Skip to content
79,433 pages · 13,741 images · since 1994 Browse A–Z Today in space history
Encyclopedia Astronautica The full story of spaceflight
Encyclopedia entry

More Details for 1969-05-09

Original archive entry. The text, images and links below are kept as they were written.

Plan for the Apollo 15 Lunar Surface Science Project

MSC forwarded a plan for the Apollo 15 Lunar Surface Science Project to NASA Hq.

The plan provided for replacement of the ALSEP Array A-2 central station and lunar geological equipment, along with rework of the Passive Seismic Experiment. Total cost of the project was estimated at $6.7 million excluding the cost of surveying instrument and instrument staff. With a May 15 go-ahead, delivery could be made by one year from that date. Apollo Program Director Samuel C. Phillips in a message to MSC Director Robert R. Gilruth approved the plan, saying that a June 1, 1970, delivery of the array would be acceptable and requesting procurement action leading to a definitive Bendix contract be submitted by June 20, 1969.