Mars Semi-Direct 1991
Mission · USA
Original archive entry. The text, images and links below are kept as they were written.

Credit: NASA
American manned Mars expedition. Study 1991. Mars Semi-Direct was a NASA concept bridge between Zubrin's Mars Direct and NASA's Design Reference Mission 1.0. It was essentially a low-cost version of Boeing's STCAEM.
Mars Semi-Direct Mission Summary:
- Summary: Concept bridge between Mars Direct and Design Reference Mission 1.0; low cost STCAEM
- Propulsion: Nuclear thermal
- Braking at Mars: aerodynamic
- Mission Type: conjunction
- Split or All-Up: split
- ISRU: ISRU
- Launch Year: 1997
- Crew: 4
- Mars Surface payload-metric tons: 40
- Outbound time-days: 180
- Mars Stay Time-days: 550
- Return Time-days: 170
- Total Mission Time-days: 900
- Total Payload Required in Low Earth Orbit-metric tons: 220
- Total Propellant Required-metric tons: 170
- Propellant Fraction: 0.77
- Mass per crew-metric tons: 55
- Launch Vehicle Payload to LEO-metric tons: 105
- Number of Launches Required to Assemble Payload in Low Earth Orbit: 2
- Launch Vehicle: Ares Mars Direct
Related
- Family
- Mars Expeditions
- Country
- USA
- Agency
- NASA
- Bibliography
- 1989