and filling in questionnaire entries in the experiment's laptop session file on the HRF-1 laptop for downlink. (To monitor the crewmember's sleep/wake patterns and light exposure, Dan wears a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.) Additional Details: ISS On-Orbit Status 02/05/08.

  • 2008 Feb 6 - ISS On-Orbit Status 02/06/08 

    Progress M-63/28P is continuing its 3-day flight to the ISS for docking tomorrow morning (2/7) at ~9:38am EST at the DC1 nadir port.

    After wakeup and before breakfast, FE-2 Dan Tani completed his daily access of the SLEEP experiment (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) software for data logging and filling in questionnaire entries in the experiment's laptop session file on the HRF-1 laptop for downlink. (To monitor the crewmember's sleep/wake patterns and light exposure, Dan wears a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.) Additional Details: ISS On-Orbit Status 02/06/08.

  • 2008 Feb 7 - ISS On-Orbit Status 02/07/08 

    The crew's work/sleep cycle was shifted preparatory to Atlantis 1E arriva, to 3:30am-8:30pm.

    Yest kasaniye! Progress M-63 (28P), approaching from below the station, docked flawlessly at the DC1 Docking Compartment nadir port at 9:38am EST, followed by docking probe retraction and hook closure ('sborka') after motion damp-out, while the ISS was in LVLH (local vertical/local horizontal) attitude. All Progress systems operated nominally from Automated Rendezvous start. (Launched on 2/5 (8:02am EST), the 28P resupply drone delivered about 2.5 tons of cargo for the ISS crews, including propellants for the Russian thrusters, fresh water, oxygen, food, spare parts, repair gear, life support and science experiment hardware.) Additional Details: ISS On-Orbit Status 02/07/08.

  • 2008 Feb 8 - ISS On-Orbit Status 02/08/08 

    Dan Tani's 109th day in space.

    The crew's work/sleep cycle was shifted once more in preparation for Atlantis 1E arrival, to 5:00am-8:15pm.

    STS-122/Atlantis continues its catch-up flight for tomorrow's FD3 ISS docking at ~12:25pm EDT, to begin ISS Stage 1E. (Catch-up rate ~480 nmi. per revolution of ~92 min.). (Hatch opening: expected at ~1:35pm, followed by: Safety Briefing, OBSS (Orbiter Boom Sensor System) handoff from SSRMS (Space Station Remote Manipulator System) to SRMS (Shuttle RMS) at ~4:30pm, Soyuz seat liner transfer (for the Tani/Anderson exchange), and preparations for the first spacewalk, EVA-1, by EV1 Walheim & EV2 Schlegel, on 2/10, preceded by their overnight Campout tomorrow night in the Airlock (A/L) for denitrogenation/pre-breathe. Objectives of the nominal 11-day mission: Delivering & installing the Columbus module, delivering new ISS-16 crewmember LĂ(c)opold Eyharts & bringing Dan Tani back home, and conducting a total of three EVAs. Landing will nominally take place at KSC on FD10 (2/18) at ~9:59am EST.) Additional Details: ISS On-Orbit Status 02/08/08.

  • 2008 Feb 9 - ISS On-Orbit Status 02/09/08 

    All ISS systems continue to function nominally, except those noted previously or below.

    aturday = Docking Day. Happy Birthday, Peggy Whitson!

    STS-122/Atlantis docked smoothly at the PMA-2 (Pressurized Mating Adapter-2) port at 12:17pm EST, eight minutes ahead of time, after successfully completing the RPM (R-Bar Pitch Maneuver) at 11:32am. The station now hosts ten occupants again as Mission 1E is underway. (The combined crew is comprised of ISS CDR Peggy Whitson, FE-1 Yuri Malenchenko, FE-2 Dan Tani, STS CDR Steve Frick, PLT Alan Poindexter, MS1 Leland Melvin, MS2 Rex Walheim, MS3 Hans Schlegel, MS4 Stanley Love, and MS5 LĂ(c)opold Eyharts who replaces Dan Tani as FE-2, while the latter returns on the Atlantis as MS-5.) Additional Details: ISS On-Orbit Status 02/09/08.

