Skip to content
79,433 pages · 13,741 images · since 1994 Browse A–Z Today in space history
Encyclopedia Astronautica The full story of spaceflight
Encyclopedia entry

More Details for 1968-10-24

Original archive entry. The text, images and links below are kept as they were written.

Retesting Saturn V following a lightning strike

Howard D. Burns, Chief of the Saturn V Test Management Office at MSFC, sent to Apollo launch operations officials at KSC a list of requirements for retesting the Saturn V following a lightning strike on the vehicle while on the pad.

These requirements were to be included in the next revision of the overall test and checkout requirements documents at KSC. (Burns' action came largely as a result of discussions at the AS-503 Crew Safety Review Board meeting at KSC on August 20-21, 1968.) Burns recommended that KSC prepare a contingency plan specifying various stage and launch vehicle test and checkout procedures that would satisfy MSFC's requirements. The most immediate assessment must be the overall safety of the launch vehicle. Electronic and electrical components headed the list of specific hardware systems to be assessed.