Home - Search - Browse - Alphabetic Index: 0- 1- 2- 3- 4- 5- 6- 7- 8- 9
A- B- C- D- E- F- G- H- I- J- K- L- M- N- O- P- Q- R- S- T- U- V- W- X- Y- Z
More Details for 1971-11-18
Detailed assessment of the lunar roving vehicle (LRV) used on the Apollo 15 mission

A detailed objective assessment of the lunar roving vehicle (LRV) used on the Apollo 15 mission indicated:

  • The LRV was successfully deployed, with minor problems.

    Deployment took 26.5 minutes instead of the allotted time of 17 minutes.
    - LRV systems were successfully prepared for traverse. Forward steering was inoperative during EVA-1, but functioned normally on EVA-2 and EVA-3.
    - Average speed during traverse was 9.3 kilometers per hour; maximum speed 13 kilometers per hour. Maximum slopes negotiated were up to 12 degrees. Braking distance was 4.6 meters from 10 kilometers per hour.
    - The navigation system was extremely accurate.
    - Forward visibility was generally excellent.


    Home - Search - Browse - Alphabetic Index: 0- 1- 2- 3- 4- 5- 6- 7- 8- 9
    A- B- C- D- E- F- G- H- I- J- K- L- M- N- O- P- Q- R- S- T- U- V- W- X- Y- Z
    © 1997-2017 Mark Wade - Contact
    © / Conditions for Use