  • 2008 Feb 10 - ISS On-Orbit Status 02/10/08 

    Sunday --- Mission 1E Flight Day 4 (FD4).

    Ahead: Week 17 of Increment 16.

    Mission 1E replanning by MCC-Houston, driven by the one-day delay of the first spacewalk, was completed last night, as follows:

    Approved mission extension by one day (i.e., 12+0+2 instead of 11+0+2), resulting in 2/19 (Tuesday) as return date for Atlantis;
    Limiting resource being oxygen (O2), under further discussion is the option to either extend by one more docked day or transfer the unexpended O2 to the ISS (current O2 margins are estimated to be 11+1+2 plus an additional 20-25 hours. These are still being refined given the insertion of the new FD4);
    All FD 4 activities moved to FD 5. EVA-1 will be conducted by Stanley Love and Rex Walheim tomorrow, with Campout of the two tonight;
    Today (FD 4) was replanned and includes 1.5 hrs of focused inspection (FI) of the starboard OMS (Orbital Maneuvering System) pod blanket that has a corner slightly peeled back (the FI, starting at ~ 2:15 pm EST, is planned for 90 min, with additional FI time available on FD 06 if needed);
    Transfer status: 22% of transfer complete, 6 hours of transfer scheduled for FD 4, expect 35/40 lbs N2 transfer today, 3 CWCs filled.
    Wakeup time for the ISS crew remains at 4:45am EST, with sleep time tonight 8:45pm. Same times for the Shuttle crew. Additional Details: ISS On-Orbit Status 02/10/08.

  • 2008 Feb 11 - ISS On-Orbit Status 02/11/08 

    Mission 1E Flight Day 5 (FD5). Underway: Week 17 of Increment 16.

    Mission 1E's EVA-1 was completed successfully by Stanley Love & Rex Walheim in 7hr 58min, accomplishing all its objectives.
    (During the spacewalk, Walheim (EV1) & Love (EV2) prepared Columbus for unberthing and installation, hooking up electric cables, removing protective covers from the module's docking mechanism and equipping Columbus with the PDGF (Power & Data Grapple Fixture) required for grappling. They also started preparing the NTA (Nitrogen Tank Assembly) for removal, preparatory to replacement with a new NTA on EVA-2 (disconnecting electric cables and two ammonia flex hoses was deferred to Wednesday, but Walheim unfastened two of the four bolts holding down the NTA). Official start time of the spacewalk was 9:13am EST, about 25 minutes ahead of the timeline, and it ended at 5:11pm. Total EVA duration (PET = Phase Elapsed Time) was 7h 58min. It was the 102nd spacewalk for ISS assembly & maintenance and the 74th from the station (28 from Shuttle, 52 from Quest, 22 from Pirs) totaling 451h 11min, and the 6th for Expedition 16 (totaling 43h 19min.) After today's EVA, a total of 125 spacewalkers (94 NASA astronauts, 21 Russians, and ten astronauts representing Japan-1, Canada-4, France-1, Germany-1 and Sweden-3) have logged a total of 639h 33min outside the station on building, outfitting and servicing. It was also the 124th spacewalk by U.S. astronauts.) Additional Details: ISS On-Orbit Status 02/11/08.

  • 2008 Feb 12 - ISS On-Orbit Status 02/12/08 

    Mission 1E Flight Day 6 (FD6). Congratulations, ESA!

    At ~9:15am EST, the European Columbus laboratory was opened and entered by crewmembers for the first time. (Columbus is permanently attached at the starboard port of Node-2.)

    Crew sleep cycle remains at 4:45am - 8:15pm for both crews.

    Before breakfast, FE-2 Dan Tani completed his daily access of the SLEEP experiment (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) software for data logging and filling in questionnaire entries in the experiment's laptop session file on the HRF-1 laptop for downlink. (To monitor the crewmember's sleep/wake patterns and light exposure, Dan wears a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days, as part of the crew's discretionary 'job jar' task list.)

