Skip to content
79,433 pages · 13,741 images · since 1994 Browse A–Z Today in space history
Encyclopedia Astronautica The full story of spaceflight
Encyclopedia entry

More Details for 1964-11-17

Original archive entry. The text, images and links below are kept as they were written.

Gemini launch vehicle 2 and spacecraft No. 2 were electrically mated at complex 19.

The Joint Combined Systems Test was run the following day.

This was the first test of launch vehicle and spacecraft combined systems. It consisted of an abbreviated countdown and two plus-time flight simulations, one to exercise the primary guidance system, the second to exercise the secondary system. A second combined systems test, the Flight Configuration Mode Test (FCMT), was completed November 21 in preparation for the Wet Mock Simulated Launch. FCMT was essentially similar to other combined systems tests except that all umbilicals were dropped.