Nova 8L
Launch vehicle · USA
Original archive entry. The text, images and links below are kept as they were written.

Credit: © Mark Wade
American heavy-lift orbital launch vehicle. Most capable NASA Nova design, studied in June 1960 just prior to selection of Saturn for moon landing. Used a three stage configuration of eight F-1 engines in stage 1, two M-1 engines in stage 2, and one J-2 engine in stage 3. Similar to the Saturn C-8 except in the use of M-1 engines. Unlike other modular Nova designs of the time, this one had the unitary stage construction of Saturn.
LEO Payload: 181,000 kg (399,000 lb) to a 160 km orbit. Payload: 68,000 kg (149,000 lb) to a translunar trajectory.
Stage Data - Nova 8L
- Stage 1. 1 x Nova 60-8-1. Gross Mass: 3,628,000 kg (7,998,000 lb). Empty Mass: 227,000 kg (500,000 lb). Thrust (vac): 61,928.000 kN (13,921,968 lbf). Isp: 304 sec. Burn time: 161 sec. Isp(sl): 265 sec. Diameter: 17.40 m (57.00 ft). Span: 18.00 m (59.00 ft). Length: 41.20 m (135.10 ft). Propellants: Lox/Kerosene. No Engines: 8. Engine: F-1. Status: Study NASA June 1960. Comments: Mass estimated based on total LV weight.
- Stage 2. 1 x Nova 60-8-2. Gross Mass: 680,000 kg (1,490,000 lb). Empty Mass: 54,000 kg (119,000 lb). Thrust (vac): 10,669.000 kN (2,398,486 lbf). Isp: 428 sec. Burn time: 242 sec. Isp(sl): 310 sec. Diameter: 11.60 m (38.00 ft). Span: 11.60 m (38.00 ft). Length: 35.10 m (115.10 ft). Propellants: Lox/LH2. No Engines: 2. Engine: M-1. Status: Study 1960. Comments: Mass estimated based on total LV weight. J-2-powered version of this stage also proposed.
- Stage 3. 1 x Nova 60-8-3. Gross Mass: 227,000 kg (500,000 lb). Empty Mass: 23,000 kg (50,000 lb). Thrust (vac): 892.000 kN (200,529 lbf). Isp: 425 sec. Burn time: 941 sec. Isp(sl): 306 sec. Diameter: 6.70 m (21.90 ft). Span: 6.70 m (21.90 ft). Length: 30.50 m (100.00 ft). Propellants: Lox/LH2. No Engines: 1. Engine: J-2. Status: Study 1960. Comments: Mass estimated based on total LV weight.
Related
- Family
- heavy-lift, orbital launch vehicle
- Country
- USA
- Stages
- Nova 60-8-1, Nova 60-8-2, Nova 60-8-3
- Agency
- NASA
Photo Gallery
Chronology
1 event
1962 April 24
LV Family: Nova. Launch Vehicle: Nova 8L.- Delay in award of a Nova launch vehicle study contract - .
Nation: USA.
Program: Apollo.
The Manned Space Flight Management Council decided to delay the awarding of a Nova launch vehicle study contract until July 1 at the earliest to allow time for an in-house study of bids submitted and for further examination of the schedule for a manned lunar landing using the direct ascent technique.