    CDR Peggy Whitson and FE-2-16 Leo Eyharts continued their IMMUNO (Integrated Immune Assessment) experiment, begun on 2/9, with liquid saliva collections, first thing after wake-up and prior to breakfast, drinking and teeth-brushing. All samples were stored at ambient temperature. Dan Tani's IMMUNO liquid saliva collection starts tomorrow morning. (IMMUNO (Integrated Immune Assessment)is a 24-hr. test of human immune system changes, with the objective to investigate immune neuro-endocrine reactions in the space environment by studying samples of saliva, blood and urine using collection kits and the biomedical (MBI) protection kit, to develop and validate an immune monitoring strategy consistent with operational flight requirements and constraints. The strategy uses both long and short duration crewmembers as study subjects. The saliva is collected in two forms, dry and liquid. The dry samples are collected at intervals during the collection day using a specialized book that contains filter paper. The liquid saliva collections require that the crewmember soak a piece of cotton inside their mouth and place it in a salivette bag; there are four of the liquid collections during docked operations. The on-orbit blood samples are collected right before undocking and returned on the Shuttle so that analysis can occur with 48 hours of the sampling. This allows assays that quantify the function of different types white blood cells and other active components of the immune system. For cold storage, samples are secured in the MELFI (Minus-Eighty Laboratory Freezer for ISS). Also included are entries in a fluid/medications intact log, and a stress-test questionnaire to be filled out by the subject at begin and end. Urine is collected during a 24-hour period, conventionally divided into two twelve-hour phases: morning-evening and evening-morning.) Additional Details: ISS On-Orbit Status 02/12/08.

  • 2008 Feb 13 - ISS On-Orbit Status 02/13/08 

    Mission 1E Flight Day 7 (FD7).

    Crew sleep cycle remains at 4:45am EST - 8:15pm for both crews.

    Mission 1E's EVA-2 was completed successfully by Rex Walheim & Hans Schlegel in 6h 45m, accomplishing all its objectives and get-aheads.
    (During the spacewalk, Walheim (EV1) & Schlegel (EV2) removed the new NTA (Nitrogen Tank Assembly) from the Shuttle PLB (Payload Bay), 'flew' it to the CETA (Crew & Equipment Translation Aid) cart for transfer to the P1 truss, installed it in place of the failed NTA, which they returned via CETA for stowage in the PLB, and performed Get-Aheads, viz.: Clean up Lab MMOD (Micrometeoroid/Orbital Debris Shield) & install Columbus Trunnion Covers.) Official start time of the spacewalk was 9:27am EST, about 8 min ahead of the timeline, and it ended at 4:12pm. Total EVA duration (PET = Phase Elapsed Time) was 6h 45min. It was the 103rd spacewalk for ISS assembly & maintenance and the 75th from the station (28 from Shuttle, 53 from Quest, 22 from Pirs) totaling 457h 56min, and the 7th for Expedition 16 (totaling 50h 04min). After today's EVA, a total of 127 spacewalkers (95 NASA astronauts, 21 Russians, and 11 astronauts representing Japan-1, Canada-4, France-1, Germany-2 and Sweden-3) have logged a total of 646h 18min outside the station on building, outfitting and servicing. It was also the 125th spacewalk involving U.S. astronauts.) Additional Details: ISS On-Orbit Status 02/13/08.

  • 2008 Feb 14 - ISS On-Orbit Status 02/14/08 

    Mission 1E Flight Day 8 (FD8).

    Crew sleep cycle shifted one hour earlier: 3:45am - 7:15pm for both crews.

    Last night, Mission 1E was extended by one day (13+0+2), with landing now on Wednesday, 2/20, at ~9:03am EST (if at KSC).

    Columbus final activation has been completed.

    After yesterday's command queue lockup between the COL CCS (Columbus Orbital Laboratory Command & Control System) and the COL MMC (Mission Management Computer), final activation of COL data management systems was accomplished late last night by transitioning/swapping the primary & backup C&C MDM (Multiplexer/Demultiplexer) computers. (The MMC is the intermodule interface computer required between the US C&DH (Command & Data Handling) system and the COL DMC (Data Management Computer) which handles equipment monitoring) Additional Details: ISS On-Orbit Status 02/14/08.

  • 2008 Feb 16 - ISS On-Orbit Status 02/16/08 

    Mission 1E Flight Day 10 (FD10). Saturday - half-day off for the combined ISS and Shuttle crew except for housekeeping and voluntary work.

