SSTL-900
Spacecraft · Europe
Original archive entry. The text, images and links below are kept as they were written.

Credit: Manufacturer Image
Surrey bus used for the Galileo In-Orbit Validation Element, a prototype for the Galileo European navigation satellite network.
More at: SSTL-900.
Subtopics
- Eutelsat-Quantum Communication satellite built by Airbus Defence and Space (prime); SSTL (bus) for Eutelsat, ESA. Used the GMP-TL bus.
- Giove European Galileo Navsat navigation system test satellite series. Used the SSTL-900 satellite bus, unlike the production satellites.
Related
- Family
- Navigation
- Country
- Europe
- Launch Sites
- Baikonur LC31
- Bibliography
- 13199
Chronology
2 events
2005 December 28
05:19 GMT - . Launch Site: Baikonur. Launch Complex: Baikonur LC31. LV Family: R-7. Launch Vehicle: Soyuz-FG.- Giove-A - .
Payload: GSTB-V2/A / Heavily modified Surrey MiniSat-400. Mass: 600 kg (1,320 lb). Nation: Europe.
Agency: ESA.
Manufacturer: Surrey.
Class: Navigation.
Type: Navigation satellite. Spacecraft: SSTL-900.
USAF Sat Cat: 28922 . COSPAR: 2005-051A. Apogee: 23,360 km (14,510 mi). Perigee: 23,314 km (14,486 mi). Inclination: 56.20 deg. Period: 849.60 min.
Delayed from September, October, December 26. Galileo In-Orbit Validation Element, a prototype for the Galileo European navigation satellite network. Giove carried carried two rubidium atomic clocks and a large L-band phased array antenna. Retired in 2012 as the production models went on-line.
2008 April 26
22:16 GMT - . Launch Site: Baikonur. LV Family: R-7. Launch Vehicle: Soyuz-FG.- Giove-B - .
Payload: GSTB-V2/B. Mass: 530 kg (1,160 lb). Nation: Europe.
Agency: Starsem.
Class: Navigation.
Type: Navigation satellite. Spacecraft: SSTL-900.
USAF Sat Cat: 32781 . COSPAR: 2008-020A. Apogee: 23,244 km (14,443 mi). Perigee: 23,104 km (14,356 mi). Inclination: 56.00 deg. Period: 842.60 min.
Second European Galileo navigation system test satellite. The booster placed the Giove/Fregat stack on a suborbital trajectory. The Fregat stage then burned to enter a a 170 km parking orbit. The stage burned at least twice more before releasing the satellite into its operational orbit. Retired in 2012 as the production models went on-line.