More Details for 1965-07-04
Original archive entry. The text, images and links below are kept as they were written.
Apollo CM 002 transferred within North American from manufacturing to the test organization
The Weekly Activity Report for the period indicated progress in several areas.
- the CM 002 was transferred internally within North American from manufacturing to the test organization on July 8;
- the CM 009 checkout at North American continued with the central timing equipment and signal conditioner checkout completed, and the new 40-ampere-hour batteries for CSM 009 and 011 were shipped to KSC and North American, respectively; and
- the Grumman subcontract to Eagle-Picher for the LEM batteries was approved by NASA.