    Wake/sleep cycle shifted back again to prepare for 2/18 undocking: 3:15am - 5:15pm EST, Shuttle crew: 3:15am - 5:45pm.

    More crewtime was applied to COL (Columbus Orbital Laboratory) rack configuration, activation & operation, led by CDR Peggy Whitson and FE-2-16 Leo Eyharts. (In particular, Whitson focused on readying the EDR (European Drawer Rack), gathering equipment, outfitting the rack, installing PCDF EU (Protein Crystalization Diagnostic Facility Electronic Unit) coolant water and data connections, setting up the laptop, verifying its software load & activating it, checking out the EDR RFI (Rack Fire Indicator), and checking out the functionalities of the rack's various subsystems.) Additional Details: ISS On-Orbit Status 02/16/08.

  • 2008 Feb 17 - ISS On-Orbit Status 02/17/08 

    Sunday --- Mission 1E Flight Day 11 (FD11).

    Dan Tani's 118th day in space (116 aboard ISS). Ahead: Week 18 of Increment 16.

    Wake/sleep cycle shifted further back to prepare for 2/18 undocking: 1:45am - 4:15pm EST (incl. Eyharts), Shuttle crew: 1:45am - 4:45pm (incl. Tani).

    CDR Peggy Whitson performed her final INTEGRATED IMMUNE blood collection, assisted by MS1 Leland Melvin, right before hatch closure. FE-2 Dan Tani will continue his saliva collections, both liquid and dry, and blood collections aboard the Atlantis all the way home FE-2-16 Leo Eyharts transferred his and Peggy's saliva return pouches and blood sleeves as well as Dan's saliva collection kit to the Shuttle for return. (Background: IMMUNE assessment, integrated with the Russian IMMUNO, is a 24-hr. test of human immune system changes, with the objective to investigate immune neuro-endocrine reactions in the space environment by studying samples of saliva, blood and urine using collection kits and the biomedical (MBI) protection kit, to develop and validate an immune monitoring strategy consistent with operational flight requirements and constraints. The strategy uses both long and short duration crewmembers as study subjects. The saliva is collected in two forms, dry and liquid. The dry samples are collected at intervals during the collection day using a specialized book that contains filter paper. The liquid saliva collections require that the crewmember soak a piece of cotton inside their mouth and place it in a salivette bag; there are four of the liquid collections during docked operations. The on-orbit blood samples are collected right before undocking and returned on the Shuttle so that analysis can occur with 48 hours of the sampling. This allows assays that quantify the function of different types white blood cells and other active components of the immune system. For cold storage, samples are secured in the MELFI (Minus-Eighty Laboratory Freezer for ISS). Also included are entries in a fluid/medications intact log, and a stress-test questionnaire to be filled out by the subject at begin and end. Urine is collected during a 24-hour period, conventionally divided into two twelve-hour phases: morning-evening and evening-morning.) Additional Details: ISS On-Orbit Status 02/17/08.

  • 2008 Feb 18 - ISS On-Orbit Status 02/18/08 

    Underway: Week 18 of Increment 16, with a new FE-2, LĂ(c)opold (Leo) Eyharts who has replaced Dan Tani.

    US Holiday (President's Day).

    STS-122/Atlantis and ISS are flying in separate orbits again (Flight Day 12 for STS-122/1E)

    After final preparations on both sides of the hatches (closed yesterday on ISS side at 1:03pm EST), Atlantis this morning undocked smoothly at 4:27am from PMA-2 (Pressurized Mating Adapter 2), after a total docked time of 11d 13h 42m. (For undocking, the station was turned from -XVV through ~180 deg to +XVV ZLV (+x-axis in velocity vector, z-axis in local vertical) at ~3:30am, put briefly on free drift for the undocking, and then maneuvered to 1E Stage attitude of +XVV TEA attitude at 5:06am.) See picture from Atlantis flight deck, below. Additional Details: ISS On-Orbit Status 02/18/08.

  • 2008 Feb 20 - Landing of STS-122 

  • 2008 Feb 28 - ISS On-Orbit Status 02/28/08 

    For the purpose of testing the main TORU (Teleoperator Control System) receiver on Progress M-63/28P, FE-1 Malenchenko and CDR Whitson worked with ground specialists via VHF on DO3 (Daily Orbit 3) in the standard vehicle-to-vehicle TORU checkout between the Service Module (SM) and the docked Progress 28P.

