STS-119A
Mission
Original archive entry. The text, images and links below are kept as they were written.

Venturestar docks to ISS, 1994 Concept. Lockheed-Martin's "Aeroballistic Rocket" spaceplane -- now called Venturestar -- docks with the Space Station. This 1994 illustration shows what the "Alpha" International Space Station would look like, without Russian modules.
Credit: NASA via Marcus Lindroos
Flight delayed after the Columbia disaster. STS-119 was to have flown ISS Assembly mission ISS-15A. It would have delivered the fourth and final set of U.S. solar arrays along with the S6 fourth starboard truss segment.
The crew would have relocated the P6 Truss from atop the Z1 Truss to its final assembly location attached to the P5 Truss (becoming the final port-side truss segment). The would then redeploy and activate the P6 Truss Channel 2B and 4B solar arrays. The mission would also have delivered the EO-9 crew (Padalka, Fincke, Kononenko) to the station and returned the EO-8 crew (Foale, McArthur, Tokarev) to earth. Instead the mission was completely reformulated with a different crew.
Related
- Spacecraft
- Space Shuttle
Chronology
1 event
2004 January 15
- STS-119 (cancelled) - . Crew: Fincke, Gernhardt, Kelly, Mark, Kononenko, Lindsey, Noriega, Padalka. Nation: USA. Related Persons: Fincke, Gernhardt, Kelly, Mark, Kononenko, Lindsey, Noriega, Padalka. Agency: NASA. Program: ISS. Flight: STS-119A. Spacecraft Bus: Shuttle. Spacecraft: Atlantis. Flight delayed after the Columbia disaster. STS-119 was to have flown ISS Assembly mission ISS-15A and have carried out a crew rotation..