    Progress thrusters (DPO) were inhibited and not involved. (Crew activities focused on TORU activation, inputting commands via the RUO Rotational Hand Controller and close-out ops. TORU lets an SM-based crewmember perform the approach and docking of automated Progress vehicles in case of failure of the automated KURS system. Receiving a video image of the approaching ISS, as seen from a Progress-mounted docking television camera ('Klest'), on a color monitor ('Simvol-Ts', i.e. 'symbol center') which also displays an overlay of rendezvous data from the onboard digital computer, the crewmember steers the Progress to mechanical contact by means of two hand controllers, one for rotation (RUO), the other for translation (RUD), on adjustable armrests. The controller-generated commands are transmitted from the SM's TORU control panel to the Progress via VHF radio. In addition to the Simvol-Ts color monitor, range, range rate (approach velocity) and relative angular position data are displayed on the 'Klest-M' video monitor (VKU) which starts picking up signals from Progress when it is still approximately 7 km away. TORU is monitored in real time from TsUP over Russian ground sites (RGS) and via Ku-band from Houston, but its control cannot be taken over from the ground.) Additional Details: ISS On-Orbit Status 02/28/08.

  • 2008 Mar 3 - ISS On-Orbit Status 03/03/08 

    Underway: Week 20 of Increment 16.

    FE-1 Malenchenko updated software on the Russian RS1 laptop HDD (Hard Disk Drive). (After first connecting the A31p to the AGAT external monitor (temporarily disconnected from TP2 laptop), the FE-1 'ghosted' (cloned) its HDD with Vers. 07.05 file structure from a DVD, then updated the RS1 HDD new software from an USB memory stick, and created a copy of the load.)

    Afterwards, Malenchenko conducted the periodic/long-term inspection of the pressure hull in the Service Module Working Compartment (SM RO), looking for any moisture, deposits, mold, corrosion and pitting behind panels 107, 109, 130, 134, 135, 138, 139, 452, also underneath the TVIS treadmill (where deposit was discovered earlier) and the cold plates (where SNT and STR lines are installed). (The inspection of the hull surface, which is coated with a primer and dark-green enamel, is done using cleaning napkins to wipe the area in question if required and reporting results to the ground. The hull inspection looks for changed color and cavities; if cavities are found, they are to be measured for depth after cleaning. Digital photographs of the shell before and after the removal of deposits will be made for documentation.) Additional Details: ISS On-Orbit Status 03/03/08.

  • 2008 Apr 2 - ISS On-Orbit Status 04/02/08 

    From the US voluntary 'job jar' task list, after wakeup and before breakfast, CDR Whitson and FE-2 Reisman downloaded the SLEEP (Sleep-Wake Actigraphy and Light Exposure during Spaceflight) experiment data from their Actiwatches to the HRF-1 (Human Research Facility 1) laptop.

    Yi So-yeon, the South Korean SFP (Space Flight Participant), will participate in the experiment. (To monitor the crewmember's sleep/wake patterns and light exposure, crewmembers wear a special Actiwatch device which measures the light levels encountered by them as well as their patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days.)

    Also upon wake-up, CDR Whitson started Part 2 (of 5) of the periodic acoustic measurement protocol by recording post-sleep data of the crew-worn acoustic dosimeters, later deploying the dosimeters statically in Node-2, COL (Columbus Orbital Laboratory), and SM (Service Module) near the Central Post for the duration of the day. (Acoustic data must be taken twice per Increment, each time for the duration of the 16-hour crew workday.) Additional Details: ISS On-Orbit Status 04/02/08.

  • 2008 May 5 - ISS On-Orbit Status 05/05/08 

    Underway: Week 3 of Increment 17.

    >>>Today 47 years ago (1961), the first U.S. Astronaut, Navy Commander Alan 'Big Al' Shepard Jr., launched into a suborbital flight of 15 minutes duration, reaching an altitude of 116 miles. This restored faith in the U.S. space program only 23 days after the Soviet space program launched Cosmonaut Yuri Gagarin into orbit around the planet.<<<

    FE-2 Reisman supported the Japanese CW/RW (Cell Wall/Resist Wall) experiment in the MSG EMCS (Microgravity Science Glovebox/European Modular Cultivation System), removing and relocating EC1 (Experiment Container 1) and EC2 on Rotor A and Rotor B. (CW/RW operates in the EMCS facility in eight special ECs (Experiment Containers) which Garrett recently (3/30) installed on the centrifuges of the facility. The EMCS rack contains two rotating centrifuges, Rotor A & Rotor B, which can support a wide range of small plant & animal experiments under partial gravity conditions.) Additional Details: ISS On-Orbit Status 05/05/08.

  • 2008 May 21 - ISS On-Orbit Status 05/21/08 

    Oleg Kononenko initiated the transfer of the potable water supplies brought up by Progress M-64 to the Service Module (SM)'s Rodnik water tanks (BV1, BV2).

    Later, the pumping equipment was dismantled and the activities were closed out. (After hooking up the plumbing connecting the 29P water tanks with the SM Rodnik tankage, the water was transferred at first in self-flow (under its own tank pressure), then using a compressor pump via a GZhS gas/liquid separator, to remove air bubbles in the water. The subsequent filling of the empty Progress tanks with urine will be scheduled later.)

    After CDR Volkov prepared the auditory test equipment, he, FE-1 Kononenko & FE-2 Reisman took the periodic O-OHA (on-orbit hearing assessment) test, a 30-min. NASA environmental health systems examination to assess the efficacy of acoustic countermeasures, using a special MEC (Medical Equipment Computer) laptop application. It was the second session for the three crewmembers. (The O-OHA audiography test involves minimum audibility measurements for each ear over a wide range of frequencies (0.25-10 kHz) and sound pressure levels, with the crewmembers using individual-specific Prophonics earphones, Bose ANC headsets and the SLM (sound level meter). To conduct the testing, the experimenter is supported by special EarQ software on the MEC, featuring an up/down-arrow-operated slider for each test frequency that the crewmember moves to the lowest sound pressure level at which the tone can still be heard. The baseline test is required not later than about Flight Day 14 for each new Expedition and is then generally performed once per month. Note: There have been temporary hearing deficits documented on some U.S. and Russian crewmembers, all of which recovered to pre-mission levels.) Additional Details: ISS On-Orbit Status 05/21/08.

  • 2008 Jun 20 - ISS On-Orbit Status 06/20/08 

    Crew wake-up was half an hour earlier (1:30am EDT) for the Orlan training exercise, enabling suit telemetry over RGS (Russian Groundsites).

    Sleep time tonight will be back at regular time (5:30pm).

    In the DC1 'Pirs', the CDR & FE-1 continued preparations for the EVA-20 on 7/10-11, with the DC1 comm links configured for their presence. Activities by Volkov & Kononenko today focused on

    Functional testing of the Russian BETA-08 ECG (electrocardiogram) lead cable belts, worn under the Orlan-M suits, using the Gamma-1M medical complex from the PKO medical exam panel,
    Transmission tests, after setting up the Orlan 'Tranzit' communications links via the suits' BRTA radio telemetry units, with the ground via RGS VHF, for spacesuit voice, telemetry & biomedical parameters; followed by
    Restoring nominal communications setup in the DC1, and
    Configuring the backup Orlan #25 for stowage mode, leaving Orlans #26 (FE-1) & #27 (CDR) ready for use on the upcoming spacewalk.
    In the U.S. 'Quest' Airlock, FE-2 Chamitoff continued post-1J EVA activities, terminating the 13-hr discharge process on the last 16-volt EMU (Extravehicular Mobility Unit) battery in the BCM-3 (Battery Charger Module 3) from yesterday. (BCM-4 is currently nonfunctional. The discharge process, originally handled manually by a crewmember, is an automated procedure controlled from an A31p SSC (Station Support Computer) laptop with a special DOS application.) Additional Details: ISS On-Orbit Status 06/20/08.


Contact us with any corrections, additions, or comments.
Conditions for use of drawings, pictures, or other materials from this site..
To contact astronauts or cosmonauts.

© Mark Wade, 1997 - 2008 except where otherwise noted.